Division Of Early Warning And Assessment MODULE 6: PRERARING FOR THE ASSESSMENT AND REPORTING PROCESS.

Slides:



Advertisements
Similar presentations
Module 2: National IEA process design and organization
Advertisements

EuropeAid Pre-Assessment and Assessment for Parliamentary Development Promoting domestic accountability: engaging with parliaments EC support to governance.
Science Agenda: Contextualising Science Communications in our environment Thulani Cele.
Guide to Conducting Meetings and RAP sessions
Adult HIV Outpatient PBR Tariff Development National Reference Group Meeting 21/05/10.
Module 4 Planning SP. What’s in Module 4  Opportunities for SP  Different SP models  Communication plan  Monitoring and evaluating  Working session.
Working with the Teachers’ Standards in the context of ITE. Some key issues for ITE Partnerships to explore.
Division Of Early Warning And Assessment MODULE 4: MANAGING THE ASSESSMENT AND REPORTING PROCESS.
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Stevenson/Whitmore: Strategies for Engineering Communication 1 of 11 Team Writing When to use a team writing strategy  When a large document must be produced.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
MSP course 2007 Phase 0 – Setting up Kumasi, Ghana 2008 Wageningen International.
ACTeon Innovation, policy, environment Madrid – WFD Conference April 2006 How to proceed with the Programme of Measures and the River Basin Management.
1 A Two-Days Workshop on “COMMUNITY MOBILIZATION”
The Operational Planning Process
A N I NTRODUCTION TO A DVOCACY : T RAINING G UIDE Ritu R. Sharma Women Thrive Worldwide Ritu R. Sharma Women Thrive Worldwide.
E 9 meeting on Teacher Development for inclusive relevant Quality Education.
E mpowering S taff T hrough I nstitute P lanning (ESTIP) Academic managers workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
Campaigning jef training days June definition campaign = an operation or series of operations energetically pursued to accomplish a purpose.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Effective Meetings Meetings are one of the major forms of communication for projects and in the general business environment These can be positive and.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.1. Essential tasks, change management 1.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Structure of Course  Written paper (25%)  Essay (30%)  Presentation (45%)
Evaluation of the SEND Pathfinder Programme: Early Findings Graham Thom and Meera Prabhakar May 2012.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
SITUATION ANALYSIS. CONTENT Why do we do a situation analysis? What needs to be achieved? Steps in development of the Situation analysis Defining provisional.
“Sunlight is said to be the best of disinfectants...” Louis D. Brandeis ( )
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
REGIONAL WORKSHOP OF THE CAPACITY DEVELOPMENT FOR CDM PROJECT 16TH TO 18TH 2004 MAPUTO, MOZAMBIQUE Review and Future Plans:Sensitization and Capacity Development.
Division Of Early Warning And Assessment MODULE 5: PEER REVIEW.
CONDUCTING A PUBLIC OUTREACH CAMPAIGN IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Conducting a Public Outreach Campaign.
Training and Environmental Education By Munshimbwe CHITALU Environmental Council of Zambia Zambia.
Workshop Conclusions and Recommendations   To establish a responsibility system for EIA management and enhance the accountability of government officials.
Delivering Results Since 1975 Vancouver Calgary Edmonton Toronto Lakeland Catholic School District Education Planning Project Objectives, Work Plan, Input.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis September, Nairobi, Kenya 1/18 Consultations with users in preparing.
Planning issues and challenges
1 Stakeholders involvement in BDP. 2 ContentsContents MRC & Public Participation History, Policy and Strategy BDP & Stakeholder Involvement – Stakeholders:
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Introduction to policy briefs What is a policy brief? What should be included in a policy brief? How can policy briefs be used? Getting started.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
A STRATEGY FOR REDUCING DEMAND IN ILLICIT PRODUCTS FROM ENDANGERED SPECIES Background: Why reduce demand? Expert Workshop outcomes Strategy principles.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
10. STEP 1: DEFINE & SCOPE Essential EAFM Date Place 10. Step 1: Define and scope the FMU Version 1.
International Recommendations for Energy Statistics (IRES): A progress report Fourth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
DEVELOPING THE WORK PLAN
Ulrike von Lonski, Director of Communications, WPC UIA Round Table 2015 Workshop: Communication Strategies: Getting the message across.
TCRF Strategic Planning Process A Stakeholders’ Consultative Retreat- Morogoro 26 th -27 April 2013.
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
Module 3 Engagement techniques 3a Introduction. What’s in Module 3a  Range of techniques  Different techniques for different levels of engagement 
Tom McBride.  This report on the PPIR Project proposes a way of defining and formally recognising how professional engineers interact with, and respond.
1 ISWGNA and AEG: Mandate and governance 7 th meeting of the Advisory Expert Group on national accounts Apr 2012, New York.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
A Professional Development Series from the CDC’s Division of Population Health School Health Branch Professional Development 101: The Basics – Part 1.
Information Sharing for Integrated Care A 5 Step Blueprint.
Customised training: Controversial issues and post-16 citizenship.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
By Dr. Talat AnwarAdvisor Centre for Policy Studies, CIIT, Islamabad Centre for Policy Studies, CIIT, Islamabad
GCM Community Involvement Tool Kit Glenburn Lodge, Muldersdrift, South Africa November 27-28, 2007.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
United Nations Regional Workshop on the 2020 World Programme
Integrating Gender into Rural Development M&E in Projects and Programs
Presentation transcript:

