Taking EDM to the Enterprise 07-06-2006 Plant Engineering Life Cycle conference (PELC) – The Hague Practical experiences with implementing an efficient.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Configuration Management
1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
Configuration Management
RED HAT PRODUCT FOCUS 3/17/14 – 3/28/14 INTRODUCTION Our Product Focus for the next two weeks is Red Hat. Red Hat is a maker and distributor of enterprise.
Records Management for UW-Madison Employees – An Introduction UW-Madison Records Management UW-Archives & Records Management 2012 Photo courtesy of University.
Enterprise Content Management Pre-Proposal Conference for RFP No. ISD2006ECM-SS December 6, 2006 California Administrative Office of the Courts Information.
Eleventh Edition 1 Introduction to Information Systems Essentials for the Internetworked E-Business Enterprise Irwin/McGraw-Hill Copyright © 2002, The.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 Project Management: A Managerial Approach Chapter 13 – Project Termination.
Introduction to Systems Analysis and Design
Author(s): David A. Wallace and Margaret Hedstrom, 2009 License: Unless otherwise noted, this material is made available under the terms of the Creative.
The Benefits of ISO 9001…. Copyright ©2008 The 9000 Store.
OHT 2.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software Quality assurance (SQA) SWE 333 Dr Khalid Alnafjan
Introduction to BIM BIM Curriculum 01.
The Benefits of ISO 9000…..
CS 4310: Software Engineering
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Management Information Systems
Process Safety Management
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
SOFTWARE ENGINEERING1 Introduction. Software Software (IEEE): collection of programs, procedures, rules, and associated documentation and data SOFTWARE.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 10 Information Systems Analysis and Design
1 Martin Zralý: ENTERPRISE MANAGEMENT CONTROL Department of Enterprise Management and Economics Faculty of Mechanical Engineering, Czech Technical University.
UKSMA 2005 Lessons Learnt from introducing IT Measurement Peter Thomas –
Title Page programmemanagementsystem KPMD (IT Solutions) Ltd Blades Enterprise Centre, Bramall Lane, Sheffield S2 4SU, United Kingdom telephone: +44 (0)114.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
1 Advanced Software Architecture Muhammad Bilal Bashir PhD Scholar (Computer Science) Mohammad Ali Jinnah University.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
CSE 102 Introduction to Computer Engineering What is Computer Engineering?
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
ISO/IEC 27001:2013 Annex A.8 Asset management
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Engineering and Management of Secure Computer Networks School of Engineering © Steve Woodhead 2009 Corporate Governance and Information Security (InfoSec)
ISO DOCUMENT CONTROL. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to: 
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
Constance1 Archives de France Centre des Archives Contemporaines CONSTANCE : Twenty years of data bases archiving ERPANET WORKSHOP Bern April
University Retention Schedule Training. Introduction to the University Retention Schedule.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Siebel Migration Assessment with Microsoft Consulting Services Assess whether your Siebel implementation is the right Solution for your current and future.
The Records Management Vision The Records Management Vision: Our Journey Towards Solutions for Everyday Life Ronald G. Smith, CRM Records and Information.
Slide 1 Software Construction Software Construction Lecture 3.
JPPF MEETING th MARCH 2013 BIRCHWOOD CONFERENCE CENTRE JPPF March S.GOVENDER.
Advanced Higher Computing Science The Project. Introduction Worth 60% of the total marks for the course Must include: An appropriate interface using input.
Advanced Higher Computing Science
Guide for Excel Integration Fusion CRM ADFdi
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software Project Configuration Management
microsoft dynamics ax training philippines
Software Configuration Management
Systems Analysis and Design
CMGT 445 Competitive Success/snaptutorial.com
CMGT 445 MASTER Lessons in Excellence--cmgt445master.com.
CMGT 445 Education for Service/snaptutorial.com
CMGT 445 Teaching Effectively-- snaptutorial.com.
Project Integration Project integration management processes :
Experience with an IT Asset Management System
Systems Analysis and Design
CSSSPEC6 SOFTWARE DEVELOPMENT WITH QUALITY ASSURANCE
Project Management Process Groups
Managed Content Services
How to build your Integrated
Fertilizer Industry Safety Information Analysis and Sharing Program
DRAFT ISO 10007:2017 Revision Overview Quality management – Guidelines for configuration management ISO/TC176 TG 01.
Presentation transcript:

Taking EDM to the Enterprise Plant Engineering Life Cycle conference (PELC) – The Hague Practical experiences with implementing an efficient and controlled Engineering Drawing Improvement Environment for NAM Offshore Guus van Jarwaarde, DINTEC

