Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Your university or experiment logo here What is it? What is it for? The Grid.
Status Report University of Bristol 3 rd GridPP Collaboration Meeting 14/15 February, 2002Marc Kelly University of Bristol 1 Marc Kelly University of Bristol.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
LHCb(UK) Meeting Glenn Patrick1 LHCb Grid Activities in UK LHCb(UK) Meeting Cambridge, 10th January 2001 Glenn Patrick (RAL)
05/07/00LHCb Computing Model Meeting (CERN) LHCb(UK) Computing Status Glenn Patrick Prototype (Tier 1) UK national computing centre Bid to Joint.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
GridPP News NeSC opening “Media” dissemination Tier 1/A hardware Web pages Collaboration meetings Nick Brook University of Bristol.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Andrew McNab - EDG Access Control - 14 Jan 2003 EU DataGrid security with GSI and Globus Andrew McNab University of Manchester
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Andrew McNab - Manchester HEP - 6 November Old version of website was maintained from Unix command line => needed (gsi)ssh access.
BaBarGrid: Some UK developments Roger Barlow Imperial College 13th September 2002.
The B A B AR G RID demonstrator Tim Adye, Roger Barlow, Alessandra Forti, Andrew McNab, David Smith What is BaBar? The BaBar detector is a High Energy.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
08/06/00 LHCb(UK) Meeting Glenn Patrick LHCb(UK) Computing/Grid: RAL Perspective Glenn Patrick Central UK Computing (what.
April 2001HEPix/HEPNT1 RAL Site Report John Gordon CLRC, UK.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Robin Middleton RAL/PPD DG Co-ordination Rome, 23rd June 2001.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations.
3-Nov-00D.P.Kelsey, HEPiX, JLAB1 Certificates for DataGRID David Kelsey CLRC/RAL, UK
3-Jul-02D.P.Kelsey, Security1 Security meetings Report to EDG PTB 3 Jul 2002 David Kelsey CLRC/RAL, UK
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
…building the next IT revolution From Web to Grid…
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
Tier1 Andrew Sansum GRIDPP 10 June GRIDPP10 June 2004Tier1A2 Production Service for HEP (PPARC) GRIDPP ( ). –“ GridPP will enable testing.
Tier1A Status Andrew Sansum 30 January Overview Systems Staff Projects.
Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford.
Your university or experiment logo here What is it? What is it for? The Grid.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
2-Sep-02Steve Traylen, RAL WP6 Test Bed Report1 RAL and UK WP6 Test Bed Report Steve Traylen, WP6
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
Andrew McNabGrid in 2002, Manchester HEP, 7 Jan 2003Slide 1 Grid Work in 2002 Andrew McNab High Energy Physics University of Manchester.
BaBar and the GRID Tim Adye CLRC PP GRID Team Meeting 3rd May 2000.
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
A UK Computing Facility John Gordon RAL October ‘99HEPiX Fall ‘99 Data Size Event Rate 10 9 events/year Storage Requirements (real & simulated data)
LHCb Grid MeetingLiverpool, UK GRID Activities Glenn Patrick Not particularly knowledgeable-just based on attending 3 meetings.  UK-HEP.
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
10-May-01D.P.Kelsey, WP6 Security1 Certificates/Authorisation for DataGrid Testbeds David Kelsey CLRC/RAL, UK
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
7-Mar-01D.P.Kelsey, User access, WP6, Amsterdam1 WP6: GRID mapfiles and Users access policy David Kelsey CLRC/RAL, UK
BaBar-Grid Status and Prospects
UK GridPP Tier-1/A Centre at CLRC
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
LHCb(UK) Computing Status Glenn Patrick
Presentation transcript:

Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial College (Q) Liverpool (R) Manchester (Q) Oxford (Q) QMW (Q) Lots of other UK sites interested in GRID …will join later testbeds.

Dave Newbold, University of Bristol8/3/2001 Comments on TB0 Need some policies on ‘small’ sites: How will they contribute? Are they useful in the quantum state? Can we have a clear set of requirements / guidelines. Support services in the UK: RAL GLOBUS support mailing lists GLOBUS (+ other tools) in RPM form More manpower coming soon: 6 people (50% WP6) to be appointed in the next few weeks Distributed at 6 sites

Dave Newbold, University of Bristol8/3/2001 Resources Two ‘large’ sites signed up RAL CSF cluster GLOBUS-enabled (oo 100 CPU, TB disks, 10’s TB tape) Not all for TB! A dedicated cluster has been ordered + will arrive soon: 10’s CPU, TB disks. Liverpool MAP: A prototype Tier-2 facility Some fraction available for TB use - discussing Network SuperJanet IV (‘production’ network for UK Universities) 2.5GB/s to all (?) sites now - but not locally within institutes yet! 10GB/s by TB2...

Dave Newbold, University of Bristol8/3/2001 Security CA set up: Works! (thanks to Andrew Sansum) …but very laborious (isolated CA machine => floppy disks!) Some 10’s of certificates granted to existing CSF users Can potential grant to outside users - will define policy very soon Policies: Account activity must be traceable to an individual ‘Manual’ checking of identity required now Likely to be similar for Universities No restrictions on use of ‘quantum’ facilities by experiments …but will review this after TB0 startup

Dave Newbold, University of Bristol8/3/2001 IS + apps Information service Modelled on the TB0 proposal: Single top-level server (at QMW - Alex Martin) o=grid, o=ukhep… Each site has a server (so a two-level tree) Applications LHC production - LHCb and CMS (soon + now!) BaBar interest, with possible new central facility CDF / D0 / others… all interested to use GRID facilities How do we accommodate them all? Probably need several working releases of software at a time...