Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013.

Slides:



Advertisements
Similar presentations
Ireland Stat Fiachra Kennedy Central Expenditure Evaluation Unit Department of Public Expenditure & Reform.
Advertisements

Water in the West: Current Use and Future Challenges Christopher Goemans, Ph.D. Agricultural and Resource Economics 13 th Annual Farmers Cooperatives Conference.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Farm Service Agency Farm Loans Program Lender of First Opportunity.
Economic Analysis March 2004 Maine Economic Principles.
Department of Agricultural Economics Kansas State U N I V E R S I T Y Pasture lease rates Department of Agricultural Economics Kevin.
Groundwater as a Statewide Resource Professor Richard E. Howitt Agricultural & Resource Economics, UC Davis Professor Jay R. Lund Civil & Environmental.
The wealth of waste Key economic principles of water reclamation and reuse and the steps to apply them in practice in real cases Ingo Heinz (University.
Miguel Henry Department of Resource Economics University of Nevada, Reno December 2005 Empirical Risk Analysis of Grape Production in the Fallon Area,
Nathan Burley, Josue Medellin-Azuara, Sachi De Souza, Jay Lund, Richard Howitt University of California, Davis.
Gunnison Basin Implementation Plan Presentation to the Colorado Water Conservation Board July 16, 2014.
The Effects of Different Land Uses in Missouri on Local Fiscal Conditions – Cost of Community Services Project Update – 4/12/02.
Nathan VanRheenen Richard N. Palmer Civil and Environmental Engineering University of Washington Recasting the Future Developing.
Jordan River Rehabilitation Project March 22 nd /6/20151.
North-of-the-Delta Offstream Storage Investigation Planning and Timeline “Planning is bringing the future into the present so you can do something about.
One Corps Serving The Army and the Nation Water Supply FY 05 Program Development Ron Conner.
Drought and the Central Valley Project August 2014.
Use of Regional Agricultural Economic Models for Policy Analysis Stephen Hatchett CH2MHILL.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
The impact of budgetary resources of financing investment decision.
Economic Analysis of Water Supply and Water Quality Benefits IRWM Round 2 Roger Mann Lorraine Marsh Steve Hatchett Jerry Horner.
NED COSTS And Other Bewilderments Of COE Planning And Other Bewilderments Of COE Planning.
 Integration with other models  Evaluate simultaneous (and inter-related) policy changes  Linkage to I/O models  Motivating the analysis  Key question.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Illinois RC & D Introduction to R esource C onservation & D evelopment Module 3: What makes it run?
WLI REGIONAL KNOWLEDGE EXCHANGE WORKSHOP ON DECISION-SUPPORT TOOLS AND MODELS SEPTEMBER, 2013, JERBA, TUNISIA Economic analysis of improved water.
Townley Chapter 7 Problems in Project Evaluation.
“Assessing Costs and Benefits of Adaptation: Methods and Data” First Regional Training Workshop – Capacity Building Programme on the Economics of Adaptation.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
The Pressures on Water Supply: Surface Water Dagmar Llewellyn, Reclamation Albuquerque Area Office WATER RESILIENCE IN A TIME OF UNCERTAINTY: H OW C AN.
Colorado River Basin Water Supply and Demand Study Next Steps: Agriculture Conservation, Productivity, and Transfers Workgroup Urban Water Institute Conference.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
Senate Enrolled Act No. 369 Update Indiana’s Water Shortage Plan.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
1 Climate Warming & California’s Water Future Jay R. Lund, Richard E. Howitt, Marion W. Jenkins, Tingju Zhu, Stacy K. Tanaka, Manuel Pulido, Melanie Taubert,
ACT & ACF Draft Programmatic Environmental Impact Statements SAD Water Supply Conference Wilmington, NC David Luckie (CESAM-PD)
1 Development of Common Assumptions Common Model Package for the CALFED Surface Storage Investigations Presentation To: California Water and Environmental.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
1 Using Scenarios in the California Water Plan. 2 Overview ● Background ● Update 2005 scenario narratives ● Analysis performed for Update 2005 ● Scenarios.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting March.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Assign Annual Demand for a Purpose CALSIM Simulation Compare the Long-term Average Annual Friant Unit Delivery to Benchmark Study CALSIM Simulation Completed.
EM 4103: Urban Planning II Lecture 8: Employment Analysis in Planning.
4 Accounts and the Role of RED & OSE Economic Analysis -- Water Resources Planning March 23, 2009.
A Risk Analysis of Adjusted Gross Revenue-Lite on Beef Farms Art Barnaby, Jeff Williams, Andrew Saffert, and Michael Langemeier Department of Agricultural.
Klamath ADR Hydrology Report Modeling Results Historical Record and Instream Claims Model Accuracy Jonathan La Marche KADR Hydrologist3/11/2000.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Slide 1 February 21, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Water Supply Reliability Oakdale Irrigation.
Multi-objective Optimization
California Water Plan Update Advisory Committee Meeting January 20, 2005.
California Water Plan Old and New Steve Macaulay, Executive Director.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
1 Formulate Alternatives Planning Step 5. 2 Social Science Activities in Land Use Planning Planning Steps Social Science Activities Steps 1 & 2: Identify.
FY 2011 Organizational Initiatives October 12, 2010.
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
1 California Water Plan Update 2009 Assumptions and Estimates Report.
Allocation of Ogallala Groundwater Supplies
Farhad Farnam, RPSIII, RA Economics Analysis Section
Presentation transcript:

