1 2007 ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
Arizona Corporation Commission Workshop
Arizona Electric Power Cooperative, Inc RFI Bidders’ Conference April 4, 2014 Tempe, Arizona.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
Arizona Electric Power Cooperative, Inc.
2/16/2001ACC Energy Workshop – Summer Preparedness 2001 and SS-1 SRP Summer Preparedness 2001 and 2002 Presented to the Arizona Corporation.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Arizona Corporation Commission Natural Gas Workshop September 8, 2005 Presented by David Hutchens, General Manager, Fuels and Wholesale Power Joe Salkowski,
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
Montana Ambassadors Helena, Montana February 25, 2011.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Arizona Corporation Commission Energy Workshop February 16, 2001.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
PJM©2015 ATTACHMENT TO TESTIMONY OF ANDREW OTT OHIO ENERGY MANDATES STUDY COMMITTEE MARCH 18,
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
12/15/ SS-1 Arizona Corporation Commission Special Open Meeting Gary Harper Manager, System Operations July 23, 2004 Phoenix, Arizona.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
Generation Adequacy Task Force Meeting April 10, 2014.
Current status & future plans for power system development U Moe Thet, Deputy Chief Engineer Power System Department Myanma Electric Power Enterprise.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.
(c) IRD 2002 Power System Restoration (Black Start) Black Start Panel Session IEEE PES Summer Meeting Chicago, Illinois July 23, 2002 M. M. Adibi IRD Corp.,
Navajo Transmission System
Presentation to the Enron Corp. Finance Committee
Deliverability Maps for 2017 Peaking Capacity RFP
Pacific Power Seismic Preparedness Update
BPA Overview BPA is part of the U.S. DOE, but it is self-funded and covers all of its costs by selling products and services. Congress created BPA in 1937.
California ISO’s CIM Based Model Management
Forecasting and Operations CAISO Case
Nogales DC Tie Capacity
Presentation transcript:

ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning Leland Snook General Manager Wholesale Energy Supply

2 Service Territories San Juan Navajo Palo Verde South Vail Greenlee Cholla Mohave Mead Four Corners Springerville McKinley Tortolita Westwing Coronado UES TEP Tucson Liberty Pinnacle Peak

3 AZ Power Plant Additions

4

Generation Resources TEP Generation Resources (MW) Steam Generation - Coal69% 1,525 Steam Generation - Gas12% 267 Combined Cycle - Gas9% 187 Combustion Turbine - Gas10% 217 Total Generation Resources (MW) 2,196 Market Based Resources (MW) TriState Generation and Transmission – Firm PPA 100 Firm Short-Term Purchases 250 Spot Market Resources 250 Total Market Resources (MW) 600 Total Generation & Market Based Resources (MW) 2,796

Peak Demand Loads and Resources

Generation Preparations

8 UNSE Loads & Resources UNSE under full-requirements contract through 5/31/2008. Load and resource summary provided in APS presentation. UNSE has been and continues to procure generation resources through resource acquisition and quarterly request for proposals To date 100 MW of capacity under firm PPA contracts for Summer MW of capacity under construction at Black Mountain Generation Station located outside Kingman 67 MW of capacity at Valencia Generating Station in Nogales

9 Tortolita South Vail Greenlee Westwing TEP Service Area 500 kV 345 kV North Loop Irvington Voltage With Max Local Gen. Limit of 1,984 MW TEP Import Paths Local Gen. 547MW DMP Winchester

10 Operations preparation Regional black start drills between control areas currently taking place Verification of TEP’s Emergency Operations Center (EOC) readiness scheduled in April 2007 Weekly check of EOC systems occurs Daily conference call between reliability coordinator and control area operators to review system conditions During summer peak AZ entities hold daily reliability call New radio system deployed since last summer

11 Distribution Preparations Review and adjust Power Factor as needed Installation of mobile transformer to support the Vail area of TEP service territory until new 138kV substation is developed

12 UNS Electric Transmission Mohave – Transmission from Pinnacle West Delivery points to UNS loads is provided by Western Area Power Santa Cruz load is served at peak with a combination of firm Western transmission and non-firm transmission supported by local generation at Valencia

13 UNS Electric System – Santa Cruz Installed remote control switch at Canez substation to allow for operational flexibility Pre- storm season patrols completed with no major items identified for repair

14 UNS Electric System – Mohave Installed 2 new Distribution Substations 12 miles of new 69kV line installed 14 miles of new 230kV line (initially operated at 69kV) Pre- storm season patrols completed with no major items identified for repair

15 Conclusion Sufficient Resources are available to meet TEP load Sufficient Transmission is available to meet TEP load Sufficient Transmission is available to meet UES Mohave load Transmission in conjunction with local generation is sufficient to meet Santa Cruz load