Status of Activities Related to EPICS and Accelerator Control in China Presented by Guobao Shen KEKB Control Group EPICS Collaboration RICOTTI Tokai, 8.

Slides:



Advertisements
Similar presentations
BLM System for NSRL HLS PCaPAC 2000, Oct.9 ~ 12, 2000Page 1 PC and CAN Bus in Beam Loss Monitor System for NSRL Yonggang Cui, Beibei Shao Department of.
Advertisements

Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
ITER Fast Controller Prototype Feng Wang, Shi Li and Xiaoyang Sun Institute of Plasma Physics, Chinese Academy of Sciences 4/15/20151 The Spring 2010 EPICS.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
SPEAR Upgrade – EPICS Status
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
Overview of PLS/PLS-II Control System Jin Won Lee Beam Operation Team Accelerator Division Pohang Light Source Korea
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
1 A PC/Linux-based Control System with EPICS for RFGTB S. Araki, K. Hirano, J. Odagiri, T.T. Nakamura and N. Terunuma High Energy Research Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plans F. Willeke 9 th ASAC Meeting for NSLS-II Project February 1-2, 2012.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Daresbury Laboratory Mark Heron Overview of DIAMOND to the European EPICS Meeting at PSI May 2001 Overview of DIAMOND to the European EPICS Meeting at.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing October 18, 2007.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
Shanghai Deep UV-FEL Control System Control Group Ding Jianguo 2009/2/13.
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
FAIR Accelerator Controls Strategy
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Fast Fault Finder A Machine Protection Component.
Experience of Developing BEPCII Control System Jijiu ZHAO IHEP, Beijing ICALEPCS2007 October 18, 2007.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 KEKB Archiving Dec Tatsuro KEK.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
ICALEPCS 2007 The Evolution of the Elettra Control System The evolution of the Elettra Control Sytem C. Scafuri, L. Pivetta.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Aug/20/2002EPICS Progress at IHEP1 BEPCII Control Group Presented by Ge Lei Aug/20/2002.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Experience of Developing BEPCII Control System
Report Technical Director Storage-Ring-Installation Completed
MicroTCA Development and Status
The Survey of the Power Supply Reliability at SSRF
Current Status of IPM-Linac Control System
ATF/ATF2 Control System
Tango status at Elettra
WP11: electron and proton beam testing
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
The EPICS running envirionments in the five accelerator projects
Fill-pattern Control System for KEKB
CEPC RF Power Sources System
Advanced Research Electron Accelerator Laboratory
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Status of Activities Related to EPICS and Accelerator Control in China Presented by Guobao Shen KEKB Control Group EPICS Collaboration RICOTTI Tokai, 8 Dec 2004

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC BEPCII HLS CSNS  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Introduction  Started in the middle of 1990s IHEP started EPICS research around 1995 HLS started from 1996 The first EPICS seminar was hold in IHEP at 1997 IHEP got the EPICS license at Jan HLS got the EPICS license at Jan SSRF got the EPICS license at 1998

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC (Materials are provided by Associate Prof. Jianguo Ding) BEPCII HLS CSNS  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Introduce  SSRF project Intermediate energy 3rd generation SR light source Suspended for almost 2 years from 2001 Formal approval by Government at Jan Control System will be based on EPICS  100 MeV LINAC Approval in 2002 Now under constructing Commissioning started at the beginning of Nov Will be upgraded to 300MeV for FEL (?)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Structure of Control System OPI ( LINUX/PC ) RF Ethernet CPUCPU Power Supply OPI ( LINUX/PC ) OPI ( LINUX/PC ) CPUCPU Interlock Safety CPUCPU Vacuum System Timing

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Tools  EPICS Base: upgrading from R  OPI OS: Linux  IOC OS: Tornado1.0.1/vxWorks5.3.1 Development Platform  3 SUN Ultra10 with Solaris2.6  1 SUN Ultra60 with Solaris2.7  EPCIS Tools: BURT ALH StripTool ChannelArchiver EDM /MEDM/DM2K Capfast/VDCT

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- System Configuration  5 subsystems Power Supply, Vacuum, RF, Timing and interlock, Beam Diagnostics (Labview, non-EPICS)  3 OPIs PC with Linux Redhat 9  3 IOCs 2 Motorola MVME Motorola MVME162  12 Controllers 2 A-B SLC 500, 1 A-B PLC 5, 6 A-B 1794 DeviceNet 2 Industrial Pack (IP) Modules, directly VME I/O

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Record Types  Total: ~1,500 Records Ai, Ao, Bi, Bo, Mbbi, Mbbo, Subroutine SubsystemEquip.PVs AIAOBIBOMBBIMBBO Gun RF Modulator P.S Vacuum Other Total **2 years old, see reference 1

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting  Total 7 persons 5 persons related EPICS  Others: 2 students Status in SSRF LINAC -- Man Power

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- OPI (1) Power Supply and Modulator Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- OPI(2) Phase Shifter and Amplifier Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- OPI(3) Gun Monitor and Vacuum Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- OPI(4) Vacuum Device Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Central Control Room

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- CRT Monitor

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Rack of IOC, Trigger, Timing and B.M.

