1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas.

Slides:



Advertisements
Similar presentations
MnDOT Experience with the Integration Process Tim Clyne January 24, 2012 AFK50(2) Subcommittee Meeting.
Advertisements

Licensing Because DARWin-ME will not be available for licensing until April 2011, the annual license fees will be prorated for the period April through.
Implementation of Darwin – ME Chris Wagner, PE July 26-29, 2010 Kansas City, MO.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Recruitment of the New LTPP SPS-10: Warm Mix Asphalt Experiment Gabe Cimini LTPP NCRSC Project Manager.
Innovations in HMA Performance Testing John D’Angelo D’Angelo Consulting, LLC Canadian User Producer Group for Asphalt.
Development and Application of the Asphalt Mix Performance Tester Ramon Bonaquist, Ph.D., P.E Advanced Asphalt Technologies, LLC.
CONINFRA º TRANSPORTATION INFRASTRUCTURE CONFERENCE São Paulo – July 29th – 31th, 2009 CONINFRA º TRANSPORTATION INFRASTRUCTURE CONFERENCE.
Advanced Asphalt Technologies, LLC “Engineering Services for the Asphalt Industry” WHRP Project HMA Fatigue and Low Temperature Properties to.
Recalibration of the Asphalt Layer Coefficient Dr. David H. Timm, P.E. Mrs. Kendra Peters-Davis.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
2006 Mid-Continent Transportation Research Forum and Workshop “Making Research Pay Off” August 17–18, 2006 Madison, Wisconsin Concurrent Session 3 : Flexible.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Guide for Mechanistic-Empirical Design of New and Rehabilitation Pavement Structures By Matt Mason.
Concrete and Concrete Pavements Research Group. Meet the research team… 3 PhD Students 4 MS Students 1 Undergrad.
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
Pavement Analysis and Design
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Design of Roadway Drainage Systems Using Geocomposite Drainage Layers by Barry R. Christopher, Ph.D., P.E.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
APAM Annual Paving Conference April 21-22, 2015 Mt. Pleasant, MI Michael Eacker, MDOT Justin Schenkel, MDOT.
TRB AFK10 Committee on General Issues in Asphalt Technology Update on NCAT Test Track and Other Research Results April 24-26, 2006.
Activities as Turner-Fairbank Highway Research Center Jack Youtcheff Materials & Construction Team Federal Highway Administration
Session 3-6 HMA Overlays.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
Chapter 9. Highway Design for Rideability
Characterization of Alaskan Hot-Mix Asphalt containing RAP
Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
PAVEMENT MAINTENANCE 1:
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
National Cooperative Highway Research Program. Superpave Mixture and Aggregate Expert Task Group Las Vegas, Nevada 16 – 18 September 2003.
A Guidance, Parameters & Recommendations for Rubblized Pavements July 2006.
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
LTPP – Case Studies in Performance Data Mining Transportation Data Palooza – Processing Data Track May 9, 2013 US DOT HQ, Washington, D.C. Yan (Jane) Jiang,
SESSION 6 Thickness Design
WELCOME TO THE WEBINAR This Webinar is being presented from a computer with a resolution of 1280 X Using a similar setting on your machine may improve.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
MODULE 1-2 Introduction to HMA Pavements. Learning Objectives Describe the types of (HMA) pavements Identify the role of each pavement layer Discuss key.
HDM-4 Calibration Henry Kerali Lead Transport Specialist The World Bank.
Insert picture(s) here Amy Simpson, Ph.D., P.E. Gonzalo Rada, Ph.D., P.E. Beth Visintine, Ph.D. Jonathan Groeger Rutting as a Performance Indicator.
Analysis of Variations of Pavement Subgrade Soil Water Content 1 Andrew G. Heydinger, Ph.D., P.E. and 2 B.O.A. Davies 1 Professor and 2 Former Graduate.
Harold L. Von Quintus, P.E., ARA Jagannath Mallela, ARA
National Performance of High Recycled Mixtures. 2 Outline Trends in RAP and RAS usage and practices Motivations for higher recycled contents Barriers.
Using Reflective Crack Interlayer-
TRANSPORTATION ENGINEERING-II
DARWIN AC/AC Overlay Design. Course Materials Tables and Design Procedures for this manual.
CMRA WEBINAR ON NEW SPECIFICATIONS AND IMPLEMENTATION JUNE 15 TH, 2010 Recycled Asphalt Shingles in HMA Implementation: A Perspective from Wisconsin.
FUZZY APPROACH FOR ESTABLISHING THE PAVEMENT CONDITION QUALITY INDEX Gwo-Hshiung Tzeng Institute of Technology Management and Institute of Traffic and.
An Overview of the Asphalt Mixture Performance Tester.
Asphalt Technology Course
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Construction and Performance Evaluation of Roller Compacted Concrete under Accelerated Pavement Testing TRB Paper No: Moinul Mahdi Zhong Wu, PhD.,
Haritha Musty and Mustaque Hossain Kansas State University MATERIALS
Research Implementation WHRP Flexible Group
Presenters: Sumon Roy1 and Badrul Ahsan1
Introduction to Pavement Design
Calculating Dimensions for a Typical Pavement Section using 1993 AASHTO Flexible Pavement Design Guide.
Performance Assessment of 100% Recycled Hot Mix Asphalt
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Illinois’ Joint Research Adventure
Dr. Randy West, P.E. Director / Research Professor
AASHTOWare Pavement-ME Design Software: Materials Library
What’s New In Pavement Design
2019 Pavement Workshop May 21-23, 2019
Presentation transcript:

