Amendment 08 Page 1 Appendix 4A Manifest Assumptions This information is provided for bidding purposes only and will be subject to change at the time of.

Slides:



Advertisements
Similar presentations
PowerPoint Show by Emerito
Advertisements

SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY.
The International Space Station TO This All Pictures and text from NASA sources, unless otherwise noted.
Commercial Orbital Transportation System (COTS) Status
Viewing Study: ISS Window and ISS External Camera Views of Docked Orbiter RCC on WLE during Assembly Missions 1E and 1J ISS CAD model views utilized to.
The Vision for Space Exploration – Challenge & Opportunity ISS Panel Report Robert D. Cabana ISS Panel Chair March 30, 2005.
Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
1 IAC Late-Breaking News Analysis of STS-118 Tile Damage Utilizing the Tools and Techniques Developed Since Return to Flight William H. Gerstenmaier Associate.
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
Minimalist Human Mars Mission Surface infrastructure discussion July 26 th, 2008.
C2V2 Technical Requirements and Constraints
International Space Station Origin: The international space station project began as a cooperative agreement to build and operate a large orbital station.
Space Station Operations Frank E. Hughes December 2005 Copyright 2005 Frank E. Hughes.
Press Briefing 2 August 2000 Frank H. Bauer,
Page 1 Presentation title – file name – date From ATV to ATV Evolution February 2004 Hans-Jörg Heidmann Transportation for In-Orbit Infrastructure and.
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Current Safety Status Phase III Flight Safety Review 12 Jan 2009.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
Page 1 Appendix 4A Manifest Assumptions This information is provided for bidding purposes only and will be subject to change at the time of contract start.
27-Apr-2009K. Sembach 1 Servicing Mission 4 - Revisited Ken Sembach STScI Hubble Project Scientist April 27, 2009.
May 21-25, 2007Phase II FSR1 ISS Hardware Magnetic Susceptibility Testing and Analysis Trent Martin NASA AMS Project Manager
SPHERES ISS Flight Preparation & Hardware Status 08 July 2002 Steve Sell Stephanie Chen
Shuttle Mission: STS-117 Atlantis Launch/Landing Date: June , 2007 Assembly Elements: S3/4 Truss Segment with Photovoltaic Radiator and 3 rd Set.
The Biomass Production System (BPS) Orbital Technologies Corporation (ORBITEC), Madison, Wisconsin Innovation The BPS is an innovative plant growth chamber.
Space Station Will it be accessible for You and Me?
Training Purposes Only JEM RAD SILK JMU (Ver. 1.1) 1 Notice : This technical data is furnished on the condition that it will be used by and.
STS-114 Mission Objectives Test and evaluate new inspection and repair techniques Deliver supplies and cargo to the Space Station via the Raffaello MPLM.
STS-125 Hubble Space Telescope(HST) Servicing Mission 4 (SM4) Overview Presented By: Jerry L. Ross October 6, 2009 Prague, Czech Republic 1.
National Aeronautics and Space Administration Lyndon B. Johnson Space Center ISS Payloads Office Utilization / Research Cargo Familiarization April 2005.
Energy Power System. Electricity Electricity is the flow of electrons through a conductor Electricity will only move through a closed circuit, if the.
EVA: Don’t Leave Earth Without It
KSC Ground Operations Timeline. KSC CGSE TIM A Technical Interchange Meeting regarding the Cryo Ground Support Equipment was held at KSC November 1 st.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
Mission Integration OZ2/Winston J. Reid/(281) Page No. 1 International Space Station Alpha Magnetic Spectrometer-02 AMS-02 Ops TIM - Ops Assessment.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Cyclops Splinter With SpinSat and Lonestar. Cyclops Splinter With SpinSat and Lonestar Cyclops provides the ISS Program with a method to transfer internally.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
1 Space Test Program - Houston 4 Payload Overview POIWG, 26 Jul 2012.
JAXA Rodent Experiment Requirements Futoshi MATSUNAGA (JAXA IS)
1 International Space Station Program Mission Integration & Operations Increment 19_20 Overview POIWG 22 July 2008 OC/Increment Engineer Karen Alfaro.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
Phil Dempsey ISS Vehicle Office July 15, 2014 Inspection Considerations from the ISS Program NASA In-Space Inspection Workshop 2014.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Cindy Grant SPACE-X & Orbital Lead POD Office/EO
First Spaceflight of an Educator Astronaut Barbara R. Morgan - B.A. Human Biology, Stanford University - Teaching Credential, College of Notre Dame, Belmont,
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
CPCG-HM Overview POIWG July 26, 2012 Brittney Macon 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POIC Data Management POIWG, June 22-25, 1999 G.K./Ops/POIWG/June_99/POIWG_Data_Flow_6_99 1 Onboard Payload Data Flow Capabilities Gary Knickerbocker POIF.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
Callisto Mission LaRC Option
The International Space Station (ISS)
An Introduction to the NanoRack Platform and CubeLab Modules
ATLANTIS: The Final Mission PowerPoint Show by Emerito
SHUTTLE PROCESSING DISCOVER --- DISCOVERY
SPDM Overview.
Key Benchmarks in a LEO Economy Robert L. Curbeam Jr.
“Introduction to UPC-Orion” June 4, 2008
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