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Power Supply Room

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in SSRF LINAC -- Work Hard

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC BEPCII ( Materials are provided by Prof. Jijiu Zhao) HLS CSNS  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Introduction  BEPCII Control System Based on EPICS R&D has been done in DEC Development started in Spring of 2004 Under construction and in good progress  System data of BEPCII 1729 devices (930 at BEPC) About 20,000 channels (4,500 at BEPC)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Control System Structure Vac.IOC RF IOC PS IOC Central control room Local control area Device or low level control system Ethernet Vac. local RF LocalPS local

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Tools  EPICS BASE R  OPI OS: Solaris 2.8, Linux/PC  IOC OS: Tornado2.0/vxWorks5.4  Third Tools: Labview, Tcl/tk, etc.  EPICS Tools: ALH VDCT SNL Channel Archiver MEDM/EDM SAD

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- System Configuration  7 subsystems Power Supply, RF, Vacuum, Beam Diagnostic, Injection, LINAC, Interlock  OPI SUN Solaris BLADE 2000, some Linux PCs  31 IOCs: 22 MVME5100s for transport lines and storage rings 7 MVME5100s for Timing Systems 2 MVME2431s for LINAC  Local Controller Fieldbus: CANbus, ControlNet RS-232 PLC: AB-PLC, S7-PLC(Siemens)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Driver Development  PS control PSC/PSI ( From SNS) interface for Chopper PS VME - IP Carry board/IP modules for Corrector PS VME-CAMAC for TL PS control  Vacuum control VME - ControlNet for Vacuum and Cryogenic control VME - RS232  Linac control VME - CANbus  RF Control Developed by Thomcast company

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Number of devices and channels DeviceNum.AIAODIDOWFotherSum Power supply Vacuum Injection kicker Radio frequency Beam diagnostic Injector Linac Summary ** 2 years old, See Reference 3

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Present Status  Power Supply prototype has been done in Dec Supported Functions: On/off, settings/readings, status monitor  Event timing system New design finished in May 2004 Software design began in September now software analysis is under way  Vacuum prototype has been done collecting pressure and data of I.P. to IOC with RS-232  Cryogenic control Communication software between IOC and PLC has been done

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Present Status (Cont.)  RF Klystron system is testing  Injection control for Kicker Power Supply Driver and application are developing  Linac Use SNL to carry out the ramping Use EDM and TCL/TK to build OPI Have been put into use in Nov  High level application -- SAD all of source and most of data file from KEKB In Jan Built on SUN workstations Main panel transfer from KEKB Good collaboration between KEKB and IHEP

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting  Total 16 persons 12 persons related to EPICS  Others: 7 doctoral candidates Status in BEPCII -- Man Power

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- OPI (1) Prototype of Power Supply Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- OPI (2) LINAC Power Supply Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- OPI (3) Beam Optics Calculation Application (SAD)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- OPI (4) COD Correction Application (SAD)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- MCC and New Console

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Chopper on-line testing Accuracy and Stability: 5x10-5

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in BEPCII -- Prototype of PS control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC BEPCII HLS ( Materials are provided by Associate Prof. Gongfa Liu) CSNS  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Instruction  HLS 2nd generation dedicated synchrotron light source 200MeV electron LINAC and 800 MeV electron storage ring  New Control System Phase II started from April 1999 formally Prototype system set up at May 1999 First subsystem commissioning at June 2000 Last subsystem commissioning at Oct. 2003

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- New Control System Structure

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting  EPICS BASE R3.13.8, upgraded from R beta12 at June 2003  OPI: Solaris7/8; Red Hat7/9; Windows98/2000  IOC: Tornado1.0.1/vxWorks Development Platform: SUN/Solaris  Third tools: Tcl/tk, PHP, PLC Ladder Software Package, LabView/ActiveX  EPICS tools: DCT MEDM SDDS (Closed Orbit Correction) SNL Status in HLS -- Tools

