1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Vacuum Vessel Production Readiness Review
Progress and Plan for Superconducting RF Cavity RF Group.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Progress of the BEPCII Injection System Kang Wen.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
1.3GHz Input Coupler for ILC
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Manufacturing process, validation and factory test
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design of wide aperture/thin septa of extraction system for J-PARC-50GeV ring 1. The outline of septa system for 50GeVring 2. Designing of thin septa and.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
ELENA installation progress F. Butin / ELENA collaboration.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
LCWS11 WG4 Fully featured accelerating structure engineering design
Page Headline CBETA Splitter.
Ti/SS transitions A.Basti INFN-PISA*
General remarks about the HESR and PANDA vacuum system
Wideband kickers Mechanical design and Fabrication
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
EBTF Design Review Technical Meeting Group
Integration issues at IHEP
Design of Distribution Feedbox at LHC P7
Challenges for FCC-ee MDI mechanical design
Status of the PANDA Solenoid Magnet Production in BINP
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
XFEL Collimation and Beam Switchyard Vacuum Issues
Lithium lens and window tests
LARP Phase II Secondary Collimator RC-1
Single Detector Design
Teleconference ACS – FREIA 19th June 2017
BGC Collaboration Meeting –
Presentation transcript:

1 Progress of IR Vacuum Chambers Chen Peng May 11,2007

2 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

3 Introduction Vacuum chambers in interaction region. The major chambers of IR are made of oxygen-free Copper.

4 SCQ Chamber The length of chamber is about 1.4 m. The chamber is divided into 4 sections: front cylinder pipe with a BPM, bellows, tapered pipe and cylinder Pipe. BPM ’ s feedthrough cable Rotatable receiver Cooling pipe RF-bellows

5 Crotch Chamber Its structure is complicated, on which 8 BPMs will be installed. Pump pipe, cooling pipe and chamber have been brazed together. Pump Cooling pipe BPM Flange Bellows

6 ISPB Chamber This chamber is about 2.4 m long, with a complicated structure. Cooling water inlet Cooling water outlet Cooling water inlet Cooling water outlet BPM Pump screens

7 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

8 Mechanical Process(1) We assumed that the mechanical process was the most difficult part, however, the machining of vacuum chambers was done well and quickly, most of these chambers have been ready to welding.

9 Mechanical Process(2)

10 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

11 Reason for delay The delay is mostly attributed to the welding process of BPM. All the BPMs are made by Kyocera Company, the flange for welding is made of 30 Ni-Cu (cupro-nickels). BPM Flange

12 BPM Welding The position of BPM on chambers BPM

13 BPM EB-welding At the first time, the vendor used electron beam for BPM welding test, but they couldn’t reach the ideal level. The leak rate was between 10X-4 and 10X-9 mbar.l/s. Leak detection EBW test piece

14 BPM EB-welding(1) During the three months of Electron beam test, they adjusted the parameter of welding angle, depth of melt, etc; however, the figure still couldn’t rise to 10X-10 mbar.l/s. Welding fixture Welding on test piece

15 BPM EB-welding(2) The vender considered that the flange material was inhomogeneous and the microelement ( Mn&Fe ) in material would affect welding process; therefore, electron beam couldn’t be welded well. The content of flange

16 BPM EB-welding(2) The vender considered that the flange material was inhomogeneous and the microelement ( Mn&Fe ) in material would affect welding process; therefore, electron beam couldn’t be welded well. The content of flange

17 BPM Welding According to the discussion with Kyocera technicians, the vendor knew that in the internal of BPM, the flange was brazed to ceramic at 780 degree (AgCu28). They tried to braze BPM on oxygen free-copper at nearly 700 degree, so that they could protect the inner seam when BPM was welded. And they come to an agreement with Kyocera technicians on this method. Flange Pin (Ti) Inner seam Ceramic BPM structure

18 BPM Braze Welding(1) The vender made some samples to approve it was feasible to braze , success rate was above 70%. Braze-welding test sampleLeak detection

19 BPM Braze Welding(2) After being brazed, 2 BPMs’ seams leaked on the first one. 4 BPMs’ seams leaked on the second one. BPM brazed on crotch chamber

20 BPM Repair-Welding(1) The vendor advised to repair-welding the first one with the same solder (AgCuIn15),which it was no beneficial to seams; and it broke another 2 seams in BPM. There are only 4 BPMs working well in each crotch chamber. The first one The second one Red is for bad BPM

21 BPM Repair-Welding(1) The vendor advised to repair-welding the first one with the same solder (AgCuIn15),which it was no beneficial to seams; and it broke another 2 seams in BPM. There are only 4 BPMs working well in each crotch chamber. The first one The second one Red is for bad BPM

22 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

23 Substitute Chamber In order to tune beam in storage ring in Nov 2006, we made a pair of substitutes for vacuum chamber in Sept. Stainless steel crotch chamber Substitute chamber

24 Substitute Chamber A stainless steel vacuum chamber was installed in interaction region in Oct, and now the chambers are working well. Installing the Substitute chamber

25

26

27 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

28 BPM Repair-Welding(2) The diameter of flange in BPM is 12.5mm, we will make a hole (ø16mm) on chamber. We braze BPM to a ring (OD:ø16mm), brazing success rate is 75%. We weld the ring and chamber with electron beam. ø16mm BPM braze-welding test ø16mm ring (oxygen-free copper)

29 BPM Repair-Welding(2) According to plenty of tests, we believe that the heat from electron beam has no effect on the brazing seam. Presently, making holes on chamber is under way. Because the welding seams can’t be dealt with acid, keeping the chamber clean when machining the holes is very important. EBW

30 Assembly Welding of Crotch Chamber EBW After repair-welding of BPM, the crotch chamber will be welded with bellows.

31 Assembly Welding of SCQ Chamber 8 pole BPM brazing test at front cylinder pipe has been done, and the braze technique is adopted. Cylinder pipe and tapered pipe have been brazed together. At the end of May, we will assembly weld these two parts together

32 Assembly Welding of ISPB Chamber Multistage braze welding is very important, in order to maintain the strict tolerance required for installation through the magnets. We obtained the experience by means of installing substitute chambers. Four sections have been completed. We need to connect three sections in a string and then weld to the fourth one.

33 Time Schedule We spend more time on communicating with the vender, and update the progress schedule in time. Our new schedule is as followed: SCQ Chamber : 8 pole BPM welding, assembly welding (EBW) May 11 ~ June 5, 2007 Crotch Chamber : BPM repair-welding, assembly welding (EBW) April 29 ~ May ISPB Chamber : assembly welding (braze) June 3 ~ July 26, 2007

34 Outline Introduction Mechanical Process Reason for delay BPM Welding Substitute Chamber Work Plan Summary

35 Summary The mechanical process is almost completed. The manufacture of holes( ø 16mm) on crotch chambers is ongoing. Repair-welding of BPM is a hard project, and should be done step by step, so that we can minimize the risk of damage. The IR substitute has been installed in the tunnel and works well. Assembly welding will be began in June this year, and many technical problems will be confronted with, however, we have confidence in solving them ASAP.

36 Thank you