Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Jonathan E. Aberts Spring 2009
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Hershey Academic Support Center Structural Option Shawn Jones Building Analysis of the Hershey Academic Support Center Hershey, PA Shawn Jones Structural.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural Engineering Senior Thesis, Spring 2006

Building Introduction Design Background 68,000 square feet of open office space Four Aboveground Floors Pre-framed for a bank, first floor Commercial/Light Industrial District of Manassas, VA Standard Suburban Office Building JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Design Background JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Notable Features, M Group Architects 21,000 square feet of parking area achieved through excavating into sloping site JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Notable Features, M Group Architects Structure over parking area slopes with natural terrain JOSEPH HENRY Structural Hanagan, Advisor

Building Introduction Notable Features, M Group Architects “SlenderCast” precast concrete wall system by Smith-Midland strives to: JOSEPH HENRY Structural Hanagan, Advisor Reduce thermal transmission by up to 25% Protect façade from superstructure movement

Building Introduction Existing Structural System, Morabito Consultants Goals JOSEPH HENRY Structural Hanagan, Advisor To reduce floor section thickness and structure weight To lengthen spans for more open office space To utilize as few laborers as possible

Concrete Structural Design Existing Structural System, Morabito Consultants JOSEPH HENRY Structural Hanagan, Advisor Roof Structure: 3” deck on W12x16 Beams, W18x40 Girders Office Floors 2-4: 3.5” Slab on 3” composite deck, W10x15 Beams, W21x44 Girders Parking Deck/First Floor: 4” Slab on 2” composite deck, W10x15 Beams, W24x76 Girders

Concrete Structural Design Existing Structural System, Morabito Consultants JOSEPH HENRY Structural Hanagan, Advisor Roof Structure: 3” deck on W12x16 Beams, W18x40 Girders Office Floors 2-4: 3.5” Slab on 3” composite deck, W10x15 Beams, W21x44 Girders Parking Deck/First Floor: 4” Slab on 2” composite deck, W10x15 Beams, W24x76 Girders 250 psf Fire Engine Load

Building Introduction Existing Structural System, Morabito Consultants Undulating Parking Structure JOSEPH HENRY Structural Hanagan, Advisor Attached to first floor diaphragm via coped beams and W6x25 hangers

Building Introduction Existing Structural System, Morabito Consultants Lateral System JOSEPH HENRY Structural Hanagan, Advisor Seismic Load Controls with 170k base shear Moment Frames on building perimeter anchored to shear walls in basement

Thesis Intent University of Leeds JOSEPH HENRY Structural Hanagan, Advisor

Design Problem Manassas, Virginia JOSEPH HENRY Structural Hanagan, Advisor

Design Problem Manassas, Virginia JOSEPH HENRY Structural Hanagan, Advisor

Design Problem Manassas, Virginia JOSEPH HENRY Structural Hanagan, Advisor

Design Problem Manassas, Virginia JOSEPH HENRY Structural Hanagan, Advisor

Thesis Outline Concrete Structural Design Design Includes: JOSEPH HENRY Structural Hanagan, Advisor Floor Slab Lateral System Columns Footings Connection to Parking Structure

Thesis Outline Concrete Structural Design Design Includes: JOSEPH HENRY Structural Hanagan, Advisor Floor Slab Lateral System Columns Footings Connection to Parking Structure Structural Efficiency Architectural Impact Cost/Schedule Impact Possibility of Green Design Evaluated Through:

Concrete Structural Design Floor System Two Way Slab Types JOSEPH HENRY Structural Hanagan, Advisor Flat Plate Flat Slab with Edge Beams Flat Slab with Drops Flat Slab with Drops and Edge Beams Flat Slab with Beams between all columns

Concrete Structural Design Floor System Two Way Slab Types JOSEPH HENRY Structural Hanagan, Advisor Flat Plate Flat Slab with Edge Beams Flat Slab with Drops Flat Slab with Drops and Edge Beams Flat Slab with Beams between all columns Evaluated Using Direct Design Method ADOSS

