Dam Safety in the 21 st Century PFMA as a Dam Safety Tool – Joe Ehasz FERC Regulator Perspective – Doug Johnson USACE Perspective – Doug Boyer Owner Perspective.

Slides:



Advertisements
Similar presentations
Past Dam Failures with Modes of Failure
Advertisements

The Future of Wixom Lake
2014 NWHA CONFERENCE Doug Johnson, P.E. Portland Regional Engineer.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
USSD Committee on Monitoring of Dams and Their Foundations
The Failure of Teton Dam
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Earth and Rockfill Dams
DAMS.
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
B Y : J EFF C OFFIN, P.E. S R. C IVIL E NGINEER /H YDROLOGIST K LEINSCHMIDT A SSOCIATES.
2006 Project Alternatives Pit and Dike Risk Evaluation MEADOWBANK GOLD PROJECT.
Nineteen Years later…. Lessons learnt from Kantale Breach D W R Weerakoon Former Director General of Irrigation.
Risk Management and Dam Safety. Reclamation Played a Pivotal Role in Developing Major River Basins in the Western United States.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Big Bay Lake Dam Failure Materials Provided by Robert J. Millette, P.E. Mississippi Department of Environmental Quality April 19, 2004 Presented By Tom.
1 Scoggins Dam Overview of Seismic Risk July 18, 2012.
2011 MADCS Conference.  FMA is a tool to help identify:  Priorities for rehabilitation  Improvements for operation, maintenance and data collection.
An Examination of Dam Failures vs. the Age of Dams Patrick Regan FERC.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
1 Pertemuan 10 Bangunan Air Matakuliah: S0182/Studi Kasus Dalam Teknik Sipil Tahun: Juli 2005 Versi: 01/01.
History of Dam Building in the Klamath Basin Originating in Southern Oregon and extending through Northern California, the Klamath River Basin represents.
Making Better Decisions in an Uncertain World Reservoir Operations Modeling.
Hydroelectric Power
Dam Failure Dams are generally an expensive structure that directly affect the economy of the area through power generation, flood control and water supply.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Dam Hazard Consequences Assessment
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Permeability and Seepage
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Operations & Maintenance Considerations Dave Lawson Electrical Maintenance and Operations Supervisor.
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
Middle Fork Project Project Description April 25, 2006.
HYDRO POWER PLANT
Hydrological Energy By:Saeed Merghani and Dalal Dumaidi.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Hurricanes. Katrina approaching New Orleans August 2005.
Hydro Power Plants A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to flow through tunnels in the dam,
Dam Removal as a Solution to Increase Water Quality Matthew Nechvatal, Tim Granata Department of Civil and Environmental Engineering and Geodetic Science.
WRAC Acme Basin B Discharge Project February 2, 2006.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
Water Resources Planning and Management
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Senate Resources Committee & House Energy Committee Prepared by Alaska Energy Authority 1 /25/2011.
01/2012 The Shikwamkwa Replacement Dam Five Years Later C. Richard Donnelly, Hatch ● Bryan Tatone, University of Toronto ● Warren Hoyle, Noel Boucher,
Theme C1: Flood management in arid regions ICOLD Workshop - 20 May 2016 Theme C1:Theme C1: Flood management in arid regionsFlood management in arid.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Warren A. Witt Director of Hydro Operations Ameren Missouri
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Overview of Spokane- Coeur d’Alene Hydrology
Mid-West Electric Consumers Association
Dams.
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Tennessee Safe Dams Program
Diamon Lester and Lamar Bradford
4th Annual Construction Law Summit
Taum Sauk Dam Failure Missouri, 2005
Dam Construction & History
Stability of Slopes By: Alka Shah Civil Engineering Department
Lake 16 Dam Repair Presentation
Is this Seepage A Problem?
Estler Lake Dam Rehabilitation
Presentation transcript:

Dam Safety in the 21 st Century PFMA as a Dam Safety Tool – Joe Ehasz FERC Regulator Perspective – Doug Johnson USACE Perspective – Doug Boyer Owner Perspective - Bill Christman The Reality of Risk Portland, OR February 19, NW Hydroelectric Conference

Dam Safety in the 21 st Century The PFMA Process as a Dam Safety Tool The Reality of Risk Portland, OR February 19, NW Hydroelectric Conference Joe Ehasz URS Energy & Construction, Inc

The Reality of Risk Potential Failure Mode Analysis (PFMA) The process utilized to determine the Potential Failure Modes pertinent to the dam under investigation Essentially asks the Question: How could this dam fail What happens if it does Are the identified potential failure modes recognized What actions can be taken to reduce the dam failure likelihood NW Hydroelectric Conference

The Reality of Risk Presentation of Three Actual Dam Failures that : 1.Were scheduled to have PFMA performed 2.Failed prior to PFMA 3.Failure could have been avoided if PFMA process had been done NW Hydroelectric Conference