Central Valley Project Cost Allocation Study -- Irrigation and Municipal & Industrial (M&I) Benefits Public Meeting August 9, 2013

Meeting Purpose –Project Status –Water Supply Benefit Analysis Approach (Irrigation and M&I) –Next Steps CVP-CAS (Central Valley Project Cost Allocation Study)

Background –Cost Allocation Study Purpose and Process –Summary of 5/17/12 Meeting Water Supply Modeling Analysis Approach CVP-CAS (Central Valley Project Cost Allocation Study)

CVP-CAS Schedule Flood Control and Navigation Analyses Power Analysis Public Outreach Hydrology Modeling, Cost Estimating, & Benefit Analyses Methodology and Assumptions Period of Analysis Commissioner’s Decision Final Allocation Write and Approve CAS Report Allocation to Recreation Recreation Analysis Power Benefits Water Supply Analyses Water Supply Benefits Facilities Inclusion List Recreation Benefits Water Quality Benefits Water Quality Analysis Fish & Wildlife Analysis Fish & Wildlife Benefits Write and Approve Report

CVP-CAS Schedule Legend Methodology and Assumptions Hydrology, Cost Estimating, Benefit Analysis Write and Approve CAS Report Public Outreach Reclamation Final Decision Leadership Team Concurrence Decision Deliverable

CVP-CAS Historic EV Summary

Three Water Supply Benefit Project Purposes: –Irrigation –Municipal & Industrial (M&I) For each water supply project purpose, the general annual economic benefit estimation approach involves multiplying: Value per acre foot (AF) * Annual Water Deliveries (AF) Water Supply Benefit Analysis Approach

CalSim Hydrology Modeling –BOR Hydrologist working with Central Valley Operations Office –Includes Biological Opinions Economic Analysis –Irrigation Deliveries –M&I Deliveries CalSim Input and Economic Analysis

Justifiable Expenditure: –One step of the Separable Cost-Remaining Benefits (SCRB) cost allocation methodology. –Represents the maximum amount to be allocated to each project purpose. –Calculated as the lesser of the multi-purpose project benefits or single-purpose project costs for each project purpose. Benefits (Future and Historic) and Justifiable Expenditure

