QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

Slide 1 October 2011 Verification for polar regions  Scores computed for polewards of 65°  NB proposed for CBS is polewards of 60°  Verification at.
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Don Blackburn Vice Chair
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
A Glimpse Into Summer: Evaporating Demand Proprietary and Confidential 1 Melissa Westaway Meteorologist/Demand Forecaster.
Passive Investors and Managed Money in Commodity Futures Part 2: Liquidity Prepared for: The CME Group Prepared by: October, 2008.
Author: Sali Allister Date: 18/10/2011 COASTAL Google Analytics Report June 2011 – September /06/2011 – 08/09/11.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Market Operations Presentation ERCOT Board of Directors October 21, 2008 Updated as of 10/21/08 Betty Day.
Renewables International, September Wind and Solar PV in France Up to August 2013 Bernard CHABOT Renewable.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
2016 Long-Term Load Forecast
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Final Report on Fast Responding Regulation Service (FRRS) Pilot Project TAC March 27th, 2014.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
August 2013 Performance Report RM Education Stoke BSF and Stoke CIS.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
Graham Generation and the Market – The Facts October 8, 2008.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
Responsive Reserve Service Deliverability Review September 15,
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1 Cutover Daily Call 10:30 AM November 23, :30.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Market Operations Presentation Board of Director’s Meeting December 13, 2005.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
Ahmed Kaloko, Ph.D. Director Bureau of Conservation, Economics & Energy Planning Harrisburg PA COMPARISON OF PJM-ISO WITH CALIFORNIA-ISO Pennsylvania.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
GREDP Monitoring QSE Manager’s Working Group December 15, 2010.
MAPE Publication Neil McAndrews For Bob Ryan of Deutsche Bank.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
QMWG June 2012 Generation Resource Energy and Regulation Deployment Summary.
Principal Load Profiling and Modeling
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Non-IRR GREDP < 85% August 2017
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
May 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 6/8/2012.
2017 NAEP RESULTS: DC PUBLIC CHARTER SCHOOLS
Draft 2013 Energy-Efficiency Forecast
April May April May June July July June August Sept August
Presentation transcript:

QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance

2 GREDP –NON-WIND Summary Conventional Resources - September –311/312 scored above 90% 1 failure SCGT90 Scored ½ hour for the month of September with average error of 2 MW. Non-wind resources scoring >85% in previous summer months were resources with very low Capacity Factors August /319 July 307/308 June313/315 May287/292

3 CONTROL PERFORMANCE (September) CPS1(167) trending favorably –Consistently scoring 160+ this summer –Slightly lower than July and August 2013 CPS2 (98.84) has improved from 2012 –August performance particularly impressive (99+) ½ of the days perfect score 2012 CPS2 trended very positively Passed 2012 CPS2 (ERCOT Waiver) Other ISO CPS2 performance declined over the same period –Other Improvements observed –Ramping periods RMS1 decreased Startup/shutdown improved performance –Overall RMS1 declining in 2013 Up slightly in September from August

4 WIND AND RENEWABLES Summer 2013 Scoring consistent/above previous years in the summer –Reduced congestion (Slide 7) with similar or increased Energy from Wind (Slide 5) and GREDP scores SEPT 2013 –58 scored/21exceeded 95% GREDP Monthly –2,250 intervals scored, 1,950 intervals passed (86.5%) –July & August intervals ↓ sharply (slide 6) –3 resources 100+ intervals/>95%: 94%(112), 71% (115), 92%(142) –Recent analysis indicates a very positive trend from previous summers. Significant issues reduced/mitigated Recent months indicate resources line up with technology

5 Wind Energy Ratios and Totals Total Energy (GWH) % Wind Energy INTERVALS SCORED MAY 20112, %39, ,6009%19, , %7,600 June 20113, %46, , %9, , %4,000 July 20111, %2, , %1, , %283

6 Congestion Management Congestion in wind areas has dropped off in 2013 –CREZ lines energized earlier in summer –Reduction in intervals scored No reported or observed issues regarding Congestion Management. –No Inter-zonal Interface limit issues in West No issues in Q2 or Q One instance in Q1 –Forced outage initiated a unit-step drop in the west-north flowgate –Immediately resolved by Wind redispatch

7 Summer IRR GREDP Summary and Congestion Trends MayJuneJuly Average GREDP91%83%94% Scored Scored < 95%43345 DEVIATION Ave rage INTERVALS7,6004, PASSED7,0003, >100 intervals294535