Concrete Structural Design Floor System Two Way Slab Types JOSEPH HENRY Structural Hanagan, Advisor Flat Plate Flat Slab with Edge Beams Flat Slab with Drops Flat Slab with Drops and Edge Beams Flat Slab with Beams between all columns Evaluated Using Direct Design Method ADOSS Using Four Column Layouts

Concrete Structural Design Floor System Column Grid, Existing Layout JOSEPH HENRY Structural Hanagan, Advisor Maximum Bay Size = 20’-0”x30’-0”

Concrete Structural Design Floor System Column Grid, Alternative #1 JOSEPH HENRY Structural Hanagan, Advisor Maximum Bay Size = 30’-0”x30’-0”

Concrete Structural Design Floor System Column Grid, Alternative #2 JOSEPH HENRY Structural Hanagan, Advisor Maximum Bay Size = 20’-0”x21’-0”

Concrete Structural Design Floor System Column Grid, Alternative #3 JOSEPH HENRY Structural Hanagan, Advisor Maximum Bay Size = 25’-0”x21’-0”

Concrete Structural Design Floor System Problems: JOSEPH HENRY Structural Hanagan, Advisor Solutions:

Concrete Structural Design Floor System Problems: JOSEPH HENRY Structural Hanagan, Advisor FlexureThicker Slab, Beams between all columns Solutions:

Concrete Structural Design Floor System Problems: JOSEPH HENRY Structural Hanagan, Advisor Flexure Deflection Thicker Slab, Beams between all columns Edge Beam Solutions:

Concrete Structural Design Floor System Problems: JOSEPH HENRY Structural Hanagan, Advisor Flexure Deflection Architecture Thicker Slab, Beams between all columns Edge Beam Larger Spans Solutions:

Concrete Structural Design Floor System Problems: JOSEPH HENRY Structural Hanagan, Advisor Flexure Deflection Architecture Shear Thicker Slab, Beams between all columns Edge Beam Larger Spans Drops, Larger Columns Solutions:

Concrete Structural Design Floor System JOSEPH HENRY Structural Hanagan, Advisor Column Grid, Alternative #1 Maximum Bay Size = 30’-0”x30’-0”

Concrete Structural Design Floor System JOSEPH HENRY Structural Hanagan, Advisor Roof Structure: 8” Slab with 3.5” drops Office Floors 2-4: 10” Slab with 3.5” drops, 4.5” drops at exterior columns Parking Deck/First Floor: 11” Slab with 3.5” drops, 7” drops under parking live load

Concrete Structural Design Floor System JOSEPH HENRY Structural Hanagan, Advisor

Concrete Structural Design Lateral System Location JOSEPH HENRY Structural Hanagan, Advisor Limited wind pressures, seismic will control 170k seismic base shear increases to 354k under concrete system Drift Structural Strength Considerations

Concrete Structural Design Lateral System Drift Analysis from ETABS Model JOSEPH HENRY Structural Hanagan, Advisor Rigid Diaphragm with Columns rigidly attached Lateral Loads applied to only top 4 diaphragms Drift measured from Basement Floor

Concrete Structural Design Lateral System Drift Analysis from ETABS Model JOSEPH HENRY Structural Hanagan, Advisor Roof: 0.876” Floor 4: 0.773” Floor 3: 0.607” Floor 2: 0.394” Floor 1: 0.186” Acceptable Drift: H/400 = 1.57”

Concrete Structural Design Lateral System Structural Analysis from ADOSS Model JOSEPH HENRY Structural Hanagan, Advisor Horizontal Loads applied to Frame Flexure satisfactory Larger unbalanced moments at interior columns at Floors 2 and 3 a problem Larger columns necessary

Concrete Structural Design Columns and Footings Using Moments and Loads from Structural Models JOSEPH HENRY Structural Hanagan, Advisor Column sizes dictated by shear in floor system Per CRSI, minimum reinforcement in columns generally satisfactory Footing sizes drastically increase by 3-4x in area, by almost 2x in thickness

