Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Entry Capacity Substitution Workshop 5 – 5 th December 2008 Review and Options for Development.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 8 – 7 th April 2009.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Planning Code
Transmission Workstream, 2nd March 06
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Entry Capacity Substitution
Long Term Non Firm Capacity Update
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
The Treatment of “Spare / Sterilised” Capacity
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses

2 Introduction  Last PCR introduced several fundamental changes to the entry regime which included Entry Capacity Substitution  A key intention of the policy measures is to ensure that capacity does not become sterilised, i.e. an obligation at one ASEP where capacity is not required does not prevent use of that capacity elsewhere.  Key Licence deliverables are;  Entry Capacity Substitution Methodology Statement  Submit to the Authority for approval by 6 th January 2009  Amendment of Incremental Entry Capacity Release Methodology Statement to include substitution.  On 1 st February National Grid issued consultation document seeking views on a range of issues.

3 Capacity Available for Substitution. What proportion of baseline capacity should be withheld from QSEC auctions (and substitution) for use in later auctions (the current Licence requirement is 10%)? Proportion withheld 20%> 10%zero% In favour711 Other comments Prevents development of liquid secondary capacity market

4 Capacity Available for Substitution. Should allocated capacity or forecast flows be used in defining substitutable capacity? Licence defines substitution of “unsold non-incremental obligated entry capacity”. Would forecast flows impact TBE data? Definition of sterilised capacity Above forecast flows Above allocations In favour53 Other commentsNeed to consider projects in developments Impact of TBEYes = 4No = 2 Alternative suggestion Use previous year’s peak flow.

5 Single Quarter Problem.  Where capacity is currently booked at an ASEP for a single quarter in the future should this prevent capacity at that ASEP, to the level booked, being available for substitution in the period prior to that booking?  Users say this should not prevent substitution but a workable solution is not evident at this stage. In favourAgainst Should this prevent substitution?15 Create rules to prevent short-term, distant, bookings?13 Should substitution be time limited?3 + 1 maybe1 Should a surrender mechanism be created?41

6 Lower NPV Test.  Should different User Commitment tests be applied for incremental capacity satisfied from substitution and from investment?  Comments  Combined Substitution / Investment & Competing Bids is complex, but should not be an issue with a single test. In favourAgainst Same Test61 (relate to actual costs)

7 Exchange Rate Cap. To avoid excessive capacity degradation should capacity substitutions be prohibited if the exchange rate exceeds a specified value? If yes, what should the cap on exchange rates be? Cap on Exchange Rates <=1.5:12:1<10:110:1Don’t knowNo cap

8 Availability of Capacity for Substitution.  Should National Grid substitute capacity to release incremental capacity ahead of 42 months?  If yes, should any limit be placed on the timing of such release, e.g. 18 months, 30 months?  Should substitution be limited to single donor ASEP or should combinations (substituted at different times) be allowed?  Responses  Mainly in favour of early release (from 18 months) provided capacity has previously been available in AMSEC.  Is this feasible? QSEC / AMSEC do not overlap sufficiently.  Impact on incentives to be considered.

9 Other Issues.  New Entry Points  Support for a delaying substitution until a “regular” QSEC auction.  Unlikely to be an issue with April 2009 implementation date.  Assuming UNC mod implemented for April 2009 QSEC.  Alternative Economic Test / User Commitment  No support for changing now.  Willing to review.  Reserve Price Discounts  Conflicting views; 1 totally against discounts, 3 in favour.

10 Other Issues.  We would be interested in people’s thoughts as to how the substitution process may impact upon other elements of the entry capacity regime.  6 respondents specifically commented on the need for more time to consider potential consequences  5 refer to a “holistic” approach; consider interactions.  4 respondents identify potential price increases as a consequence of substitution  1 reference to regulatory Impact Assessment.

11 Next Steps  Arrange workshops  Establish workgroup.  Develop policy / processes.  National Grid to draft  Entry Capacity Substitution Methodology Statement  Contains process to identify donor ASEPs and quantities.  Incremental Entry Capacity Release Methodology Statement  Likely to include most of the business rules to be developed  National Grid consultation to commence Nov 2008  Submit to Authority for approval by 6 th January 2009  May need to be earlier to accommodate Impact Assessment