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- System Configuration  6 Subsystems Power supply, RF, Vacuum, BPM, Interlock, Water  21 OPIs 1 Sun Ultra 1, 3 Sun Ultra 10, 1 Sun E250, 2 PC (Linux), 14 PC (Windows)  17 IOCs : IPC (with Flash Disk)  107 Local Controllers 56 IPC (with Flash Disk), 12 PLC, Others, 39

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Detail Lists of Subsystems subsystem IO C Local controllerOPI IP C PL C Others SUN Ultra 1SUN Ultra 10SUN E250 PC/LinuxPC/Window s Ring main mag. PS Ring corr. Mag.PS18 Ring vacuum1 6 Ring Flag 1 Injection system 3 RF2121 Water system1 RFKO1 2 Ring octupole mag. PS1 Transport line mag. PS220 Switch mag. PS1 1 Kly. focusing coil PS16 Analysis Mag. PS 1 Linac vacuum1 15 Linac mag. PS18 Linac Flag1 1 interlock 1 Linac Modu. pulse PS 6 sum

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Record Statistics

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Record Type  Record type Ai, Ao Bi, Bo Mbbi, Mbbo MbbiDirect, MbboDirect Subroutine, subOut maio  Self development subOut and maio

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Upgrade process  May 1999 set up a prototype system  June 2000 First subsystem commissioning (Storage ring main magnet power supply control system)  Oct Last subsystem commissioning (Storage ring Octupole magnet power supply control system)  June 2003 upgrade EPICS base R beta12 ­ > R3.13.8

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Man Power  Total 5 persons  3 persons related to EPICS

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- OPI (1) Main Control Panel

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- OPI (2) Power Supply Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- OPI (3) Ring Vacuum Monitor

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- OPI (4) Ramping Control

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- OPI (5) Ring Orbit Control (SDDS)

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- Central Control Room

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in HLS -- LINAC Control Room

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC BEPCII HLS CSNS (Materials are provided by Associate Prof. Chunhong Wang)  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting  CSNS China Spallation Neutron Source 100KW, pulsed neutron source 25 Hz repetition frequency A LINAC with lower energy A rapid cycle synchrotron ring with higher energy  Jointly host by Institute of Physics, Institute of High Energy Physics and CAS  IHEP response for building the facility  In the process of R&D Status in CSNS -- Introduce

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in CSNS -- CSNS Architecture

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Status in CSNS -- Control System  Include power supply control, vacuum control, RF control and machine safety protection  EPICS based Many people of CSNS have already accepted  The preliminary design doesn ’ t yet start.  Power supply control prototype has started

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Outline  Introduction  EPICS Status in China SSRF LINAC BEPCII HLS CSNS  References and Special Thanks

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting References 1. Design Reports of SSRF 100 MEV LINAC Songqiang Liu, “CN-T33-100MeV LINAC Control System” Jitang Li, Lifang Zheng, Songqiang Liu, “CN-T38-LINAC P.S. Subsystem Control” Lifang Zheng, “CN-T51-LINAC Modulator Subsystem Control” Shouming Hu, “CN-T53 LINAC RF Subsystem Control” Shouming Hu, “CN-T55-LINAC Timing Subsystem Control” Jianguo Ding, “CN-T57-LINAC Phase Shifter Subsystem Control” Jianguo Ding, “CN-T58-LINAC GUN Subsystem Control” Haifeng Miao, Lifang Zheng, Jianguo Ding, “CN-T63-LINAC Vacuum Subsystem Control” 2. Jianguo Ding, Lifang Zheng, Shouming Hu, Haifeng Miao, Jitang Li, Songqiang Liu,“An EPICS-based LINAC Control System”

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting References (Cont.) 3. J. Zhao, “Progress of the Controls for BEPCII”, EPICS Seminar In IHEP, 20 August, Gongfa Liu, “HLS new control system”, EPICS Seminar in Hefei, 4 Mar Materials of BEPCII are provided by Prof. Jijiu Zhao 6. Materials of CSNS are provided by Associate Prof. Chunhong Wang 7. All photos of SSRF 100MeV LINAC are provided by Associate Prof. Jianguo Ding 8. All photos of HLS are provided by Associate Prof. Gongfa Liu

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Special Thanks  SSRF Prof. Songqiang Liu Associate Prof. Jianguo Ding Associate Prof. Lifang Zheng Associate Prof. Shouming Hu Associate Researcher Haifeng Miao  BEPCII Prof. ZHAO Jijiu Associate Prof. Chunhong Wang  HLS Prof. Weimin Li Associate Prof. Gongfa Liu

Dec 2004RICOTTI Tokai, EPICS Collaboration Meeting Thank You!