MINGZHE HAN (CMP TUTOR) COMM 204 Review Session. Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process.

Slides:



Advertisements
Similar presentations
Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

Operations Scheduling
Waiting Line Management
Chapter 5: Service Processes
Capacity Planning and Queuing Models
E&CE 418: Tutorial-4 Instructor: Prof. Xuemin (Sherman) Shen
PROCESS DESIGN AND ANALYSIS Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Review before Midterm 1. Announcements Bring calculator, pencil, eraser (these cannot be shared) No open cell phones allowed. Last names Akcay-Kelder.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
INDR 343 Problem Session
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Capacity Planning and Queuing Models.
OM&PM/Class 7a1 Operations Management & Performance Modeling 1Operations Strategy 2Process Analysis 3Lean Operations 4Supply Chain Management 5Capacity.
Chapter 22 Simulation with Process Model to accompany Operations Research: Applications and Algorithms 4th edition by Wayne L. Winston Copyright (c) 2004.
Probability Distributions
© The McGraw-Hill Companies, Inc., Technical Note 6 Waiting Line Management.
IV. Little’s Law and Labor Costs
Lecture 11 Queueing Models. 2 Queueing System  Queueing System:  A system in which items (or customers) arrive at a station, wait in a line (or queue),
14-1. Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 14 Capacity Planning and Queuing Models.
Processor 1 Processor 2 Disk 1 Disk 2 tasks Demo 1: Computer System with 2 Processors Sharing 2 Disks in Parallel.
1 Chapter 7 Dynamic Job Shops Advantages/Disadvantages Planning, Control and Scheduling Open Queuing Network Model.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Max-flow/min-cut theorem Theorem: For each network with one source and one sink, the maximum flow from the source to the destination is equal to the minimal.
Buffer or Suffer Principle
How Do I Find a Job to Apply to?
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
OPSM 301: Operations Management
MBA 8452 Systems and Operations Management MBA 8452 Systems and Operations Management Product Design & Process Selection —Service.
Queueing Theory Models Training Presentation By: Seth Randall.
A spinner from a board game randomly indicates a real number between 0 and 50. The spinner is fair in the sense that it indicates a number in a given interval.
Announcement-exam rules
Introduction to Operations Research
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
Queueing Theory What is a queue? Examples of queues: Grocery store checkout Fast food (McDonalds – vs- Wendy’s) Hospital Emergency rooms Machines waiting.
Chapter 16 Capacity Planning and Queuing Models
Process Analysis I Operations -- Prof. Juran.
Process Layout Chapter 7 July 20, 2005.
Components of the Queuing System
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Network Flow Problems Example of Network Flow problems:
1 Ardavan Asef-Vaziri Sep-09Operations Management: Waiting Lines3 Example: The arrival rate to a GAP store is 6 customers per hour and has Poisson distribution.
Trauma center moves to diversion status once all servers are busy (incoming patients are directed to other locations) Figure 7.1.: Process flow diagram.
 Recall your experience when you take an elevator.  Think about usually how long it takes for the elevator to arrive.  Most likely, the experience.
EVOLUTION OF INDUSTRIAL ENGINEERING Prof. Dr. Orhan TORKUL Res. Asst. M. Raşit CESUR Res. Asst. Furkan YENER.
Tell me a little about yourself. Are you from the area originally? Brothers? Sisters? Married? Any kids? So what have you done for work since high school?
Making the Most of a Job Fair. Here are some tips and strategies to best prepare for a job fair.
Managerial Decision Making Chapter 13 Queuing Models.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 18 Management of Waiting Lines.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
GSCM 520 RANK Let's Do This /gscm520rank.com
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Queuing Theory Jackson Networks
Process Analysis.
Effect of Buffer Capacity
Solutions Queueing Theory 1
Operations Management
Chapter 5 Process Analysis.
Solutions Hwk Que3 1 The port of Miami has 3 docking berths for loading and unloading ships but is considering adding a 4th berth.
Variability 8/24/04 Paul A. Jensen
Queuing Models and Capacity Planning
GCSE Revision In response to a large number of Y11 students asking for advice on how to revise….. Introduction & revision planning Revision techniques.
Solutions Hwk Que3 1 The port of Miami has 3 docking berths for loading and unloading ships but is considering adding a 4th berth.
EMGT 501 Fall 2005 Final Exam Due Day: Dec 12 (Noon)
Effect of Buffer Capacity
Chapter 5 Process Analysis.
Presentation transcript:

MINGZHE HAN (CMP TUTOR) COMM 204 Review Session

Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process Matrix) (Variability in Processes) (Project Management) (Cases and Readings)

Basic Information 1). Which one of the following options is wrong? (A). Strategic fit means that where a company locates itself on the frontier depends on a company’s strategy of development. (B). Tactical issues is ensuring that the firm is on the operation frontier (C). Moving the operations Frontier means there is a operations innovation. (D). None of the above.

Process Analysis 2). What does it mean when no resources are at capacity? 3). What does it mean by blocking and starving a process?

Process Analysis 4). Suppose we are producing Pokémon Balls, this production process consists of four tasks. Tasks A and B are in parallel, that is, we can perform task A and B simultaneously. After both A and B are completed, the flow unit will be processed by task C and task D sequentially. The following table shows resources and unit loads for each activity. Each worker is only able to perform one task.

Process Analysis a). Draw the process map for the above process. b). What’s the capacity of this process? What is the bottleneck? If this production system produced on average 3 units per hour last year, what was the utilization of the resources for task D? c). One of your friends says that we can increase the capacity of this process by 50% if we cut the unit load of task C by half. Do you agree? Why?

Since Everyone Wants a Pokémon, Why Not Having a Club?

Process Analysis UBC Pokémon club is providing students with Pokémon training services. Suppose the club opens at 10:00 and a total of 1500 students need to be registered before 3pm. Some students who dream to become Pokémon master arrive early at 7:00 and wait in a queue for registration. Because of the capacity of indoor room, a maximum of 300 students can be registered in each hour after 10:00. What’s the flow unit? Please complete the unfilled cells in the following tabular and then plot the inventory diagram.

Process Analysis

c. Let’s assume that students are served at a first-come-first-serve base, at which time spot will you choose to arrive in order to minimize your waiting time? Suppose you must arrive before 12:00. (a)8am; (B) 9am; (C) 10am; (D) 11am; (E) 12 pm d. Is it possible for all 1500 students to be served before 3pm?

Multiple Types and the Product Process Matrix Fill in the blank (Job shop vs. Flow shop)

Short Break (5 mins) Please go to the indicated address and fill up an online feedback form during the break, you will have the chance to win a gift card. Your feedback is important to us ! Please…(>_<)

Variability in Processes An investment company named Charlotte is trying to address growing customer complaints about service because of the long waiting time. You are asked to study the company’s process and suggest improvements. Suppose that the average service time is 6 minutes per customer, and that 9.9 customers arrive every hour, on average. There is variability in both the arrival rate and in the service time, assume both of them have Poisson distribution. Based on these data, do you think the queue is likely to be very long or relatively short? Give justifications.

UBC Okanagan Campus

Variability in Processes UBC Okanagan has a small student-advising center with only one advisor available. (don’t take it seriously >_<) The advisor was told that students who need advices on their career paths will arrive in a Poisson distribution, and that the advisor will provide an exponential service distribution. Students usually come at a rate of 5 per hour. It will take the advisor an average of 10 minutes to serve one student. Based on these figures, find the following: (a). The average length of queue for students waiting to be served. (b). The average time a student waits. (c). The total time a student is in the advising center. (d). The average utilization of advisor’s time.

Exams > Terminators

Variability in Processes Terminators are produced by one of the three machines. Each machine takes an average of 0.5 day to create a terminator, and this time period is exponentially distributed. The metals are brought to the machines at the rate of 150 tons per month, Poisson distributed. (Each terminator requires 1 ton of metal). (a). What is the utilization level of machines in this production process? (b). The quality standard for these machines is that the waiting time of metal (the time period between a metal being put into the machine and starting being transformed into terminator) is no more than 1 days. What is the average waiting time in the current practice? Is it necessary to build another machine to meet the quality control standard?

Project Management A plant startup is based on the following project management network: a). Draw the network for this project and label the events b). What is the normal project completion time and normal cost? c). Identify the critical path. d). How much will it cost to crash the project completion by 1 day? By 2 days? e). What is the minimum time for project completion?

Cases and Readings 1). Benihana 2). Kristen’s Cookie 3). Shouldice Hospital 4). Deep Change Articles 5). A Taxonomy of Process 6). Variability, Buffers and Inventory

Q & A Section

Thanks for Coming! Please do not forget to complete the online feedback form and get yourself a chance to win a gift card before you leave. Again, your feedback is important to CMP !