Concrete Structural Design Connection to Parking Structure Beam Connection to Undulating Parking Structure JOSEPH HENRY Structural Hanagan, Advisor Torsion Elevation

Concrete Structural Design Connection to Parking Structure JOSEPH HENRY Structural Hanagan, Advisor

Concrete Structural Design Additional Considerations Beam Connection to Undulating Parking Structure JOSEPH HENRY Structural Hanagan, Advisor Steel DesignConcrete Design

Concrete Structural Design Summary JOSEPH HENRY Structural Hanagan, Advisor Drop panel system used throughout to combat shear Concrete Moment Frames sufficient for drift and lateral load resistance Column sizes dictated by shear and not axial loads Footing sizes drastically increase Connection to undulating parking structure achieved through beam

Concrete Structural Design Methods of Evaluation (Breadth Analyses) JOSEPH HENRY Structural Hanagan, Advisor Architectural Impact: Number of Parking Spaces, Size of Obstructing Columns, Façade Cost/Schedule Impact: Overall Cost, Erection Time, and Local Adjustments Possibility of Green Design: Structural, Cost, and Aesthetic Implications of a Green Roof

Architectural Design (Breadth 1) Overview and Problem Statement JOSEPH HENRY Structural Hanagan, Advisor Parking Area: New Column Layout overlaps with interior driveway by 2’-6” Office Layouts: Interior Corridor area needs to be moved to accommodate parking area and new column layouts Façade Layouts: 24” wide columns block windows

Architectural Design (Breadth 1) Overview and Problem Statement JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Overview and Problem Statement JOSEPH HENRY Structural Hanagan, Advisor Parking Area: New Column Layout overlaps with interior driveway by 2’-6” Office Layouts: Interior Corridor area needs to be moved to accommodate parking area and new column layouts Façade Layouts: 24” wide columns block windows Floorplan evaluated by the Building Owner and Managers Association Industry Standard Façade evaluated by simplifying Precast Panel use

Architectural Design (Breadth 1) Existing Design JOSEPH HENRY Structural Hanagan, Advisor Total Rentable Area: 36,730 square feet R/U Ratio: 16.74% Underground Parking Spaces: 44

Architectural Design (Breadth 1) Alternative #1 JOSEPH HENRY Structural Hanagan, Advisor Total Rentable Area: 37,740 square feet R/U Ratio: 14.77% Underground Parking Spaces: 48

Architectural Design (Breadth 1) Alternative #2 JOSEPH HENRY Structural Hanagan, Advisor Total Rentable Area: 37,027 square feet R/U Ratio: 16.09% Underground Parking Spaces: 46

Architectural Design (Breadth 1) Alternative #3 JOSEPH HENRY Structural Hanagan, Advisor Total Rentable Area: 37,116 square feet R/U Ratio: 15.90% Underground Parking Spaces: 47

Architectural Design (Breadth 1) Floorplan Study Summary JOSEPH HENRY Structural Hanagan, Advisor Average Annual Rental Value per usable square feet in Prince William County is $25 Parking Spaces, if rented, could cost $50/month Increased Annual Revenue to the Owner: $7,425 to $21,150

Architectural Design (Breadth 1) Façade Study JOSEPH HENRY Structural Hanagan, Advisor Precast Panels can be shifted and moved to suit the structural layout Horizontally, panels adhere to 3’-9” and 5’-0” modules Vertically, the design details draw from base-shaft-capital office building icon

Architectural Design (Breadth 1) Façade Study, Horizontal Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Horizontal Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Horizontal Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Horizontal and Vertical Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Horizontal and Vertical Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Horizontal and Vertical Play JOSEPH HENRY Structural Hanagan, Advisor

Architectural Design (Breadth 1) Façade Study, Most Economical Redesign JOSEPH HENRY Structural Hanagan, Advisor Windows completely free of column obstructions Maximum number of panels re-used Panels kept under 30’-0” wide

