Extraction from the Delivery Ring November 19, 2013 J. Morgan.

Slides:



Advertisements
Similar presentations
Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
Advertisements

EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Magnets for Mu2e Resonant Extraction: Design and Scope Changes V.Nagaslaev 05/09/2013.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Main Injector Lambertson Aperture Scans David Johnson and Ming-Jen Yang March 17, 2006.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Magnets Technologies for NOνA Transfer Line (& RR30 section) July 21-23, 2009.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
FFAG 4-Bend Injection Line into EMMA C. Johnstone, Fermilab EMMA phone conference July 24, 2007.
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
Investigation of Injection Schemes for SLS 2.0
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
J-PARC main ring lattice An overview
LINAC4 ADVISORY COMMITTEE
eRHIC FFAG Lattice Design
Large Booster and Collider Ring
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Alternate Lattice for LCLS-II LTU Y
NuSTORM - μ Storage Ring with Injection
Beam Injection and Extraction Scheme
HRS at small angles for e+/ e- pair for APEX
PS2 Injection/Extraction Layout
ELENA Extra Low ENergy Antiproton Ring
Multi-Turn Extraction for PS2 Preliminary considerations
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Kicker specifications for Damping Rings
Electron Collider Ring Magnets Preliminary Summary
JLEIC High-Energy Ion IR Design: Options and Performance
IR/MDI requirements for the EIC
Presentation transcript:

Extraction from the Delivery Ring November 19, 2013 J. Morgan

Conceptual Design Antiproton production Muon Campus (g-2 operation) Repurposing Pbar 2

Beamline Design – Dual modes 3.1 GeV/c Pion decay channel, beta functions need to be as small as possible to maximize muon capture 40 pi-mm-mr transverse acceptance, +/- 2% dp/p momentum acceptance Beam does a few turns in Delivery Ring to separate and eliminate protons Single turn extraction into M4 and M GeV/c proton beam bypasses Target Station and is transported in M3 Beam intensity is much higher that Pbar was or g-2 will be Protons are resonantly extracted from the Delivery Ring Extracted beam is transported down M4 to the Mu2e Target g-2 versus Mu2e operation g-2 operation Mu2e operation 3

Strategy for extraction plan - to provide maximum flexibility between experiments at least expense - Work around Mu2e extraction devices Both single turn (g-2) and resonant (Mu2e) extraction Resonant extraction more difficult to design for Electrostatic septa on either side of D2Q3 during Mu2e operation Lambertsons or Lambertson/bending magnet required on either side of D2Q5 Placement of extraction channel defined by resonantly extracted beam Try to reuse existing equipment Pbar kickers have best combination of strength and aperture at FNAL Kickers have the smallest physical apertures in the Delivery Ring Need 8Qx at D2Q5, our donated ANL 8Q32’s need significant work 8Q32 needs more rad. Hardened water lines, relocated power flags g-2 has acceptance goal of 40-pi-mm Large displacement in both planes through D2Q5 limits aperture Kickers must produce large separation (~48 mm) in Lambertson Kicker(s) must produce 7 mr kick to achieve 48 mm separation New devices should be based on existing designs Lambertson is similar to MLAW C-Magnet is shorter, larger aperture version of Main Injector ICA and has more turns Try not to overlap injection and extraction regions 4

Conceptual Design Extraction region 8Q32 40 pi-mm-mr beam envelopes Mu2e septa, relocated kicker Delivery Ring extraction Extraction layout is driven by requirements for Mu2e resonantly extracted beam Lambertson is required for Mu2e to work with electrostatic septa A larger aperture quadrupole is required at D2Q5, using ANL 8Q32 Mu2e resonantly extracted beam will be much smaller than g-2 muon beam g-2 and Mu2e will use a Delivery Ring lattice similar to the Pbar Debuncher lattice Different horizontal trajectories are needed for g-2 and Mu2e A large horizontal bump across the extraction region is used for g-2 g-2 needs an extraction kicker for beam to enter the M4 line Best location for kickers is where Mu2e septa will eventually reside A two kicker system will be used for g-2 operation Can’t get 40 pi-mm-mr acceptance with 3 kicker system Existing Pbar extraction kicker magnets can be reused Extraction scheme provides 40 pi-mm-mr acceptance for g-2 and a common extraction channel for both experiments Pbar/Muon extraction Kicker 5

