DN Interruption Reform Distribution Workstream 23 rd July 2009.

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Exercise Prelude Paul Youngman. 2 Exercise Prelude Exercise Prelude took place on the 5 th and 6 th of November with the final report being published.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
NEC Network Emergency Exercise - Exercise Prelude.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Distribution Network Interruption - Initialisation 28 September 2010.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform (UNC Mod 90) Liz Spierling Commercial Manager, Transportation.
Exercise Neptune Findings Gas Customer Forum 29 th January 2007 Jacky Carroll Network Manager Emergency Planning Gas National Control Centre.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Background Current balance of LDZ System and Customer charges
Transmission Workstream 7th Dec 2006 Chris Logue
Modification Proposal 0283 Update
Review Group 291- Ofgem Update
Transmission Workgroup 4th October 2012
LDZ System Charges – Structure Methodology 26 July 2010
Incentives 26 September 2018.
Simon Trivella – 22nd May 2008 Distribution Workstream
Connected System Exit Points Administration Options
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Connected System Exit Points Administration Options
Review Group 291- Ofgem Update
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
DN Interruption Reform
DN Interruption Phase II
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

DN Interruption Reform Distribution Workstream 23 rd July 2009

2 Agenda  Background to DN Interruption Reform  Outcome of 2008 DN Interruption tender  DN Analysis  Proposed Approach  Next Steps

3 Background to DN Interruption Reform  Implemented 1 April 2008  DNs tender for interruption rights three years ahead of use  DNs incentivised to procure appropriate level of interruption and investment in networks  Fewer interruptibles from 2011 onwards

4 Outcome of 2008 DN Interruption Tender DN Post 2011 Interruptible Load % peak loadNo. of sites SGN<17 NGN1.055 NGG0.27 WWU0.44

5 All DNs Prelude

6 All DNs Post Mod 90

7 Approach Identify Firm Load Shedding Capability post Mod 90  Establish a target based on the performance achieved in Exercise Prelude  NEC wants speed and confidence on DN deliverability Load shed in 4 hours LDZ specific Resources available for Site visits where required  Shipper obligations remain to maintain site contact details

8 Example – NGG Analysis Prelude

9 Example – NGG Analysis post Interruption Reform

10 Next Steps DN Best Practice  Preparation Data Validation [NG top 200 per LDZ] Site Visits > 2 million therms [NG 212 across 5 LDZs] NEC involved Industry Engagement  GATG  Emergency Exercises (2009 and 2010) Highlight Target Customers Recycling Contact Information Escalating Contact Information Increased Number of Site Visits  Revised DN Safety Case submissions August 2009

11 Summary Current approach aims to improve the quality of contact information at the larger FSPs.  Contact Information will be issued to Users  Users will be expected to update the Supply Point Register where necessary Quality of information to be assessed via [NEC] exercise

12 Possible Future Changes Concern that performance may remain low:  Option for consideration of incentives for the accuracy of User provided information  It is not our intention to propose such a regime at this time Mod proposal 0728 – decision letter. Effectiveness of incentives on interruption contacts “In contrast to firm load shedding, incentives exist in the UNC for shippers to ensure this data is correct, so that interruption occurs when required. UNC penalties apply for failure to interrupt and these are usually replicated in relevant supply contracts with customers. Such incentives appear to have worked successfully to date…for sites with firm supply contracts, statistics have shown widely varying levels of shipper/supplier performance. …collecting and maintaining ECI comes at a cost, and [Ofgem] takes the view that those shipper/suppliers with poor levels of performance should not obtain an advantage over others. Ofgem therefore considers that further thought should be given to introducing greater incentives in this area”

13 Potential Scope of User Provided Contacts Scheme  Scheme aimed at testing quality of contacts provided by Users  Top 200 sites (Bands A and B) per LDZ will be validated by Transporter and are hence an inaccurate measure of User performance  Next largest 50 sites (Band C) per LDZ (650 across 13 LDZs) could be measured for the purposes of an incentive scheme LDZ 1 LDZ 2 732,000kWh Band A - Mandatory DM – Transporter Site Visits / Phone Call Band B - Remainder of top 200 per LDZ – Transporter phonecalls Band C th largest per LDZ – Subject to incentive scheme Largest LFSPs Smallest LFSPs A A B B CC

14 Potential Financial Scheme Operation: Principles Transporters would be revenue neutral within the scheme  However, they would recover costs associated with administration of the scheme Value of incentive charges would be inversely proportional to performance  High overall performance would result in comparatively low incentive charges  Low overall performance would result in comparatively high incentive charges Scheme would require  ‘Income’ – notionally paid into scheme by Users (based on market share of Band C)  ‘Expenditure’ – scheme notionally repays funds to Users (based on individual performance within Band C)  Only the net value is actually invoiced Income and expenditure levels would be determined by registered SOQ values to reflect relative importance of larger loads in Firm Load Shedding Process Performance assessed via NEC Annual Exercise