1 Hot-Mix Asphalt and Flexible Pavement Design: the MEPDG Kevin D. Hall, Ph.D., P.E. Professor and Head, Dept. of Civil Engineering University of Arkansas Flexible Pavement Research Symposium Denver, Colorado -- February 18, 2009

2 The Plan for Today… A Stroll Down Memory Lane (where we’ve been) A Look Up the Road (where we’re going) A Peek at Arkansas’ MEPDG Efforts (how we are trying to get there)

3 Memory Lane: the AASHO Road Test (late 1950s) (AASHO, 1961)

4 Memory Lane: AASHTO Pavement Design (Current – 1993 Edition) Flexible pavement design: the answer is structural number (SN) Then you break SN into layers: SN ≤ (a ACHM * d ACHM ) + (a base * d base ) The design is layer thickness

5 Looking Ahead: M-E Pavement Design Climate Traffic Materials Structure Distress Response Time Damage Damage Accumulation Level 1: I know a lot about this input… Level 2: I know some about this input… Level 3: I know very little about this input…

Looking Ahead: MEPDG Distress Prediction Models –Fatigue Cracking –Rutting –Thermal Cracking –IRI 6

7 Looking Ahead: National MEPDG Efforts FHWA Design Guide Implementation Team (DGIT) NCHRP –1-37: Development of M-E Design Guide –1-39: Traffic Data Collection, Analysis, and Forecasting – 1-40A: Independent Review of MEPDG – 1-40B: User Manual and Local Calibration Guide – 1-40D: Technical Assistance to NCHRP 1-40A – 1-41: Models for Predicting Reflection Cracking of HMA Overlays – 1-42A: Models for Predicting Top-Down Cracking of HMA – 1-47: Sensitivity Analysis of the MEPDG – 9-30: Experimental Plan for Calibration & Validation of HMA Performance Models – 9-30A: Calibration of Rutting Models for HMA – 9-44: Development of Work Plan for Validating Endurance Limit for HMA “Lead States” activities

8 A Quick Peek at Arkansas’ Efforts Sensitivity Analyses Materials Inputs –HMA Dynamic Modulus –Unbound (Soil & Aggregate) Resilient Modulus Traffic Inputs Design Studies Local Calibration –Database / Support Software Development –Section I.D. –Data Collection –Analysis

9 Arkansas: Dynamic Modulus (E*) Level 1 Catalog Validation of Level 3 Prediction Models

10 Arkansas: Dynamic Modulus (E*)

11 Arkansas: Binder (DSR)

12 Arkansas: Traffic

13 Arkansas: Database Development

14 Arkansas: HMA Database HMA Design –Binder Conventional –Brookfield –DSR – Mixture Properties – Dynamic Modulus – Creep Compliance – Indirect Tension Construction –Core Thickness –Bulk Gravity –Max Gravity –Binder Content –Binder Grade –Volumetrics –Aggregate Gradation –Compaction HMA Performance –Cracking –Rutting –IRI Other –FWD/GPR Tests –Friction Results Maintenance –Crack Sealing –Patching –Seal Coats –Milling –Overlay

15 Arkansas: MEPDG Calibration “The calibration and validation of the performance prediction model is a mandatory step…to establish confidence in the design and analysis procedure and facilitate its acceptance and use.” Calibration: the mathematical process through which total (residual) error – the difference between observed and predicted values of distress – is minimized. Validation: the process to confirm that the calibrated model can produce robust and accurate predictions for cases other than those used for model calibration. NCHRP 1-40: Recommended Practice for Local Calibration of the Mechanistic-Empirical Pavement Design Guide

16 1.Select Hierarchical Input Level for Each Input Parameter 2.Develop Experimental Design and Matrix 3.Estimate Sample Size for Each Distress Model 4.Select Roadway Segments 5.Extract and Evaluate Roadway Segment/Test Section Data 6.Conduct Field Investigations of Test Sections to Define Missing Data 7.Assess Bias for the Experimental Matrix 8.Determine Local Calibration Coefficient to Eliminate Bias of Transfer Function 9.Assess Standard Error for Transfer Function 10.Improve Precision of Model: modify coefficients and exponents of transfer functions 11.Interpretation of Results: decide on adequacy of calibration coefficients Arkansas: MEPDG Calibration

Sample size (minimum) –Distortion (total rutting or faulting)20 roadway segments –Load-related cracking30 roadway segments –Non-load-related cracking25 roadway segments –Reflection cracking (HMA only)15 roadway segments Roadway Segment / Condition Surveys –At least 3 condition surveys available for a roadway segment –Condition surveys cover at least 10 years –Increased number of surveys for higher levels of distress –Range of distress magnitudes – minor to “close to” design criteria –Distress definitions/measurements consistent with MEPDG (Data Collection Guide for Long Term Pavement Performance) Arkansas: MEPDG Calibration

18 A Long-Term Effort??? THANK YOU !!!