1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

PoA Challenges & Opportunities
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
CDM Type Micro-hydro Projects: A Case Study National Workshop on Capacity Development for the Clean Development Mechanism (CDM) Eugenio Lopez Conference.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Orientation Workshop on March 25 th – 26 th, 2004.
Beyond offsetting: Ambitious SBL as a national contribution to combat climate change Malin Ahlberg „Designated Focal Point/Designated National Authority“
Development Alternatives 1 CDM Criteria & Roadmap for CDM Project Development For Workshop on January 28 th – 29 th, 2005.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
CDM: Quick Overview Matt Spannagle Technical Manager Millennium Development Goals Carbon Facility Bureau for Development Policy United Nations Development.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Bundling small scale projects Principles of bundling Bundling Documentation Examples and their applications in Carbon Finance projects Bundling (& “de-bundling”)
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Baseline setting and monitoring under JI compared to the CDM approach
Small-Scale Projects Under JI
Presentation transcript:

1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis

2 Project development PROJECT IDEACONSTRUCTIONFINANCINGFEASIBILITY STUDY MAKE PDD OPERATION REGISTERVALIDATEISSUE CERsVERIFY STAKEHOLDER COMMENTS TEST ADDITIONALITY USE OR MAKE METHODOLOGY NEGOTIATE ERPASELECT BUYER PREPARE PIN and TERM SHEET DELIVER CERs CDM / JI DEVELOPMENT PHYSICAL PROJECT DEVELOPMENT COMMERCIAL DEVELOPMENT STAKEHOLDER COMMENTS MONITOR LETTER OF APPROVAL GENERATE CERs SELECT BUYERSELL AND DELIVER

3 Project Design Document (PDD)  The basic document in the CDM process, that describes the assumptions underlying the future CERs  Based on an approved methodology  Major components: –Technical project description –Additionality –Project boundary –Baseline emissions –Estimated project emissions –Leakage –Monitoring procedure –Stakeholder comments –Effects on the environment

4 General principles of the PDD PDD Accuracy Complete- ness Conservative- ness ConsistencyRelevanceTransparency

5  No statement without proof!  Provide proof for all assumptions and statements  Use publicly accessable data sources  Don’t quote sources that are not verifiable or that you don’t want to disclose  State all calculations  Provide clear documentation in spreadsheets Transparency

6  Reduce uncertainty as much as possible  Use accurate quantitative data  When using qualitative information, be clear and precise Accuracy

7  Quote all relevant sources of greenhouse gasses;  When some sources are left out deliberately, clarify and justify Complete- ness

8  In assumptions, estimations, values and procedures: prefer the more conservative values over the more attractive  Refrain from overestimating  Choose the lower value, even if the higher one is the more attractive Conservative- ness

9  Use comparable key indicators in the same way  Use tests and assumptions equally across the potential baseline scenarios  Use the same methods over time and across technologies Consistency

10  Only use information that is relevant for your project  Don’t blur the PDD with nonsense Relevance

11 Project Idea Note (PIN)  A summary of project characteristics used to communicate with potential buyers of carbon credits; –Also used in approval procedures of some countries  Touches upon the basic issues of the project: –Project design, technology used –Project sponsors and developers –Finance –Timing and status –CDM basics: volume CERs, additionality, methodology used –Sustainable development benefits  Model of the World Bank is generally accepted: – -> Operations handbook -> Project document templateswww.carbonfinance.org

12 Other relevant documents  Validation report: confirmation of a Designated Operational Entity (DOE) that the project design complies with CDM requirements;  Letter of Approval (LoA): confirmation of a Designated National Authority (DNA) that –The Party has ratified the Kyoto Protocol. –The approval of voluntary participation in the proposed CDM project activity –In the case of Host Party(ies): statement that the proposed CDM project activity contributes to sustainable development of the host Party(ies).

13 Additionality  “A CDM project activity is additional if anthropogenic emissions of greenhouse gasses are reduced below those that would have occurred in the absence of the registered CDM project activity”  In practice: –Demonstrate that CDM helps to overcome financial barriers or –Demonstrate that CDM helps to overcome technical, practical, insititutional or other barriers.

14 Methodologies  Methodologies are standardised procedures how to measure and calculate emission reductions in a CDM project  Extensive elaborations on –Formulas –Definition of project boundaries –Monitoring requirements –Leakage  Compulsory to use  Project type specific  Approval by the Executive Board needed  Different sets for large scale and small scale projects

15 Baseline and project scenario

16 Project boundaries  The project boundary contains all GHG emissions under the control of the project participants that are significant and reasonably attributable to the CDM project activity.  Emission reduction = Baseline emissions - Project emissions – Leakage Landfill CH 4 CO 2 Flare Power Project boundary CO 2 Baseline Project

17 Leakage  Emission changes outside the project boundary, due to the project, not under control of the project participants  Examples: –Transport –Changed fuel use –Increased energy consumption  Leakage must be addressed in the PDD, and monitored

18 Validation & registration  Validation: check of the PDD by a Designated Operational Entity (DOE), validator –Document review –Site inspection –International stakeholder comments on PDD –Check monitoring and QA/QC procedures  Registration: acceptance by the EB of the project as being a CDM Project Activity –Solliciting Letters of Approval with host and Annex 1 country –Submission of PDD and validation report –Stakeholder comments on validation report –Review possibility

19 Monitoring Operating the project  Measuring project performance and emission reduction  Monitoring project assumptions (e.g. temperature)  Monitoring report

20 Verification & issuance  Verification: check of the monitoring report by a Designated Operational Entity (DOE), verifier –Document review –Site inspection –QA/QC check –Establishment of volume of emission reductions  Issuance: the CDM Executive Board issues CERs to registry accounts of project participants –Submission of monitoring and verification report –Stakeholder comments –Review possibility

21 Small scale  Use of dedicated, simpler methodologies  Simpler additionality testing: barrier analysis only  Definition: –Type I: Renewable energy project activities with a maximum output capacity equivalent to up to 15 MW (or an appropriate equivalent); –Type II: Energy efficiency improvement project activities which reduce energy consumption, on the supply and/or demand side, limited to those with a maximum output of 60 GWh per year (or an appropriate equivalent); –Type III: Other project activities limited to those that result in emission reductions of less than or equal to 60 kt CO2 equivalent annually;  Bundling – debundling. Debundling is not permitted. –By the same project participants; –In the same project category and technology/measure; and –Registered within the previous 2 years; and –Whose project boundary is within 1 km of the project boundary of the proposed small-scaleactivity at the closest point.

22 CDM website of UNFCCC   Project activities section: browse PDDs of registered and non- registered projects  Methodology section: select the methodology for your project  Reference / documentation: seek guidance in completing the procedure

23 Contact details  Adriaan Korthuis  Phone  climatefocus.com 

24 CDM jargon CDM wordRegular English CDM project activityProject DOEValidator or verifier PartyCountry DNACountry’s CDM office Project participantOrganisation (company, country) that can decide on the distribution of CERs from a project Further reading: