1 Operations Management
Feedback for control Transformation Network of activities Inputs Outputs Raw Materials Requests for Service Goods Services Flow Units Resources Labor & Capital

2 Process Flow Diagrams Activities: Material flows: Inventory / buffers:
Mix Activities: Material flows: Inventory / buffers: Information: Work in Process Term 2, 2015 Joseph Milner, RSM 1340

3 Cook Custard Cool Freeze Work in Process Finished Goods Raw Material Pack Freeze Cool Cook Custard

4 Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods

5 BREAK

6 Flow Unit: Batches are 100 liters ice cream packed
3/4 hr/b 1 hr/b Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 24 sec./l 2/3 hr/b 24 s l × 100 l batch × 1min 60s × 1hr 60min. = 2 3 hr/batch

7 Capacity of a single resource:
Cook Custard Process Time: 3/4 hour per batch of 100 l-ice cream Capacity = 4/3 batch/hr

8 Process Time (for each freezer):
Capacity of resources in parallel: 1 b/hr Freeze (Machine 1) Freeze (Machine 2) Process Time (for each freezer): 1 hour/ batch 1 b/hr Capacity = 1 b/hr + 1b/hr = 2 batches/hr

9 Capacity of resources in series:
Cook Custard Cool Freeze Process Time: 3/4 hour/ 100 l Process Time: 3/4 hour/ 100 l Process Time: 1 hour/ 100 l 4/3 b/hr 4/3 b/hr 1 b/hr Capacity = Minimum(4/3, 4/3, 1) = 1 batch/hr

10 p = average service or process time per flow unit
m = average service or process rate (flow units per hour) Observe p = 1/m

11 If service takes 15 minutes or p=1/4 hour, then you can serve m =4 customers per hour.

12 Flow Unit: Batches are 100 liters ice cream packed
3/4 hr/b 1 hr/b 4/3 b/hr 4/3 b/hr 1 b/hr Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 2/3 hr/b 3/2 b/hr 4/3 b/hr 4/3 b/hr 1 b/hr

13 2 b/hr 1 b/hr 4/3 b/h 4/3 b/hr 1 b/hr 3/2 b/hr 4/3 b/hr 4/3 b/hr
Raw Material Cook Custard Pack Cool Freeze Work in Process Finished Goods 3/2 b/hr 4/3 b/hr 4/3 b/hr 1 b/hr 1 b/hr Minimum(2 b/hr, 3/2 b/hr) 3/2 b/hr

14 BREAK

15 3/4 liter-cream 1 liter ice cream 4/3 b/hr 150 l−cream hr 2 b/hr
Cook Custard 4/3 b/hr 150 l−cream hr 2 b/hr Raw Material Prepare Cream 3/4 liter-cream 1 liter ice cream 150 l−cream hr × 1 l−ice cream 3 4 l−cream = 200 l−ice cream hr × 1 batch 100 l−ice cream = 2 batches hr

16 100 l- 95 l-packed ice cream × 100 l−ice cream batch
= 150 l−ice cream hr 3/2 b/hr 100 l-ice cream /hr 95 l-packed/hr 1 b/hr Pack Freeze Work in Process Finished Goods 142.5 l-packed /hr 150 l-ice cream /hr 3/2 b/hr 100 l- ice cream 95 l-packed 100 l-ice cream /hr 95 l-packed/hr 1 b/hr 100 l−ice cream hr 150 l−ice cream hr × 95 l−packed 100 l−ice cream × 95 l−packed 100 l−ice cream = l−packed hr = 95 l−packed hr

17 BREAK

18 m = number of resources available at a workstation
Cook Custard Cool Freeze 2/3 hr/b 3/4 hr/b 1 hr/b 4/3 b/hr 1 b/hr 3/2 b/hr Work in Process Finished Goods Raw Material Pack Cook Custard Cool Freeze Freeze Cool Cook Custard x 2 cookers 2 coolers 2 freezers 1 packer 8/3 b/hr 2 b/hr 3/2 b/hr m = number of resources available at a workstation Capacity of a workstation = # of resources x service rate = m m

