Workshop on Existing Building Energy Efficiency Standards

Slides:



Advertisements
Similar presentations
SERVICE MANAGER 9.2 PROBLEM MANAGEMENT TRAINING JUNE 2011.
Advertisements

DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC Permit and Code Compliance Market Assessment - MAPC 1.
“The Attainable & Sustainable Housing Model” (ASH) ©
H.57 “ENERGY PERFORMANCE DISCLOSURE” February 10, 2011 Richard Faesy, Energy Futures Group.
Risks  All projects have some degree of risk  Risks are issues that can cause problems  Delay in schedule  Increased project costs  Technical risk.
Inspection (c) 2007 Mauro Pezzè & Michal Young Ch 18, slide 1 Photo credit jurvetson on Flickr.com; creative commons attribution license.
Week 7: Requirements validation Structured walkthroughs Why have walkthroughs When to have walkthroughs Who participates What procedures are helpful Thoughtless.
OHT 8.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Review objectives Formal design reviews (FDRs) Participants Preparations.
SE 555 Software Requirements & Specification Requirements Management.
The Solution to Your Product Problems. Overview - What is PDS? ➲ Project Management System ➲ Web Based Easy to use Scalable ➲ Streamlined tools for software.
Procurement Transformation State of North Carolina
Created by: Daniel Hernandez & Bianca Williams.
CATEE CONFERENCE SAN ANTONIO, TX December 18, 2013.
SiteManager Implementation Oklahoma Department of Transportation Charles Thurmon.
My Wallet & Expense Reports FSUN – Brown Bag Thursday, July 23, 2015.
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
California VSP’s. Green it Forward™ Streamlined Online HVAC Permitting Program For Cities & Counties of California April, 2015 Enalasys Corporation.
Needs Assessment: Collecting information, making decisions, and accomplishing results Ryan Watkins, Ph.D. George Washington University Maurya West Meiers.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
Thoughts on Compliance EXISTING BUILDING ENERGY EFFICIENCY INTEGRATED ENERGY POLICY REPORT (IEPR) WORKSHOP JULY 27, 2015.
Needs Assessment Overview Shelley Taylor-Donahue, MPH HIV Services Planner Virginia Department of Health (804)
The BayREN PROP Report: Challenges & Opportunities California Technical Forum July 16, 2015 Wes Sullens.
DNV GL © 2013 Confidential April 10, 2014 SAFER, SMARTER, GREENER DNV GL © 2013 Confidential September 8, 2014 Jarred Metoyer ENERGY HVAC Permit Study.
Cooperative Refurbishment Occupant Participation in Refurbishment Projects of Multi Floor Buildings Michael Ornetzeder.
EGNRET Projects Cary Bloyd EGNRET 27 Zhuhai, China 9-11 October 2006.
SDG&E ® Multi-Family Proposed Whole Building Performance Assessment Don Wiggins Residential Programs Manager San Diego Gas & Electric ® May 11, 2011.
July 7, 2015 New Principal Training Financial Analysis & Training.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Applied Software Project Management
HIPAA PRACTICAL APPLICATION WORKSHOP Orientation Module 1B Anderson Health Information Systems, Inc.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Requirements Management with Use Cases Module 10: Requirements Across the Product Lifecycle Requirements Management with Use Cases Module 10: Requirements.
Electric / Gas / Water Summary of White Paper Findings CPUC SWH Workshop August 26, 2008.
DCRA Green Building Program Overview Created in 2013 Intent: effective implementation of: – Green Building Act (2006) – Green Construction Code – Energy.
CUTTING RED TAPE The Government is committed to cutting £10 billion of red tape To help deliver this Cutting Red Tape programme was launched in July Cutting.
Final Project: Spell Checker & Dictionary By: Pablo R. Rosado Date: July 14, 2004 Course Title: Soft/Hardware Integration Instructor: Dr.Kepuska.
Food hygiene inspection.. Food hygiene inspection Code of Practice Northern Ireland Annex 5. – Type of food and method of handling – Method of processing.
Personal Training Assistant – Sprint#1 Group Gamma.
1 Pioneer Investments Legal and Compliance System Assessment Weekly Status Update June 23, 2005.
NorCalOAUG Training Day Sarbanes Oxley Act of 2002 Complaince initiative for all public companies –in fiscal reporting –audit of controls for manual tasks.
This program is funded by California utility customers under the auspices of the California Public Utilities Commission and in support of the California.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Team assignments in CS 322 “Data Structures & Algorithms II” Jey Veerasamy CIS Adjunct Faculty Baker College Online.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
The BayREN PROP Report: Challenges & Opportunities California Energy Commission May 7, 2015 Wes Sullens.
CS 4311 Software Design and Implementation Spring 2012.
CS 4311 Software Design and Implementation Spring 2013.
Course Summary surveys.12.ppt CS 121 “Ordering Chaos” “Mike” Michael A. Erlinger.
CHAPTER Systems Analysis and Design. 13 © The McGraw-Hill Companies, Inc Objectives Phases of systems life cycle –ID needs and possible.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Nevada Department of Education Office of Educational Opportunity Nevada Comprehensive Curriculum Audit Tool for Schools NCCAT-S August
Building & Safety Department June 10, Mission Statement To protect the health, safety, and general welfare of the citizens of the community through.
Air conditioning Repair Companies in Greenville, NC
June 2008Mike Woodard Rational Unified Process Overview Mike Woodard.
C. What is a Feasibility report
Role of the Systems Analyst
Systems Implementation,
Systems Analysis and Design
Global Connections Day Building Safety Service Provider
Capital Facilities Program Update San Rafael City Schools
Software Quality Engineering
What You Don’t Know About the QAD Learning Center
California VSP’s California VSP’s.
Planning and BMPs for Capital Improvement Projects
City of Ventura Green Building Standards
Joint Application Development (JAD)
DENTAL AMALGAM RULE 40 CFR Part 441
Presentation transcript:

Workshop on Existing Building Energy Efficiency Standards Brian Selby, Principal Selby Energy, Inc. July 27, 2015 Title 24 Part 6 Essentials — Residential Standards for Plans Examiners and Building Inspectors

Background and Experience 30+ years residential building design Energy Consultant since 1986 HERS Rater since 2001 (HERS I & II) Certified Energy Analyst (CEA) CABEC board member CIAG member Instructor: Title 24 Essentials courses for the Statewide C&S Team and Energy Code Ace

Focus on Solutions not Problems Title 24 Part 6 Standards Focus on Solutions not Problems We all know what the problems with compliance are: It’s too complicated It’s too expensive Too much of a hassle Too many forms Not enough time to enforce Not enough resources to enforce My competitor isn’t doing it Etc… …but what are we doing about solving them?

Standards Implementation How can compliance be assessed and improved? We need to first understand the extent of the problems before developing lasting solutions How can compliance be assessed? Leverage what’s currently being done to assess compliance Compare building department permit data to HERS registries How can compliance be improved? Change the way we do compliance!

Standards Implementation Why are compliance documents required and how can they be improved? Prioritize compliance measures Plan check and inspect the highest priority measures first Develop user centric compliance forms At a glance measure summary Develop a compliance form that provides value to the owner/occupant Streamline the installation form process

Standards Implementation What can be done to reduce the transactional cost of compliance? Streamline the installation documentation process (CF2R) Provide a Performance based construction phase compliance approach This approach would allow HERS raters to verify ALL energy efficiency measures Utilize an AS-BUILT model as an alternate approach to providing a CF2R and CF3R

Questions or Comments Contact Information: Brian Selby brian@selbyenergyinc.com Selby Energy, Inc. (209) 352-2281