If future benefits are greater than single-purpose costs, then the justifiable expenditure is equal to the single-purpose costs. Additional benefit analysis is not necessary. Future Benefits and Justifiable Expenditure Water Supply Allocation IrrigationM&I Future Benefits$80$50 Historic Benefits --- Estimated SPA Costs$60$40 Justifiable Expenditure$60$40

If future benefits are less than single-purpose costs, historic benefits are estimated & added to future benefits before comparing to single-purpose costs to determine justifiable expenditure. Future and Historic Benefits and Justifiable Expenditure Water Supply Allocation IrrigationM&I Future Benefits$40$30 Historic Benefits$10$20 Total Benefits$50 Estimated SPA Costs$60$40 Justifiable Expenditure$50$40

Two Options for Estimating Future Irrigation Benefits: –Use SWAP Model to estimate future cropping patterns and irrigation benefit values. –Use SWAP Model to estimate future cropping patterns and Farm Budget Tool to estimate irrigation benefit values. Irrigation Benefits Methodology

Objective: Identify changes in net farm income generated by the CVP from a national perspective Two approaches: –State Water Agricultural Production Model (SWAP) –Reclamation Farm Budget Tool Irrigation Benefit Methodology

Analytical Process: –Identify the change in crop acreage “with” and “without” the CVP. –Use SWAP Model or Farm Budget Tool to measure the changes in per-acre net farm income by crop related to the change in crop acreage. –Transform the $/acre benefit value into $/AF Estimating Irrigation Benefits

SWAP is a widely accepted basin-level agricultural impact model for the Central Valley of California. Purpose: to dynamically estimate the change in irrigated acreage for the Central Valley given a change in CVP water deliveries. Output: changes in irrigated acreage and net agricultural income. SWAP Model

Reclamation’s Farm Budget Tool is a spreadsheet application that allows the user to develop and analyze farm-level crop enterprise budgets in accordance with Reclamation Policy. Purpose: to measure the change in net farm income by crop given a change in acreage. Output: net farm income for each crop included in the analysis. Reclamation Farm Budget Tool

SWAP Interface with CALSIM SWAP is well-accepted model SWAP provides faster turnaround on analyses SWAP used for future benefits only Farm Budget Tool can be used for historic and future benefits –However, future cropping patterns must be projected. Irrigation Benefit Estimation Considerations

Objective: Identify value of M&I water supply: Two Approaches: –Demand model to estimate the value of water for M&I purposes –Cost based approaches (i.e., cost minimization and forgone use) M&I Benefit Methodology

The Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies (P&G’s) indicate the general measurement standard of value is willingness to pay (WTP). M&I Benefit Methodology

The P&G’s also indicate that other approaches can be used to estimate benefits when market based measures of WTP are not possible. One alternative method includes cost based approaches. M&I Benefit Methodology

M&I benefits as measured by consumers WTP can be estimated through the use of previously developed M&I demand models. M&I benefits using a cost based/forgone use approach can be estimated using models such as the Least Cost Planning Simulation Model (LCPSIM) and others. M&I Benefit Methodology

Statistical models have previously been developed by BOR using data from 11 water agencies in California and Nevada. Additional models will be run to include only California data. An economic value per acre foot will be obtained from these models, representing an average benefit. Demand Model Based Approach

If the demand model approach is not used, a least cost modeling approach (e.g. LCPSIM) would be used. This approach is based on management strategies that minimize costs given regional demand and supplies. –Shortage losses are measured in terms of forgone use or opportunity cost. Cost Based - Forgone Use Approach

The demand model approach provides estimates of WTP. The demand model approach based on M&I use provides a relatively high estimate of benefits compared to a more conservative value estimated using a cost of service or forgone use approach. M&I Benefit Estimation Considerations

Previous California surface storage planning studies have primarily used the cost based – forgone use (LCPSIM) approach. M&I Benefit Estimation Considerations

Public Document to Address Comments and Responses Continued Refinement of Process and Schedule Upcoming Public Meeting –November 15, 2013 CVP-CAS Next Steps

Brooke Miller-Levy, Project Manager CVP-CAS