19 Fundamental Parameters of a System
rB = Bottleneck and Process Capacity Tmin = Minimum Flow or System Process Time

20 What is the bottleneck rate? (batches per hour)
Bottleneck = Packing rB = 3/2 batch per hour

21 What is the system process time? (hours)

22 3/4 hr/b 1 hr/b 2/3 hr/b Raw Material Cook Custard Pack Cool Freeze
Work in Process Finished Goods 2/3 hr/b

23 What is the system process time? (hours)
TMin = 3/4 + 3/ /3 = hrs = 3:10 hrs

24 Process Utilization and Capacity Utilization
Throughput Rate Process Capacity Process Utilization = (Resource) Throughput Rate Process Capacity Utilization of Resource = Capacity Requested by Demand Available Capacity Implied Utilization =

25 Ice cream making process utilization at TH=1.5 batches/hr
1.5/1.5 = 100% Cooking process utilization = Cooling process utilization = Freezing process utilization = Packing process utilization = 1.5 / (2 x 4/3) = 57% 1.5 / (2 x 1) = 75% 1.5 / (1 x 3/2) = 100% If the demand is 2 batches per hour, Implied Utilization of Freezing = Implied Utilization of Packing = 2 / 2 = 100% 2 / (3/2) = 133%

26 Define a “job” (flow unit) = Batch of 100 liters – ice cream
(3/2) / (8/3) Cooker 3/4 hr 4/3 b/hr 2 8/3 57% Cooler 3/4 hr 4/3 b/hr 2 8/3 57% 3/2 b/hr Freezer 1 hr 1 b/hr 2 75% Packer 2/3 hr 3/2 b/hr 1 3/2 100% *assuming system is processing at full capacity

27 BREAK

28 Flow Unit = 1 batch of 50 croissants
RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill & Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b 5 min/50 Croissants 15min/50 10 min/50 5min/50 20min/50 10min/50

29 ∞ RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill &
Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b

30 ∞ ∞ Define a “job” (flow unit) = 1 batch of 50 croissants 1 1/6 hr
Mix Filling 1 1/6 hr 10 min. 6 b/hr 6 b/hr 100% Mix and Roll Dough 1 5 + 5 min. 1/6 hr 6 b/hr 6 b/hr 100% 6 b/hr 1/4 hr Proof 4 b/hr Fill and Fold 1/12 hr 12 b/hr 1 12 b/hr 50% 1/3 hr 3 b/hr 2 6 b/hr 100% Oven 1/6 hr 6 b/hr 1 6 b/hr 100% Pack *assuming system is processing at full capacity

31 What is the bottleneck rate? (batches per hour)
What is the system process time? (hours) Bottleneck = All but Fill and Fold rB = 6 batches per hour

32 Flow Unit = 1 batch of 50 croissants
RM: Dough Mix Pack WIP: Finished Goods Bake Proof Roll & Cut Fill & Fold Filling 5 min/b 15min/b 10 min/b 5min/b 20min/b 10min/b

33 What is the bottleneck rate? (batches per hour)
What is the system process time? (hours) Bottleneck = All but Fill and Fold rB = 6 batches per hour TMin = 5 min + 15 min + 5 min + 5 min + 20 min +10 min = 60 min = 1 hr

34 5 min. / batch 60% 20 min. / batch 40% Average unit
Fill & Fold 20 min. / batch 40% Average unit p = 5 min. x 60% + 20 min. 40% = 11 min. = hr.

35 ∞ ∞ Define a “job” (flow unit) = 1 batch of 50 croissants 60/40 mix
Mix Filling 1/6 hr 6 b/hr 1 6 b/hr 90.9% 100% Mix and Roll Dough 1/6 hr 6 b/hr 90.9% 100% 6 b/hr 1 6 b/hr 5.45 b/hr 1/4 hr Proof 4 b/hr 5.45 b/hr Fill and Fold hr 5.45b/hr 1 50% 100% 1/3 hr 2 90.9% 3 b/hr 6 b/hr 100% Oven 1/6 hr 6 b/hr 1 6 b/hr 90.9% 100% Pack *assuming system is processing at full capacity