CP Chapter 4 Schedule Planning.
Advertisements

Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Developing a Project Plan
Advanced Project Management - CPH
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Lecture 9: Scheduling (Chapter 27) Mehran Rezaei.
Manjari Akella Pranava Nagpal B-Tech(CSE) 4 th Year.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
5/18/2015 L. K. Gaafar PROJECT MANAGEMENT Time Management* Dr. L. K. Gaafar The American University in Cairo * This Presentation is Based on information.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Project Management Techniques.
BA 333 Operations Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Prepared by: Michael Palazzo
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
HIT241 - TIME MANAGEMENT Introduction
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Scheduling: PERT/CPM
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PERT and CPM.
PERT/CPM By Bhupendra Ratha, Lecturer S. L. I. Sc., D.A.V.V., Indore Id:
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
CHAPTER VIII CPM-PERT Instructor : Lect.Volkan ÇETİNKAYA.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Management - CPM/PERT. darla/smbs/vit2 Characteristic of a project A project is a temporary endeavour involving a connected sequence of activities.
Network Analysis : Pert & CPM
 Chapter 6: Activity Planning – Part 2 NET481: Project Management Afnan Albahli.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Managing the Information Systems Project Cont’d
Chapter 16 – Project Management
Project Management.
Project Management Project Controlling
PROJECT MANAGEMENT.
Project Management (專案管理)
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
deterministic Fixed and known in advance, representing a
PERT and CPM.
Project Planning & Scheduling
Project Time Management
Project Scheduling: networks, duration estimation, and critical path
PERT - The Program Evaluation and Review Technique
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
AOA A style of project network diagram in which arrows
Presentation transcript:

PROJECT MANAGEMENT Approaches By- Rahul Jain

One definition of a project: Network analysis Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. One definition of a project: “A project is a temporary Endeavour undertaken to create a "unique" product or service”

PERT PERT estimate the shortest possible time each activity will take, the most likely length of time, and the longest time that might be taken if the activity takes longer than expected.

PERT - Project Evaluation & Review Techniques USED IN : Project management - for non-repetitive jobs (research and development work), where the time and cost estimates tend to be quite uncertain. This technique uses probabilistic time estimates. http://www.mindtools.com/critpath.html

Why Pert What tasks must be carried out. Where parallel activity can be performed. The shortest time in which you can complete a project. Resources needed to execute a project. The sequence of activities, scheduling and timings involved. Task priorities. The most efficient way of shortening time on urgent projects.

PERT- Estimated time Step 1 : Estimate : To, Tp, Tm Step 2: Find Estimated time Te: (Shortest time (To) + 4 x likely time (Tm) + longest time (Tp) )/6

Step 3: Estimate Variance Variance = {[tp-to]/6}2 sd= square root of variance Step 4: Z= (Due date-Expected date)/Std dev. (Te-Tm)/Sd If z is positive then more than 50% chance of completing the project on time.

Time To= Optimistic time can be less than 10% to 20% of normal time . Tp= Pessimistic time can be more than 10% to 20% of normal time .

CPM - Critical Path Method Definition: In CPM activities are shown as a network of precedence relationships using activity-on-node network construction Single estimate of activity time Deterministic activity times USED IN : Production management - for the jobs of repetitive in nature where the activity time estimates can be predicted with considerable certainty due to the existence of past experience.

Critical Path Method Is that the sequence of activities and events where there is no “slack” i.e.. Zero slack Longest path through a network minimum project completion time

CPM ADVANTAGES: Precedence relationships large projects more efficient

Some keyterms There are several key terms Critical Path: The longest time path through the task network. The series of tasks (or even a single task) that dictates the calculated finish date of the project (That is, when the last task in the critical path is completed, the project is completed) The "longest" path (in terms of time) to the completion of a project. If shortened, it would shorten the time it takes to complete the project. Activities off the critical path would not affect completion time even if they were done more quickly. Slack Time: The amount of time a task can be delayed before the project finish date is delayed. Total slack can be positive or negative. If total slack is a positive it indicates the amount of time that the task can be delayed without delaying the project finish date. If negative, it indicates the amount of time that must be saved so that the project finish date is not delayed. Total Slack = Latest Start - Earliest Start. By default and by definition, a task with 0 slack is considered a critical task. If a critical task is delayed, the project finish date is also delayed. (Also known as float time )

CPM Critical Path Analyses are presented using circle and arrow diagrams. In these, circles show events within the project, such as the start and finish of tasks. The number shown in the left hand half of the circle allows you to identify each one easily. Circles are sometimes known as nodes. An arrow running between two event circles shows the activity needed to complete that task. A description of the task is written underneath the arrow. The length of the task is shown above it. By convention, all arrows run left to right. Arrows are also sometimes called arcs.

The Project Network Use of nodes and arrows Arrows  An arrow leads from tail to head directionally Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes  A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish.

Activity on Node & Activity on Arrow - A completion of an activity is represented by a node Activity on Arrow - An arrow represents a task, while a node is the completion of a task - Arrows represent order of events

Benefits of CPM/PERT Useful at many stages of project management Mathematically simple Give critical path and slack time Provide project documentation Useful in monitoring costs

Questions Answered by CPM & PERT Completion date? On Schedule? Within Budget? Critical Activities? How can the project be finished early at the least cost?

example Illustration of network analysis of a minor redesign of a product and its associated packaging. The key question is: How long will it take to complete this project ?

For clarity, this list is kept to a minimum by specifying only immediate relationships, that is relationships involving activities that "occur near to each other in time".

Before starting any of the above activity, the questions asked would be "What activities must be finished before this activity can start" could we complete this project in 30 weeks? could we complete this project in 2 weeks? One answer could be, if we first do activity 1, then activity 2, then activity 3, ...., then activity 10, then activity 11 and the project would then take the sum of the activity completion times, 30 weeks. “What is the minimum possible time in which we can complete this project ? “

We shall see below how the network analysis diagram/picture we construct helps us to answer this question.

CRITICAL PATH TAKES 24 WEEKS FOR THE COMPLETION OF THE PROJECT

Limitations to CPM/PERT Clearly defined, independent and stable activities Specified precedence relationships Over emphasis on critical paths