Analysis of Slide Impacts on the North Fork Stillaguamish River Floodplain For Snohomish County May 5, 2014.

Slides:



Advertisements
Similar presentations
Minnesota Silver Jackets Pilot Project Flood Inundation Map and Warning System for Downtown St. Paul Association of State Flood Plain Managers Conference.
Advertisements

Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
F EDERAL I NSURANCE AND M ITIGATION A DMINISTRATION Hazard Mitigation Overview Franki Coons Chief, Grants Implementation Branch Risk Reduction Division.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Changes to the National Flood Insurance Program (NFIP) Ross Richardson Chief, Floodplain Management and Insurance FEMA Region 6 March 27, 2013.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Update Training Meeting
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Overview of Exercise Module 1 – Geologic Setting Module 2 – Flow Regimes Module 3 – Downstream Effects.
Murphy 2012 Bruneau River and Murphy Flows Liz Cresto September 19, 2012.
Federal Emergency Management Agency Donna M. Dannels Director, Policy and Assessment Division Mitigation Directorate.
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
Preliminary Flood Insurance Rate Maps. What is a Flood Insurance Rate Map (FIRM) and how do I use it?* A FIRM is a map created by the NFIP for floodplain.
Emergency Management Cycle. Planning Regulatory Requirement Per 44 CFR (a) (1) - For all disasters declared on or after November 1, 2004, all states,
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
National Flood Insurance and Flood Mitigation Virginia Beam.
The Diversity of Hazus Uses for Hazus Beyond Planning ASFPM 2011 National Conference Louisville, KY Tuesday, May 17, 2011 ASFPM 2011 National Conference.
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
Increased Cost of Compliance The Basics (Last updated July 25, 2006)
Determination of Ellenburger Aquifer Sustainability
National Flood Conference April 22, 2009 Victor Hom Hydrologic Services Division Office of Climate, Water and Weather NOAA’s National Weather Service National.
North Carolina White Oak River Basin Plan December 19, 2000.
Taming the Alabama River Patrick Dobbs & Clay Campbell AMEC Environment & Infrastructure, Inc Alabama Water Resources Conference.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
COUNTY of YUBA HISTORY OF DISASTERS. Birth of the County  1851 – Marysville, Gateway to Gold, founded  1852 – Marysville becomes third largest city.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
ASFPM 2011 FEMA’s National Flood Mitigation Data Collection Tool (NT) Errol Garren May 19, 2011 H-4A 4:
Risk MAP Early Demonstration Projects in Region II 2011 Association of State Floodplain Managers May 17, 2011 Louisville, KY.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Information Exchange Sessions [DATES]
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
W25; How Mitigation Happens After Flood Disasters Tuesday, April 13, :50 AM – 12:20 PM AgendaIntroductionsOverview Pre & Post Event! Pre & Post.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014 HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term.
Discovery Meeting FEMA Region [#]. 2 Introductions.
Minnesota Silver Jackets Pilot Project Flood Inundation Map and Warning System for Downtown St. Paul National Flood Risk Management and Silver Jackets.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Flood Inundation Mapping Program
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
Hydrologic Calibration: October 2010 U PDATE OF E FFECTIVE H YDROLOGY FOR M ARYS C REEK.
[Hydrology and Hydraulic Analysis Utilizing Terrain Data] [Barrett Goodwin]
US Army Corps of Engineers BUILDING STRONG ® Proposed Floodplain Inundation Mapping on the Flathead River Travis Ball Hydraulic Engineer
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
WATERWAYS AND BRIDGES IN TEXAS “Final” Presentation by: Brandon Klenzendorf CE 394K Dr. Maidment.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
GETTING CLIMATE CHANGE INTO TRANSPORT CBAS Mberande River Crossing Case Study Craig Lawrence Advisor - Infrastructure Economics CPIU – MID 17 February.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
All-Hazard Mitigation Plan Update Susquehanna County Kick-Off Meeting April 28, 2016.
Logan River Floodplain Mapping Kedric Curtis, Josh Hogge, Jordan Jarrett, Jared Justensen 4/25/2015 CEE 6190 Photo credit:
1 ODNR - Floodplain Management Program Ensure the wise management of Ohio’s floodplains Floodplain Management in Mahoning County August 16, 2016.
Overview of HAZUS for Flood Loss Estimations
Snohomish County Surface Water Management R2 Resource Consultants
Flood Hazard Area, Flood Insurance and Stormwater Management
North Carolina Lumber River Basin Plan
8/11/2016 Mosquito Creek 2D hydraulic analysis:
FEMA and Geospatial Coordination in West Virginia
Risk MAP & the Little River Basin
City of Kingfisher: Using Historic Flooding to Quantify Damages
Risk Mapping, Assessment, and Planning
Presentation transcript:

Analysis of Slide Impacts on the North Fork Stillaguamish River Floodplain For Snohomish County May 5, 2014

AgendaAgenda Initial River Floodplain Concerns Initial River Analysis Efforts Results and Impacts Determined from this effort Initial Discussions on What Longer Term Solutions Might Look Like Impacted Structures and Hazus Risk Assessment NFIP Assessment HMA Assessment

Initial River Floodplain Concerns

Initial River Analysis Efforts What flows could we see in the short-term (April-May) What flows could we see in the longer-term (next flood season starts in October) What information do we have to determine the baseline flooding condition prior to slide What do we need to do to appropriately model how the river will act through the slide

Hydrology – River Flows Derived Maximum Peak Flows by month for NF Stillaguamish nr Arlington Gage in CFS Short-Term Long-Term (Flood Frequency Analysis)

Existing Flood Insurance Study Comparison From FIS (NF Stillaguamish River Last updated in 1981): From USGS Gage nr Arlington Conclusion: New Analysis shows 100- year flow at 48,700 cfs, which is 56% higher.

Updated River Model A pre-slide hydraulic model was created using the 2013 LiDAR topography LiDAR did not capture under water part but flow at time of LiDAR was fairly low Mimicked the effective model profile for channel characteristics

River Model with Added Slide Impact A post-slide hydraulic model was created by adding the April 6, 2014 LiDAR for the slide area to the existing 2013 LiDAR model Largest unknown was at what elevation the channel bottom was through the slide area USGS has deployed gages in the lake area that this model was calibrated to Channel was dropped by approximately 2.5 to 4.5 feet through the slide below the water line to match what was observed This model was done prior to the pilot channel being improved Upstream bathymetry is not a part of the model and it is not likely to affect the larger flood events

Pre- and Post- Slide Results

Initial Discussions on What Longer Term Solutions Might Look Like

Impacted Structures and Hazus Assessment Detailed building/parcel data from Snohomish County Hazus runs to be revised with building data

Differences in Impacts

NFIP Policies Impact area –10 properties with 11 policies Fringe area –2 properties Claims filed –11 filed as of May 5, 2014 Public inquiries at Disaster Recovery Center –38 as of May 6, 2014

NFIP Strategy Provide floodplain Management and Flood Insurance Technical Assistance 209 Repetitive Loss Properties –Field verification –National Flood Mitigation Data Collection Tool –Provide to State and Snohomish County to assist in analysis and development for planning and grants Insurance Agent Briefing

HMAHMA