Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Elton S. Smith University of Virginia October 25, Overview Bremsstrahlung Tagging Spectrometer and Photon Beam Review Elton S. Smith Jefferson Lab.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
HPS Budget and Schedule Marco Oriunno, June 4-6, 2013 HPS Collaboration Meeting, JLAB.
Discovering New Particles with Cloud Computing G. Fox and A. Szczepaniak postdocs: Peng Guo Vincent Mathieu (joint funding IUCRG/Jefferson Lab, VA) Geoffrey.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Jefferson Lab Presentation to Teacher Education Program November 8, 2006 Subatomic Particles: What do we study at Jefferson Lab? Dr. Allison Lung 12 GeV.
Experiment HUGS 2011 – Jefferson Laboratory Hussein Al Ghoul Department Of Physics Florida State University ᵠ.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Our First Meeting since the signing of CD-0 Welcome to visitors from ORNL and Tennessee Over 40 people are attending Welcome to first-time visitors to.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
Drift Chamber Review March 6-8, Overview of Requirements Forward and Central Drift Chambers Elton S. Smith Jefferson Lab Physics goals Overview.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Collaboration Meeting Alex Dzierba Indiana U March 16-17, 2001 at JLab 1.Progress since our last meeting 2.NSAC Issues 3.Preparing the Conceptual Design.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
SoLID review DAQ recommendations Alexandre Camsonne.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Technological, financial, managerial risks Some issues of: V. Kekelidze V.Kekelidze, MAC1.
Construction of Computational Segment at TSU HEPI Erekle Magradze Zurab Modebadze.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
1. Progress Report Science of Confinement The spectroscopy of light mesons led to the quark model and QCD: mesons are quark-antiquark color singlet.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Collaboration With DTTN 30 Aug Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure.
Grid Computing Jeff Templon Programme: Group composition (current): 2 staff, 10 technicians, 1 PhD. Publications: 2 theses (PD Eng.) 16 publications.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
LQCD Computing Project Overview
CLAS12 First Experiment Workshop Report
Preparations for a Lehman Review
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Status, Misc Elton Smith Feb 21, 2003.
Preparation of the CLAS12 First Experiment Status and Time-Line
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
SOLID Collaboration Meeting
Preliminary Project Execution Plan
Presentation transcript:

Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003

Welcome Prof. Hara Pertidou U of Thessaloniki - Greece Prof. Jim Pinfold U of Alberta - Canada Prof. Marco Reyes U of Guanajuato - Mexico.. And other visitors and thanks to our JLab hosts

Good News

20-yr Plan

From Congress

Senate

Reviews Electronics - July 2003 Calorimetry & Tracking Software Theory? Lehman review (~ 1 yr)

Software Issues PWA and phenomenology  NSF PWA center - GlueX/CLEO-c  Other proposals Simulations/Reconstruction  Ed Brash/Richard Jones/Maciej Swat  Lehman review preps GRID  Coordinate with Lab  G. Fox DAQ  Coordinate with Lab/Tim Smith?

System Requirements

Funding Coordinated NSF/DOE supplementals CDRF and ISTC - US/Russia Joint Canada/Mexico/US Requests for R&D to JLab Theory requests Computer science

Collaboration Commitment Nature of MOU’s  Physicists  Technical Staff  Other experiments Adding/Removing Collaborators  Guidelines  Implementation

Equipment that Could be Completed Magnet  End-plate holes?  Energize at IUCF? LGD  Evaluate glass/pm’s  Frame, wall, monitor  Electronics

Projects that could be completed soon Development of amplitude parameterization  isobar model  Deck effect  unitarity, analyticity,  particular attention to incident photons

Equipment Issues Tracking  Design & manpower?  Vertex region Calorimetry  Barrel readout  Prototypes  Upstream Particle I.D.  Re-visit Cerenkov  TOF - OK  Magnetic issue  Forward/Cal - TOF - Cerenkov package

Infrastructure Building  Can we go to architect? Beam  Beam line design  Tagger design  Tagger magnet  Coherent multiple scattering? Subsystem Integration  Use BarBar as paradigm

Schedule Current schedule is painfully slow Build the Hall and beamline before upgrade Investigate physics at lower energy Stage equipment installation

Analysis/Phenomenology Amplitude Analysis  Understand ambiguities  Improve algorithms/throughput  Analysis of extant data Phenomenology  Critique of isobar model  Model for backgrounds  Understand ‘theory’ systematic errors

Conclusions There’s a lot to do Let’s get busy