Installation scenarios. WATSAN M15 ERU 2 Installation scenarios WATSAN M15 ERU 3 SUMMARY OF EQUIPMENT 5 Water pumps (abstraction). Maximum pumping capacity.

Slides:



Advertisements
Similar presentations
Emergency Capacity Building Project Water & Sanitation (WATSAN)
Advertisements

Water Treatment Processes Disinfection and removal of solids.
ERU EMERGENCY RESPONSE UNITS
DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Slovenia: Installation of two Refuelling Stations (HRS) Investor: Centre of Excellence for low-Carbon Technologies. Project objective: Setting up of two.
Institute of Energy & Sustainable Development De Montfort University
1 DDC Datalogger Remote Telemetry/Monitoring and Web Interface.
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
4 th INTERNATIONAL CONFERENCE FOR FIRE CHIEFS IN THE CHEMICAL INDUSTRY Iain Cooke Technical Director The latest technologies being used by fire-fighters.
WATER SUPPLY Murray Biedler July 09, WATER NEEDS Drinking Food Prep Hygiene / Washing Agric / Stock.
FIRST REFERRAL UNIT.
Critical Infrastructure Program Wastewater Sub-sector.
Module 4: Storage and Dispensing Locations. 2 Objective Upon the successful completion of this module, participants will be able to discuss common and.
Flocculation and chlorination process control Jar test and Chlorine demand test.
Water pumping.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment and Distribution in London. Lake Huron & Elgin Area Water Supply Systems London is supplied treated water through the Lake Huron Primary.
1402 Hybrid Firefighter I 6 th Edition Chapter 14 Water Supply.
ERU WATSAN SPANISH RED CROSS Water Treatment Plant SETA.
Module 4: Storage and Dispensing Locations
Wastewater generation
1 Role of Information Technology in Water and Wastewater Management From Water Quality, Performance & Technical Information Management to Finance and Asset.
7-1 NFIRS 7 Haz-Mat Module. 7-2 Optional Haz-Mat Module The Marshal will accept this data This reporting does not take the place of mandated DEP or other.
Water Storage, Transport & Distribution. Water Storage, Transport and Distribution WATSAN M15 ERU 2 Contents 1.Needs 2.Crucial principles 3.Storage 4.Transport.
Learning Objective 1 Explain the ways water supply system components are used by firefighters.
Logistics – important part of our live By Maksimova Valentina College № 31.
GRAVIS GRAVIS - Water, health and education for women and children of Thar.
Lecture 1 Water Distribution Systems
NUMBER OF MENTALLY DISORDERED PERSONS ( POPULATION) Data of State Mental Health Centre of Lithuania.
Fact Training - Water and Sanitation, Geneva April ‘meeting basic water and sanitation (WatSan) needs in post-disaster situations is crucial to.
Procedimientos de Calidad Curso Refresco ERU WATSAN M15 08’ Monitoring & Reporting.
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007.
Selection of Water Sources in Emergency Operations.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
6.7 WASTEWATER QUANTITY Wastewater quantity varies hourly, daily and weekly. Peak flow occurs at maximum flow for the day.
Water Treatment Division Wall mounted. Use of an antiscalant with automatic mixture preparation. Water softener only for boiler Production capacity can.
Water Supply and Sanitation activities: extended approaches! Koestler 03/06 Mexico 06.ppt Goals: - To become a competent and active PNS - To be prepared.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
ERU WATSAN MOD. 15 SETA plant centrifugal pump: Maintenance and replacement.
SETA Water treatment plant maintenance
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Farm RecordS. FRS FRS provides –Planting / sowing records –Ground preparation & cultivation records –Complete harvesting details –Crop storage, –Drying.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
OXFAM-DELAGUA Water analysis kit. OXFAM-DELAGUA water analysis kit WATSAN M15 ERU 2 Contents 1.Components 2.Capabilities 3.Maintenance 4. Summary of bacteriological.
Water Analysis & Control. Water analysis & control WATSAN M15 ERU 2 Contents 1.Chemical parameters and ranges 2.Water sources: Sampling procedures 3.Laboratory.
Whiteboardmaths.com © 2004 All rights reserved
International deployments: Kenya 2006 WATSAN M15 ERU KENYA FLOODS DECEMBER - JANUARY 2006/07 WATER SUPPLY.
Honda factory, Guangzhou, China Objective: provide drinkable water to 5'000 employees.
The Urban Water Cycle. 1. WATER COLLECTION (CAPTACIÓN). Water comes from the Earth’s surface like from rivers and lakes. We can also collect water from.
THE IMPORTANCE OF SANITARY SURVEYS by Mary L. Howell, Backflow Management Inc.
Emergency Response Units (ERU’s)
IFRC emergency response mechanisms, tools and services
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
WatSan ERU/MSM – Generalist training British Red Cross, Bath 24/9 – 1/ The WatSan ERU family and the Mass Sanitation Module (MSM)
Saving lives, changing minds. Medical response in sudden-onset emergencies IFRC CSR Forum – Southeast Asia 16 – 18 Sept I Bangkok.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Muttathara Sewage Treatment Plant - Blue Drops. Features of the plant The only one in the whole of Kerala Started in 2012 Capacity of 107 MLD (million.
It’s all about the water !. WHAT HAPPENS WHEN THE GLASS IS EMPTY? “when people see the change they believe, when they only listen they don’t believe”
Developing innovative and green solutions for the agriculture, food processing industry and water treatments. FEEDING THE PLANET: BETTER PRODUCTION, WASTE.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Lecture (11): Water Distribution Systems
The PlayPump COST: $14,000 World Bank Development Marketplace Award Winner, 2000 Description The PlayPump utilizes a modular play wheel mechanism.
Plumbing system fundamental and design course
Operational Review WASH
High-Capacity Solar Pumping in Refugee Camps
Sewage Tanker Services Sewage Tanker
Unit 7 Connecting to Resources
Module 4: Storage and Dispensing Locations
WatSan Tools for Emergency Response
Presentation transcript:

