The RPC Closed loop Gas System Slides from Bianco and Guida.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

LAPD Run 2 Results and Notes Terry Tope
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
RPC Purifiers’ studies /status/ IR, RG
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Gas Avalanche (%) Streamer (%) Maximum (%) Volume (L) Density (g/L) Weight (Kg) R134a , Isobutane , SF.
1 April 7, 2009 C. Lu Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Plans for the Muon Gas and Cooling Systems LHCb infrastructure workshop February Burkhard Schmidt, with important input from Roberto Guida and Beatrice.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
Results from development of Glass RPCs for INO detector
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Report dal Technical Coordinator Anna Colaleo. Detector Status: gas leak problem W+ 1, W+2, W-1 : 12 chambers with gas leak replaced W0 one chamber has.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Summer Updates- Summer Student Report Emine Altuntas Stephen Fee Supervisors: Mar Capeans, Ivan Glushkov, Roberto Guida Gamma Irradiation Facility.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
Optimization of the operation of Muon systems at LHC: a closed- loop gas system for RPCs and a CF 4 -recuperation unit for the CSC of CMS Conseil Européen.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
RPC production at GT (status and plans). Status After the IFR meeting in Rome a new version of the Production Plan have been proposed to GT Main requirements.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
The gas system for the CMS-RPC detector Roberto Guida Collaborazione CMS-RPC Riunione CSN1 Roma, 2 Aprile 2007.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Luke or MTS Q anode. MOBY DICK  Purpose of Moby Dick:  Can we even get to ~10 ppb O 2 and H 2 O?  What other things in Moby will cause loss of LAr.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st, 2009
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Monitoring the Concentration of Fluoride and Other Impurities Across a Purification System Naomi Mburu University of Maryland, Baltimore County Supervisors:
IBBelle: Status & Plans
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
Gas for World wide RPCs Ian Crotty 12 Feb 2015.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Follow-up of the tests with the copper filter
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Presentation transcript:

The RPC Closed loop Gas System Slides from Bianco and Guida

Schedule for completion Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not commissioned Pre-distribution and pump: ok Final distribution:ok (minor detail to fix) Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not commissioned Pre-distribution and pump: ok Final distribution:ok (minor detail to fix) Pending issues IR mixture analyzer still under test Flammable gas detection system not ready Piping heating in the shaft Pending issues IR mixture analyzer still under test Flammable gas detection system not ready Piping heating in the shaft Commissioning strategy Phase 1: flush argon in the system for one week and monitoring the performance (expected in 1 month) Phase 2: injecting the RPC mixture and start final commissioning (expected end of the year) Phase 3: RPC operation with high percentage of fresh mixture (from 50% to 30%) Commissioning strategy Phase 1: flush argon in the system for one week and monitoring the performance (expected in 1 month) Phase 2: injecting the RPC mixture and start final commissioning (expected end of the year) Phase 3: RPC operation with high percentage of fresh mixture (from 50% to 30%)

Test in progress Open issues Purification cycle Effectiveness of the purification Fresh mixture percentage Stability of the system Open issues Purification cycle Effectiveness of the purification Fresh mixture percentage Stability of the system The RPC test site at ISR has been converted to a site for study the closed loop operation Few gaps equivalent to 5 RPCs under test with a closed loop prototype system. More gaps will arrive soon All the detectors are inside a hut with temperature and humidity kept at controlled values The mixture composition and quality are continuously monitored by means of a gas chromatograph The RPC test site at ISR has been converted to a site for study the closed loop operation Few gaps equivalent to 5 RPCs under test with a closed loop prototype system. More gaps will arrive soon All the detectors are inside a hut with temperature and humidity kept at controlled values The mixture composition and quality are continuously monitored by means of a gas chromatograph Gas recirculation Open mode

Recent results New cycle started on July 25 th Gas flow: 1 volume/2.5 h Fresh mixture injection: 30 % Gas quality checked every day with a GC System stable for about one month New cycle started on July 25 th Gas flow: 1 volume/2.5 h Fresh mixture injection: 30 % Gas quality checked every day with a GC System stable for about one month But aside problem: “air” (may be others) contaminant in the R134a cylinders Next step: start a new cycle decreasing the % of fresh mixture to 20

10 R134a cylinders analyzed since July 15 th with the Gas Chromatograph: 5 cylinders < 500 ppm vol “air” 5 cylinders >> ppm vol “air” 10 R134a cylinders analyzed since July 15 th with the Gas Chromatograph: 5 cylinders < 500 ppm vol “air” 5 cylinders >> ppm vol “air” R134a cylinder impurities “air” concentration in one cylinder analyzed while purging Acceptable limit (500 ppm) Purged volume More impurities? Under investigation CERN gas supplier changed in March!! Need help of CERN

PURIFIERS Sampling taken on unused material, after use and after regeneration GAS Sampling taken in various conditions before and after purifiers PURIFIERS Sampling taken on unused material, after use and after regeneration GAS Sampling taken in various conditions before and after purifiers Chemical analysis Study the effectiveness of the regeneration: the procedure does not have effect on Fluride ions. Need to understand the lifetime of the filter Study the effectiveness of the regeneration: the procedure does not have effect on Fluride ions. Need to understand the lifetime of the filter Detailed CMS note in preparation. See also IEEE NSS, San Diego (USA), October 2006 Frascati preprint LNF-06/34 (P)

Gas quality monitoring by means of twelve 50cm x 50cm gaps with pad readout in a cosmic telescope. Under test at ISR knee +200 GT Gas gain monitoring system

Possible scenario: Start with a70% re-circulation for the first month Go to 80 % re-circulation for the second month Go to 90 % re-circulation for third and fourth month Total cost: ~ 200 kCHF Include some contingency: 200 k < RPC gas < 300 k Possible scenario: Start with a70% re-circulation for the first month Go to 80 % re-circulation for the second month Go to 90 % re-circulation for third and fourth month Total cost: ~ 200 kCHF Include some contingency: 200 k < RPC gas < 300 k Gas cost estimation for a four months run (3 weeks per month) 1 vol/3h 18 m 3 Gas cost estimation for a four months run (3 weeks per month) 1 vol/3h 18 m 3 A start up scenario

There is no doubt that the RPC gas system is complex and it represents one of the key tools for the system operation At the start up some learning period will be necessary to bring the system to a stable state In 2008 low luminosity and “presumably” short running period (!!) We have one year work to setup the system and understand operation conditions Combined ATLAS CERN CMS effort Keep level of attention high, but no panic There is no doubt that the RPC gas system is complex and it represents one of the key tools for the system operation At the start up some learning period will be necessary to bring the system to a stable state In 2008 low luminosity and “presumably” short running period (!!) We have one year work to setup the system and understand operation conditions Combined ATLAS CERN CMS effort Keep level of attention high, but no panic Final remarks