Amendment 08 Page 1 Appendix 4A Manifest Assumptions This information is provided for bidding purposes only and will be subject to change at the time of contract start. ISS Flights 1J/A, UF4 and 14A payload complements include payload developer hardware and carriers processed by CAPPS. Thus, the Customer and CAPPS simultaneously process the mission hardware as shown on the manifest as. CAPPS is responsible for processing and integration of CBC’s and SLP’s. For SpaceHab missions, CAPPS is responsible for Spacelab Tunnel configuration and integration. Unless otherwise identified, the ISS Resupply/ Return flights designated UF consist of the following complements on ascent and descent –MPLM contains 5 Resupply Stowage Racks (RSRs), 4 Resupply Stowage Platforms (RSPs), 2 International Standard Payload Racks (ISPRs), 1 Refrigerator/ Freezer integrated in an Active MPLM –LMC carries 3 Launch On Need (LON) ORU’s or Payloads –Sidewall Carrier (SWC) carries 1 Launch On Need (LON) ORU or Payload The ISS Resupply/ Return flights after FY07 consist of Unpressurized Logistics Flights (LF-U#) and Pressurized Logistics Flights (LF-P#). –The ascent and descent complement for Unpressurized Logistics Flights (LF-U) consist of 8 ORU’s or Payloads integrated on the 1st Unpressurized Logistics Carrier (ULC) 8 ORU’s or Payloads integrated on the 2nd Unpressurized Logistics Carrier (ULC) 4 Launch On Need (LON) ORU’s or Payloads integrated on a Lightweight MPESS Carrier (LMC) 1 Launch On Need (LON) ORU’s or Payload integrated on a Sidewall Carrier (SWC) –The ascent and descent complement for Pressurized Logistics Flights (LF-P) consist of 5 Resupply Stowage Racks (RSRs), 4 Resupply Stowage Platforms (RSPs), 2 International Standard Payload Racks (ISPRs) and 3 Refrigerator/ Freezers integrated in an Active MPLM 8 ORU’s or Payloads integrated on one Unpressurized Logistics Carrier (ULC) LON missions utilize a LMC and/or a Sidewall Carrier

Amendment 08 Page 2 FY 2002FY 2003FY 2004FY 2005FY 2006FY 2007 FY 2008 STS-107 [Spacehab-DM, FREESTAR, MEIDEX, RAMBO-P] 9A [S1 (3 TCS Radiators, CETA Cart A, S-band Equip), SHIMMER] 11A [P1 (3 TCS Radiators, CETA Cart B, UHF), MEPSI] ULF1 [ISPRs, RSRs, RSPs (MPLM); FHRC, UTA, BCDU, 4 WVS Stanchions (ESP-2); ISS Attach P/Ls (SWs), PCU (LMC), Phoenix (STARSHINE, CONCAP IV, FALCONSAT II)] 12A [P3/P4 (PV Arrays, PVR-6 battery sets, 2 ULCAS); PDGF (sidewall), RAMBO-P, MEPSI] 12A.1 [Spacehab Single Cargo Module; Pump Module, DDCU CP, MBSU CP, MDM Rad, WVS FSE Rtn (ICC); PFCS rtn (ICC); P5 (PVRGF OSE)] 13A [S3/S4 (PV Arrays - 6 Battery Sets, 4 PAS);] 13A.1 [Spacehab Single Cargo Module; EAS Rtn FSE (ICC); S5 (PVRGF OSE)] 15A [S6 (PV Arrays, PVR-6 Battery Sets)] 10A [Node 2 (DDCU racks, ZSRs); PDGF (Sidewall)] 9A.1 [MTsM; Science Power Platform; 2 Solar Arrays; ERA, PVGF-TBD (VCC-RD1)] STS-120 [HST-SM-04] 1J/A [ELM PS (4 JEM PM System, 3 ISPRs, 1 Stow); MT/CETA Prot/ Stbd Rails (ICC-D1)] 1J [JEM PM (4 JEM System Racks, JEM RMS); Hitchhiker] UF3 [RSPs, RSRs, ISPRs, 1 JEM Rack, MELFI, (MPLM); ORU R&R, NTA-P R&R, NTA-S rtn (LMC/ SWC); 3 Hitchhikers] 1E [Columbus Module (ISPRs); 2 Columbus P/L (LMC); Hitchhiker] UF4 [S3 Attached P/L; SPDM (SLP-D rtn); ICC-D1 rtn; 3 Hitchhikers] 2J/A [JEM EF; ELM-ES (EF Pyld, ICS, SFA w/carrier); 4 SM MMOD Wings, 2 SPP SA w/truss (VCC-RD1); VCC-RD1 rtn; GAS/ SEM] UF5 [RSPs, RSRs, ISPRs (MPLM); ORUs/PL (LMC/ SWC); Hitchhiker] 14A [PL (Express-1), Cupola (SLP);ATA-P R&R, 2 Columbus and 2 EF P/L (VCC-UD1) ] UF6 [RSPs, RSRs, ISPRs (MPLM); ORUs/PL (LMC/ SWC)] ISS & SHUTTLE PAYLOAD GROUND PROCESSING OVERVIEW KENNEDY SPACE CENTER DATE: 24 APRIL 02 MANIFEST: Appendix 4A For bidding purposes only! LEGEND: Payload Processing (Customer Program Mgmt w/ CAPPS Launch Site Services) Shuttle Integration (CAPPS Program Mgmt)Payload Processing (CAPPS Program Mgmt & Launch Site Services) Payload Processing (Customer Program Mgmt w/ CAPPS Launch Site Services and CAPPS Program Mgmt for assigned payloads) Cupola in Storage Cupola arrival & checkout ULF2 [NTA-S, ATA-S, PVR FSE (ESP-3); RSPs, RSRs, (MPLM); ATA-S rtn (LMC); Hitchhiker] UF7 [Centrifuge Accommodations Module (CAM) (ZSRs); VCC-RD2 rtn] BLUE - Hitchhiker LF-P1