Installation scenarios

WATSAN M15 ERU 2

Installation scenarios WATSAN M15 ERU 3 SUMMARY OF EQUIPMENT 5 Water pumps (abstraction). Maximum pumping capacity 40,000 l/h 5 Water pumps (abstraction). Maximum pumping capacity 40,000 l/h 5 Open tanks. Capacity 30,000 litres 5 Open tanks. Capacity 30,000 litres 5 Open tanks. Capacity 10,000 litres 5 Open tanks. Capacity 10,000 litres 5 Water treatment plants 5 Water treatment plants 5 Closed tanks. Capacity 10,000 litres 5 Closed tanks. Capacity 10,000 litres 10 Water pumps (distribution). Maximum pumping capacity l/h 10 Water pumps (distribution). Maximum pumping capacity l/h 10 Closed tanks. Capacity litres 10 Closed tanks. Capacity litres 10 Screened closed tanks for water transport. Capacity litres 10 Screened closed tanks for water transport. Capacity litres

Installation scenarios WATSAN M15 ERU 4 MAXIMUM PRODUCTION CAPACITY High quality specialized water 5 water treatment plants working 15 h/day with a production capacity of litres/hour 5 water treatment plants working 15 h/day with a production capacity of litres/hour litres/day For a consumption of 15 litres/person/day (See The Sphere Project) For a consumption of 15 litres/person/day (See The Sphere Project) people

Installation scenarios WATSAN M15 ERU 5 MAXIMUM PRODUCTION CAPACITY Mass water 5 Open tanks. Capacity 30,000 litres 5 Open tanks. Capacity 30,000 litres 5 Open tanks. Capacity 10,000 litres 5 Open tanks. Capacity 10,000 litres Considering a 3 hour period for filling the tank up and water treatment, during a 15 hour working day » The tanks can be filled up 5 times/day  litres litres = litres x 5 = litres x 5 times/day = litres/day  This quantity is in addition to litres of specialized water

Installation scenarios WATSAN M15 ERU 6 MAXIMUM STORAGE AND DISTRIBUTION CAPACITY 5 closed tanks 10,000 litres capacity to store treated water. It is possible to connect waterhorses to these tanks. 5 closed tanks 10,000 litres capacity to store treated water. It is possible to connect waterhorses to these tanks. 50,000 litres of storage and distribution 50,000 litres of storage and distribution 10 closed tanks 5,000 litres capacity to be installed in IDP camps as static tanks. 10 closed tanks 5,000 litres capacity to be installed in IDP camps as static tanks. 50,000 litres of storage and distribution 50,000 litres of storage and distribution 10 closed tanks 5,000 litres capacity and 10 waterpumps of 32 m3/h pumping capacity to be installed on 10 lorries and to directly distribute water to the population and/or static tanks (Calculate the number of loads/cay) 10 closed tanks 5,000 litres capacity and 10 waterpumps of 32 m3/h pumping capacity to be installed on 10 lorries and to directly distribute water to the population and/or static tanks (Calculate the number of loads/cay) litres de distribución

Installation scenarios WATSAN M15 ERU 7

Installation scenarios WATSAN M15 ERU 8

Installation scenarios WATSAN M15 ERU 9 Referral Hospital Daily High Quality Water Needs 150 inpatients x (60 litres + 30 litres) (see Sphere) = 12,500 litres 150 inpatients x (60 litres + 30 litres) (see Sphere) = 12,500 litres outpatients x 5 litres (see Sphere) = 750 litres 150 outpatients x 5 litres (see Sphere) = 750 litres + 30 staff x 60 litres = 1,800 litres 30 staff x 60 litres = 1,800 litres TOTAL ≈ 15,000 litres < 45,000 litres (1 plant daily production capacity)

Installation scenarios WATSAN M15 ERU 10 SUMMARY SUMMARY There is a great variety of installation scenarios due to the multiple number of combinations allowed by the design of the Unit. It is possible to: Produce high quality water and/or water with elementary treatment Produce high quality water and/or water with elementary treatment Distribute water to the population and/or health centres Distribute water to the population and/or health centres Locate the facilities from one to multiple sites Locate the facilities from one to multiple sites Install water distribution points in IDP camps Install water distribution points in IDP camps Install water distribution points in water production sites Install water distribution points in water production sites Distribute water with own means hiring lorries Distribute water with own means hiring lorries

Installation scenarios WATSAN M15 ERU 11Thank you……….