New design With fewer parts and easier manufacture 330 190 250 16.3 degrees 20mm 245.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

J.P. Langston Brake Retrofit
KPL CHINA SOURCING CO., LTD. Mail: Website: FURNITURE.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Front Suspension Dismantling
Team Uno 11/11/04 Bunker Curnes Product Assembly.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
Threads and Fasteners.
Specification section 3.3
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Threads and Fasteners.
Unit 4 Machine Tools Machine Tools (Basic Elements, Working principle
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Drilling machine.
Centre lathe.
Resource 2 Manufacturing Techniques Machining Operations & Techniques.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Components By. Mikayla Wirth. A hard drive is a the computers main storage media device that permanently stores all data to the computer. A hard drive.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
Hole Types & How To 4 main types of holes: Clearance Hole Tapped/Threaded Hole Countersunk Hole Counterbored Hole.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Moeller GmbH GB Leistungsschalter Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner July.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Motor Mounting MECH1200 Foot Mount: Simple and common Tabs or feet that are attached at the four corners of the motor and attaches to a bedplate. Sometimes.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Chapter 4 Creating Placed Features. Holes Hole command o Simple drilled o Counterbore o Spotface o Countersink o other info: Tapped Clearance Hole NPT.
Definitions and callouts
Dallas BEST 2014 Build Session Jigs and Control Board Example Joel Graber Dallas BEST.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Camera Motion System Requirement Design Details FEA.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
STEP 1: ASSEMBLE ANGLE PLATES
DRILLING Dept. of Mech & Mfg. Engg..
Drilling machine Presented By: JAIN YASHKUMAR K
DRILLING Diagram shows the parts of a standard pillar drilling machine.
Parul Institute of Engineering & Technology
Methods for Mounting LCD Displays
Report on construction of LP2 spaceframe endplate
Reminder of Stave250 Tooling Design
LCD Splicing Screens Wall-mounted Guide
Initial Design for Canoe Balls and Grooves on Wrist
EML 2023 – Threads and Fasteners
Drilling machine.
This shows the bracket (blue) and part of the metal end of one of the lines (red) the bolt is removed (green)
Drawing of stud.
Type 2 Supercrystal Type 1 Supercrystal
EML 2023 – Threads and Fasteners
Valve stem “gag” mechanism
Machine Tools Machine Tools (Basic Elements, Working principle
Aluminium Profile System
Presentation transcript:

New design With fewer parts and easier manufacture degrees 20mm 245

Backplate Conects to the permanent plate clearance for bolts Dowles to hold bracket Bolt hole to hold bracket

bracket Connects to the upright and supports the shelf degrees (10, 200) - dowel 2(10, 140) - clearance 3(10, 80) – dowel 4(,) – clearance 5(,) – dowel 6(,) - clearance

Shelf The optical bench on whoch the components are mounted Threaded holes to bracket Threaded holes for clamps

Optical mounts 48mm 20mm 8mm 18mm So centre of mount is 14mm behind centre of optical component and 17 behind front face Camera mounts 15mm 45mm So centre of mount is 30mm behind CID 48mm 10mm

890 – edge of GE – top of bracket intercept with wall

bracket Connects to the upright and supports the shelf degrees 220 1(10, 200) – dowel 6mm 2(10, 140) – clearance 6mm 3(10, 80) – dowel 6mm 4(35.5, 107.4) – clearance 6mm 5(126.6, 66.1) – dowel 6mm 6(217.7, 24.8) – clearance 6mm 7(53.7, 99.2) – clearance 8mm 8(199.5, 33.1) – clearance 8mm mm plate 7 8 Holes in plates’ faces to go all the way through

Backplate Connects to the permanent plate (10, 150) – clearance M8 2(180, 150) – clearance M8 3(10, 10) – clearance M8 4(180, 10)- clearance M8 1(7.5, 140) – dowel 6mm 2(7.5, 80) – tapped hole 6mm 3(7.5, 20) – dowel 6mm 15mm plate Holes in plates’ faces to go all the way through

Shelf The optical bench on which the components are mounted 220 by 170 by 15 plate 1(7.5, 190) – tapped hole 6mm 2(7.5, 110) – dowel 6mm 3(7.3, 30) – tapped hole 6mm All tapped for optical clamp Holes in plates’ faces to go all the way through