The Reality of Risk Three Actual Dam Failures 1.Swift 2 Forebay Dam – Washington - Failed April 21, Silver Lake – Michigan - Failed May 14, Taum Sauk Upper Reservoir Dam – Missouri - Failed Dec. 14, NW Hydroelectric Conference

April 21, 2002 The Reality of Risk NW Hydroelectric Conference Swift No. 2 Hydroelectric Project Forebay Dam Failure

The Reality of Risk Constructed – 1958 Constructed – 1958 Length of water supply canal – 3 miles Length of water supply canal – 3 miles Impoundment ac-ft Impoundment ac-ft Embankment height in forebay – 93 ft Embankment height in forebay – 93 ft Max water depth – 53 ft Max water depth – 53 ft NW Hydroelectric Conference Swift No.2 Hydro Project

The Reality of Risk Operating History Considerable leakage upon first filling Cracks and sinkholes in canal bottom Cracks and sinkholes in canal bottom Mud boils below canal levels Mud boils below canal levels Portions of dike removed and filter placed in canal bottom Portions of dike removed and filter placed in canal bottom No further distress until 2002 when failure occurred No further distress until 2002 when failure occurred NW Hydroelectric Conference

The Reality of Risk Sinkholes developed in forebay at 3:00 AM Sinkholes developed in forebay at 3:00 AM Blowout followed at toe of embankment Blowout followed at toe of embankment Orifice expanded upstream Orifice expanded upstream Embankment breached at about 6:30 AM Embankment breached at about 6:30 AM Flooding destroyed powerhouse Flooding destroyed powerhouse Discharge contained in the lower reservoir Discharge contained in the lower reservoir NW Hydroelectric Conference

April 21, 2002 Failure The Reality of Risk NW Hydroelectric Conference

The Reality of Risk Sinkholes developed in forebay at 3:00 AM Sinkholes developed in forebay at 3:00 AM Blowout followed at toe of embankment Blowout followed at toe of embankment Orifice expanded upstream Orifice expanded upstream Embankment breached at about 6:30 AM Embankment breached at about 6:30 AM Flooding destroyed powerhouse Flooding destroyed powerhouse Discharge contained in lower reservoir Discharge contained in lower reservoir NW Hydroelectric Conference

The Reality of Risk Potential Things That Could Have Been Done to Recognize the Problem? Periodic (annual) draining and inspection of the forebay and canal Install piezometers beneath the basalt to measure pressures Develop a complete water balance to establish the total loss of canal water More study and critical review of construction conditions and photos Perform a PFMA to develop the possible failure modes with consideration of the construction and series of repairs that were required upon first filling and later NW Hydroelectric Conference

The Reality of Risk NW Hydroelectric Conference Silver Lake Failure – May 14, 2003 High Rainfall Period Fuse Plug Failure Fuse Plug Foundation Eroded Entire Lake Empted Flooding Downstream Facilities

The Reality of Risk May 13, NW Hydroelectric Conference Silver Lake Reservoir

The Reality of Risk May 14, NW Hydroelectric Conference

The Reality of Risk May 14, NW Hydroelectric Conference

The Reality of Risk May 14, NW Hydroelectric Conference

450 MW Pumped Storage Project Located in Reynolds County, Missouri One of the First PSP, Started in 1963 Licensed by FPC in August 1965 Owned and Operated by Ameren UE Upper Dam is a Continuous Dike 6,562 Ft. Long Upper Reservoir Water Level Overtopped the Dam Upper Reservoir Dam Failed on December 14, 2005 The Reality of Risk NW Hydroelectric Conference Taum Sauk Pumped Storage Project

Taum Sauk Upper Reservoir Power Tunnel Powerhouse The Reality of Risk NW Hydroelectric Conference

Dumped and Sluced Rockfill Upstream Reinforced Concrete Lining Parapet Wall Placed atop the Rockfill Dam Underdrainage Concerns Upon First Filling Continued High Levels of Leakage Through Dam Large Settlements and Movements of Dam and Wall Relining in 2004 to Reduce Seepage Revised Water Level Instrumentation in 2004 The Reality of Risk NW Hydroelectric Conference

Taum Sauk – Upper Reservoir Full Do you Really Operate This Full? The Reality of Risk NW Hydroelectric Conference

The Reality of Risk December 14, NW Hydroelectric Conference

The Reality of Risk Potential Failure Mode Analysis (PFMA) Is a Good process because it does ask the tough questions How could this dam fail What happens if it does Are the identified potential failure modes recognized What actions can be taken to reduce the dam failure likelihood NW Hydroelectric Conference Because of that, I believe that it actually can minimize or even eliminate failures

The Reality of Risk NW Hydroelectric Conference Discussion Later!