Architectural Design (Breadth 1) Façade Study, Most Economical Redesign JOSEPH HENRY Structural Hanagan, Advisor Windows completely free of column obstructions Maximum number of panels re-used Panels kept under 30’-0” wide

Cost/Schedule Analysis (Breadth 2) Cost Estimates from R.S. Means 2006 JOSEPH HENRY Structural Hanagan, Advisor Composite Steel Costs $1,147,371 over 13.5 weeks Concrete Costs $1,351,453 over 16 weeks $200,000+ cost difference in favor of Steel

Cost/Schedule Analysis (Breadth 2) Concrete vs. Steel, Local Influences JOSEPH HENRY Structural Hanagan, Advisor Local Cost Adjustments

Cost/Schedule Analysis (Breadth 2) Concrete vs. Steel, Local Influences JOSEPH HENRY Structural Hanagan, Advisor Lead Times: After Design Completion, Procurement, Submittals, and Approvals, it takes 12 weeks to produce structural steel and only 3 weeks to produce rebar Supply and Demand: Washington DC area on Portland Cement Association’s “tight cement supply” list for 2005 and 2006 Weather: Per ACI concrete must be kept above freezing, which may add cost and duration

Green Roof Addition (Breadth 3) Overview of Green Roof Types JOSEPH HENRY Structural Hanagan, Advisor Information from Roofscapes, Inc.

Green Roof Addition (Breadth 3) Why a Green Roof? JOSEPH HENRY Structural Hanagan, Advisor

Green Roof Addition (Breadth 3) Why a Green Roof? JOSEPH HENRY Structural Hanagan, Advisor

Green Roof Addition (Breadth 3) Why a Green Roof? JOSEPH HENRY Structural Hanagan, Advisor

Green Roof Addition (Breadth 3) Why a Green Roof? JOSEPH HENRY Structural Hanagan, Advisor

Green Roof Addition (Breadth 3) Implications of Green Roof JOSEPH HENRY Structural Hanagan, Advisor Increased Costs For enlarged roof system: $17,500 for steel, $30,000 for concrete $10-13 to install and 4-6 man hours per 1000 square feet per year to maintain $90,000 to $117,000 to install (10% of structural system price) $720 to $1,080 to maintain

Green Roof Addition (Breadth 3) Implications of Green Roof JOSEPH HENRY Structural Hanagan, Advisor Increased Costs For enlarged roof system: $17,500 for steel, $30,000 for concrete $10-13 to install and 4-6 man hours per 1000 square feet per year to maintain $90,000 to $117,000 to install (10% of structural system price) $720 to $1,080 to maintain Benefits Per LEED Green Building Rating System, eligible for 1 point (Heat Island Effect: Roof, Credit 7.2) Reduced noise transmission through roof structure Increased R-values in roof system

Final Conclusions Original Composite Steel Design Review Pro JOSEPH HENRY Structural Hanagan, Advisor Light Small Columns Cheaper Faster Average 12” deeper section depth than concrete Complicated connections at parking structure Less drift resistance Time consuming fire protection needed Con

Final Conclusions Reinforced Concrete Design Review Pro JOSEPH HENRY Structural Hanagan, Advisor Smaller floor section depth Simpler connections to parking structure More drift resistant No fireproofing required More effectively resists water damage from green roof Heavy system with larger footings Large obstructing columns More expensive by $200,000 Longer erection time by 2.5 weeks Con

Final Conclusions Recommendations Hybrid Structure: Concrete up to First Floor Composite Steel Above JOSEPH HENRY Structural Hanagan, Advisor Fireproofing simplified between office area and underground parking Better appearance, smaller section depth in parking area Simplified connections to parking structure Good cost and schedule compromise Concrete first floor helps resist lateral loads

Thank You Questions and Comments? JOSEPH HENRY Structural Hanagan, Advisor