Division Of Early Warning And Assessment MODULE 6: PRERARING FOR THE ASSESSMENT AND REPORTING PROCESS

Division Of Early Warning And AssessmentOverview This module outlines on how to prepare for the assessment and reporting process. It shows:  How to prepare for the assessment process as a project  How to outline the stages of the assessment  How to organize tasks by institutions, and  How to communicate the message on environmental assessment effectively

Division Of Early Warning And Assessment Introduction  Careful and complete planning of the whole process from conceptualization to production is essential before starting any activity  Some activities may be modified later, include those that seem most feasible at the time of the plan.  Include in the plan a strategy to communicate your activities to the public and to show them how they will gain  Learn from existing best practices

Division Of Early Warning And Assessment Outline the SOE report as a project How AEO-2 was planned as a project:  All key players were identified  Responsibility of each player was clarified  Major outputs of the project were outlined

Division Of Early Warning And Assessment Clearly state all stages  Draw out all stages of the activity, clearly defining their sequence and how each one of them adds to the progress of the project  Make sure all direct participants clearly understand the sequence of activities and know what their role is, if any, at every stage throughout the whole process  May need to draw several supplementary flow charts for different groups to clearly understand their roles and responsibilities

Division Of Early Warning And Assessment An example of the stages (Rump 1966)

Division Of Early Warning And Assessment Assign responsibility for each stage of the report  For each stage, state the tasks involved, the organization to carry out each task, and the expected output, e.g. AEO identified 10 tasks.  May be difficult to stick to the original schedule till the end but it is still useful to let participants know what is expected

Division Of Early Warning And Assessment Consecutive tasks, responsibilities, and results outline for AEO-2 Task 1: Engage CC’s Task10: Printing and distribution UNEP-DEWA Africa Draft agreements with CC’s UNEP-DEWA AfricaFinished Report

Division Of Early Warning And Assessment Communicate SOE message widely  Communicating the message requires special attention especially at the national and sub-national levels where detailed information is required from stakeholders  Should be part of the original plan not an afterthought during the progress of activities  Reach a very broad audience including non- scientists and non-specialists

Division Of Early Warning And Assessment  Study the beliefs, lifestyles, available time to absorb the message, etc., of each group addressed and decide on the most effective mode of communication  Modify and improve your message to make it more effective as you know more about each group during the time of message delivery  Continue to deliver and modify messages over time Communicate SOE… (cont’d)

Division Of Early Warning And Assessment SOE message should be:  Relevant and desirable to each specific audience, pointing out what the group stands to gain by participating  Understandable by the particular audience

Division Of Early Warning And Assessment  Delivered by a very wide system to cover all groups of society. Consider the following media and select what is most appropriate for particular groups:  Periodic reports on critical issues  Bulletins on new developments  Articles by in-house experts or by professional writers  Newsletters  Radio and television  Internet-based reporting  Other alternatives:  Posters  Picture books  Songs  Dialogues  Street theatre SOE message… (cont’d)

Division Of Early Warning And Assessment Real Life example from South Africa  SA developed capacity for producing SOE reports at national, provincial, and city level since 1990s  The National Environmental Management Act provided the legal mandate  In preparation for the assessment, wide consultation took place with input from over 200 stakeholders and comments from the public

Division Of Early Warning And Assessment  Consensus on the issues was agreed upon by a wide range of stakeholders and specialists in natural resources, and social, economic and political environments.  Information on each of the issues was gathered and interpreted by specialists in the relevant fields.  The framework was developed through a series of expert workshops and general review Real Life example… (cont’d)

Division Of Early Warning And Assessment Process of preparing South Africa’s national SOE Report

Division Of Early Warning And Assessment Development of the 2005 report  Project initiated by conducting comprehensive national planning sessions. Issues reported in the 1999 report were reviewed to determine their currency and to see if new issues have emerged  Empowerment of historically disadvantaged individuals in environmental assessment and reporting was given important focus by including these groups in project management and coordination. This helps to ensure skill transfer