g-2 operation and Mu2e commissioning Horizontal bend (5  ) Injection kickers Injection Pulsed Septum and C-magnet (septum) Extraction Lambertson and C-magnet (septum) Extraction kickers Vertical bends Vertical bend 6

Dual running mode configuration Horizontal bend (5  ) Injection kickers Extraction septa (Mu2e) Extraction kicker (g-2) Vertical bends Vertical bend Injection Pulsed Septum and C-magnet (septum) Extraction Lambertson and C-magnet (septum) 7

Conceptual Design 30 straight section – injection and extraction lines M3 M4 M5 8

Mu2e Extraction Trajectory 9 J. Morgan Muon g-2 Independent Design Review June

g-2 Extraction Trajectory 10 J. Morgan Muon g-2 Independent Design Review June

Identical pair of Lambertsons won’t work, would need offset field region in LAM2 11

Lambertson upstream, “C”-Magnet downstream 12

Candidate large aperture quadrupoles Pbar LQx (6.5”) magnet Extended aperture along poles ANL 8Qx (8”)magnet No extended aperture 13

14

Changes to improve acceptance in extraction region Extraction kicker moved as far downstream as possible Potential conflict with Mu2e upstream electrostatic septa in dual-mode operation Kicker must be modified to increase strength (8.33Ω instead of 10Ω) for dual-mode 48 mm horizontal minimum separation required in Lambertson Large horizontal bump across extraction region Takes advantage of available physical aperture of large quadrupole at D2Q5 Four motorized quadrupoles (existing in Debuncher) used to create bump Either removed or greatly reduced for Mu2e Need 8 inch quadrupole at D2Q5 Pbar LQ magnet can almost work with current configuration Our only 10Qx magnet isn’t strong enough and is too tall The ANL 8Q32’s need to be refurbished C-magnet used in place of downstream Lambertson Beams are thread through only one Lambertson instead of two C-magnet aperture can be centered on extracted beam Much less stray magnetic field in Delivery Ring Allows lower trajectory through large quadrupole at D2Q5 15

D2Q5 large quadrupole 16

Quadrupole can be pitched to improve downstream aperture 17

Aperture improves as ELAM and ECMAG move closer to the 8Q32 In general, apertures are driven by g GeV/c muon beam, strength by 8.89 GeV/c Mu2e beam Lambertson has design bend angle of 38 mr, requiring 1.13 T-m of integrated field for the 8.89 GeV/c Mu2e beam “C”-Magnet has design bend angle of 57 mr, requiring 1.68 T-m of integrated field for the 8.89 GeV/c Mu2e beam Extraction devices under radiation shielding Cartoon of extraction devices and approximate lengths 18 Extraction magnets

Other magnet work in the near future and a problem B2 (GSJ) refurbishment, to replace the P-1 Line V714 C-Magnet Schedule shows initial planning through December, planning finishing up in January and work beginning at the end of February Work scheduled to take 5.5 months CDA refurbishment, to replace the AP-1 F-17 C-Magnets Schedule shows planning in January and February and work beginning at the end of February Work scheduled to take 5 months May have aperture problem with M-5 horizontal bend magnets Three horizontal bends of 154 mr each, 3.1 GeV/c beam Original plan calls for MDC magnets which can comfortably provide ~1.6 T-m Aperture a little tight after carefully considering the beam sagitta Could “inner” turns of MDC be removed to open up aperture (56 vs. 68 turns) 19