What’s New in Fault Diagnostics 15.2. The Fault Diagnostics upgrade to 15.2 specification will be split into two upgrades for this release, the first.

Slides:



Advertisements
Similar presentations
Load Manager The Load Manager screen shows you all your loads that are open and the information in the load. The Load Manager screen shows you all your.
Advertisements

Using the Self Service BMC Helpdesk
HP OpenView Network Node Manager
Chapter 30 ABS and EBS.
1 Course Number Presentation_ID © 2001, Cisco Systems, Inc. All rights reserved. Cisco 7500 High Availability.
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
Operating the Harmonizer
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
BE-2110i VF/WIDEBAND TRANSMISSION TEST SET OPERATING OVERVIEW Slide 1 of 9.
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
F HEPNT/HEPIX Sept, 1999 Use of SPQuery and STAT At FNAL.
Charging System Service
VeriFire Tools Network Diagnostic Utility
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
ADSL Broadband how it works the local network the bigger picture the local picture Julian Pratt Openreach.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
BT Wholesale HARD TURN BACK When shouldn’t I call or request an escalation? There are several occasions when BT Wholesale receive requests on the phone/via.
Current operation (black keys) Descriptions Parameter / protection setting (blue keys) Main points to remember A B C D ? SEPAM UMIs SEPAM UMI OPERATION.
What’s New in Fault Diagnostics 15.0 SP Version. Overview Fault Diagnostics 15.0 release primarily focuses on Advanced Services and enhancements to the.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
Chapter 9 Testing the System Shari L. Pfleeger Joann M. Atlee
Checking Fault Tolerance in Safety and Security-Critical Systems.
Date: File:PRO1_12E.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation Troubleshooting.
360 Control Manager & Cardholder Training Commercial Card Payment Solutions 1.
TRW Code Updates for WCRS Document Activity ERD, EAR Changes December, 2006 Highlights: TRW Automotive December, 2006 TRW Automotive December, 2006 Auto.
Slide 1 What Happens Before A Disk Fails? Randi Thomas, Nisha Talagala
1 End User Support Introduction Identify and select remedies.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Create Accounting and Transfer Journal Entries to General Ledger
© 2012 CenturyLink, Inc. All Rights Reserved. Not to be distributed or reproduced by anyone other than CenturyLink entities and CenturyLink Channel Alliance.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Puissant Panel User Training Esc.. 09:11:35 ACTIVE # * 3 6 RESET SYSTEM CLEAR DISPLAY TEST DISPLAY SILENCE BUZZER ESCAPE ENTER SILENCE.
COR1000 Telecoms Project UK Link Committee Update May 2013.
Standardized Fault Reporting in Electronic Commerce Software University of St. Thomas MBIF 705 – Foundations of Electronic Commerce Jeff D. Conrad December.
Process of Diagnosing a Dynamic System Lab Seminar June 19th, 2007 Seung Ki Shin.
CS223: Software Engineering Lecture 25: Software Testing.
Omniran CF00 1 Key Concepts of Association and Disassociation Date: Authors: NameAffiliationPhone Max RiegelNokia
The Troubleshooting Process. Hardware Maintenance Make sure that the hardware is operating properly.  Check the condition of parts.  Repair or replace.
Low Cost/Low Risk Improvements
QuickServe Online Service Training
WP3: D3.1 status, pending comments and next steps
The 8085 Microprocessor Architecture
OBJECTIVES Discuss the need for electronic stability control (ESC).
Fuel Supply System Service
Placing an order for Etherway Copper
Failure types, Codes, Clearing codes
The 8085 Microprocessor Architecture
How to use this template
In-service Usage, Performance Monitoring & Management Service
LO1 – Understand Computer Hardware
Raising a Customer Controlled SFI (CCSFI) fault Version 1
Raising a Fault Version 1
Guide to Broadband Ordering Options Version 1
Ethernet diagnostic journey explained
How to raise a fault on Business Zone
How to run the standalone diagnostics test
QuickServe Online Service Training
Contents What’s in this User Guide? p3 – Version Control
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Still More LB156 Comment Resolutions Date.
August 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Still More LB156 Comment Resolutions Date.
Presentation transcript:

What’s New in Fault Diagnostics 15.2

The Fault Diagnostics upgrade to 15.2 specification will be split into two upgrades for this release, the first on 29 th May and the second on 29 th June The 15.2 release will include four new stand alone test tools: DLM data tool – Delivery 29 th May Copper line test – Delivery 29 th May Network Incident check – Delivery 29 th June Consistency check test – Delivery 29 th June and the removal of the existing Incident check – Delivery 29 th June Overview

Dynamic Line Management Data tool

DLM Data tool The DLM data tool will provide the following information Sync rate – Speed at which user has sync’d with DSLAM Service speed – DSL speed allocated to that circuit BRAS profile – Displays the BRAS profile Noise Margin – Displays the noise margin in dB’s Run Mode – Indicates if the circuit is Interleaved or in Fast mode Interleaved – Shows whether interleaving is on, off or auto Maximum Stable rate – Shows the MSR for the circuit Fault Threshold rate – Shows the FTR for the circuit Maximum Stable rate reset – Shows whether the MSR has been reset Timestamps – Shows date and time that events occurred

Copper Line test The copper line test will provide a test Outcome, The Copper line test will display: Test Outcome – This will inform the user of the test outcome, usually pass or fail Proposed repair actions – This will display the recommendation, e.g. re run test with intrusion consent Additional text – Any further information Description – Result of line test Diagnosis code – Displays the code returned by Openreach to BT wholesale MFL – Main Fault Location – this is supplied to BTW by OPenreacxh and would display the location of fault, i.e. Exchange fault

Network Incident check The copper line test will provide a test Outcome,

Network Incident Check The Network Incident check will provide the following information Trouble tickets – Details of any trouble tickets found that may affect the circuit which is under test Major Service Failure information – Details of any MSF that may affect the circuit which is under test Planned Engineering Works - Details of any PEW’s that may affect the circuit which is under test In addition to the above information, there will be a summary result detailing whether an Incident has been found that may be affecting the circuit under test

Consistency check The copper line test will provide a test Outcome,

Consistency Check The Consistency check will provide the following information BIP Service speed – DSL speed allocated to that circuit BIP Fault Threshold – Shows the FTR for the circuit BIP Resync – Displays details of any re sync operations ADQDSLAM Summary – Shows the summary result of the consistency check with a test outcome and description, e.g success, failure etc BRASDSLAM Summary - Shows the summary result of the consistency check with a test outcome and description, e.g success, failure etc

THANK YOU