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise2 The Fire Triangle Lessons learnt: There are 3 elements required for combustion  awareness If any side is missing the fire can not start  prevention If any side is removed the fire will go out  control There is a 4 th dimension, called chain reaction Simplification of a complex topic

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise3 Overview Archiving versus document quality Assets versus document quality Organizational issues versus document quality Justifications used The critical success factors Sub-optimal solutions Summary EDM Triangle

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise4 Archiving requirements  (Inter)national Legal and Industrial regulations -) ISO, CE marking,...  Safety and Integrity -) Company internal  Engineering, Operational, Maintenance,... -) Information value  Other -) Economical / Efficiency / Historical reasons,... Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise5 Archiving issues  General archiving requirements -) find, read, update, in-time, accurate and complete  Digital archiving issues -)Advantages (faster finding & updating, sharing, integration,... ) -)Complex, various file formats, various versions, limited durability: limited storage life, media type, hardware, application software,... Digital  Requires more attention! Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise6 What file format is this digital file? Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise7 Answer: Microsoft Excel This can be acceptable or not acceptable – decide what templates to be used Remark: is this the most efficient way to mark-up (red-lining) information ? Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise8 AutoCAD issues Various fonts used in this drawing were not delivered  affects readability Example of hidden costs Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise9 More complex file formats (hybrid files) A scanned drawing (tif format) has been digitally modified. The result is 2 physical files representing 1 drawing. Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise10 A few Archive recommendations  Manage digital files, based on accepted file types and supported versions (incoming and stored)  Remember the more exceptions the more difficult to manage  Set-up and maintain company document standards - accepted file types and versions - drafting and delivery standard - engineering drawing standard showing what to maintain (keep As Built) Doing all this helps to obtain better ARCHIVE control !!! Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise11 Assets and document quality Business controls: range of standards, procedures, regular reviews / audits Graph shows a reactive approach. Pro-active is more efficient and gives more control Organization Archiving Asset pro-active approach Initial documentation status Business Controls Uncontrolled progression Audit / Review Influences: - Asset modifications - Changes to operation conditions - Introduction of new staff -... Time Technical Integrity

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise12 Assets and document quality – As Built activities Determine also per discipline what types of drawings need to be kept up-to- date (As Built), e.g. P&ID, Isometric, Single Line, Cause & Effect Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise13 Assets and document quality – Control As Built activities Engineering Process Project Specificatie Detailed Design Materials & Procurement Construction Commissioning / Start-up Handover / Close-out Operations / Maint ModificationsNew Assets D R A W I N G MGMT S Y S T E M DMS OrganizationArchive Drawing Control As Built Team content control administrative control Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise14 Additional costs Costs Time Not following documentation standards during the engineering process will result in much higher (and most of the time hidden) additional costs. Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise15 Organizational issues versus document quality Mgmt Engineering... EDM Operations & Maintenance... Efficient Engineering Document Management is the integration of data, standards and systems amongst all parties involved! Span of control Organization Archiving Asset

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise16 Justifications used  Look at Treats & Opportunities: - treats: legal, safety, integrity, technical reliability - opportunities: integrate with other developments  Look at inefficienties and savings: - make a financial analisys (ROI)  Use supporting figures - e.g. for drawings: - opening each file & extract info cost > 1 manyear - say that the development of 1 drawing cost € 500,=. The investment is in total € This is an asset by it self and requires regular maintenance and from time to time a rejuvenation.

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise17 The critical success factors  Get active support from highest management as well as a broad basis for support in the organization  Step by step (fased approach) - takes longer (is not critical) - justification is easier - costs can be spread - every next improvement step should be in line with the previous one(s)  Get external expertise t

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise18 Sub-optimal solutions  If the EDM system does not provide the required functionality  The present information might be not correct or fit for purpose and need updating before migrating to a new environment (garbage in  garbage out). Advice: do not postpone updating!

© DINTEC and Cyco Software B.V. – Taking EDM to the Enterprise19 Summary  Engineering Document Management has become a more and more complex asset to manage. Focus on all 3 areas of the EDM triangle.  Focus also on the 4 th dimension: the Engineering Drawing Management System (EDMS)

Taking EDM to the Enterprise Plant Engineering Life Cycle conference (PELC) – The Hague Practical experiences with implementing an efficient and controlled Engineering Drawing Improvement Environment for NAM Offshore Guus van Jarwaarde, DINTEC For more information: Please visit the CYCO information stand Contacts: or