Amendment 08 Page 3 FY 2007FY 2008FY 2009FY 2010FY 2011FY 2012FY 2013 ISS & SHUTTLE PAYLOAD GROUND PROCESSING OVERVIEW KENNEDY SPACE CENTER DATE: 24 APRIL 02 MANIFEST: NOTE: Manifest, Schedule and ISS Assembly Sequence in this timeframe is under review. For bidding purposes only! Appendix 4A LF-P2 LF-U1 LF-U2 LF-P3 LF-U3 Contract End LEGEND: Payload Processing (Customer Program Mgmt w/ CAPPS Launch Site Services) Shuttle Integration (CAPPS Program Mgmt)Payload Processing (CAPPS Program Mgmt & Launch Site Services) Payload Processing (Customer Program Mgmt w/ CAPPS Launch Site Services and CAPPS Program Mgmt for assigned payloads) LF-P5 LF-U4 LF-U5 LF-P6 LF-U6 LF-P4 LF-P7 LF-U7 LF-U8 LF-P8 LF-U9 LF-P10 LF-U10 LF-U11 LF-P11 LF-U12 LF-P9 LF-P12 LF-U13 LF-U14 LF-P13 LF-U15 LF-U16 LF-P14 LF-P15 LF-U17 LF-P16 LF-U18 LF-P17

Amendment 08 Page 4 ACRONYMS ATAAmmonia Tank Assembly BCDUBattery Charge Discharge Unit CBCCross Bay Carrier CPCold Plate DDCUDC to DC Converter Unit DMDouble Module EASEarly Ammonia Servicer ELMExperiment Logistics Module ELM-ESExperiment Logistics Module- Exposed Section ELM-PSExperiment Logistics Module- Pressurized Section ERAEuropean Robotic Arm ESPExternal Stowage Platform FHRCFlex Hose Rotary Coupler HSTHubble Space Telescope LMCLightweight MPESS Carrier LOLILimited Operational Life Items LONLaunch on Need MBSMobile Remote Servicer Base System MBSUMain Bus Switching Unit MDMMultiplexer/Demultiplexer MELFIMinus Eighty Degree Laboratory Freezer for ISS MMODMicro-Meteor/Orbital Debris MTMobile Transporter NTANitrogen Tank Assembly ORUOrbital Replacement Unit OSEOrbital Support Equipment OTDORU Transfer Device PCMMUPulse Code Modulation Master Unit

Amendment 08 Page 5 APPENDIX 4A ACRONYMS PCUPlasma Contactor Unit PDGFPower Data Grapple Fixture PFCSPump/Flow Control Subassembly PVPhotovoltaic PVRGFPhotovoltaic Radiator Grapple Fixture PWPPortable Work Platform RMSRemote Manipulator System RSPResupply Stowage Platform RSRResupply Stowage Rack SASolar Array SFASmall Fine Arm SLPSpace Lab Pallet SMService Module SPDMSpecial Purpose Dexterous Manipulator SPPScience Power Platform SWCSidewall Carrier UTAUtility Transfer Assemble WVSWireless Video System ZSRZero-g Stowage Rack