4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Large Platforms For Push-pull Hitoshi Yamamoto 18-Sep-2007 IRENG07.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
1 FD Support and Pacman for GLDc 27 Aug Yasuhiro Sugimoto KEK.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
Alain Hervé, ILD Workshop, Seoul 17 February 2009, 4365-ILD-T-Coil-Developments.ppt Possible Coil Developments ILD Workshop - SEOUL - 17 February 2009.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 17. Sept. 2007ILC IRENG07; SLAC1 LDC Engineering Design (Status)
SiD Engineering and Solenoid Kurt Krempetz (Layer 5) (Layer 1) VXD.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
Kitakami Side AHCAL Assembly or anywhere in any detector.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Experimental Hall in Mountain Regions
2016/9/30 Yasuhiro Infra/CFS mini-ws
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Handling Engineering Update
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Updated Design of Detector Hall
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Present status of the flux return yoke design
INSTALLATION SEQUENCE
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
Sub-Detector Assembly Area Summary of discussion at ALCW2015
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Presentation transcript:

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Concept of Platform and Environment A. Hervé / ILD-Webex meeting 17 February 2009

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 ILD Detectors Design N.S. ETH-Z, January Conceptual view of Push-Pull IP Garage

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 False floor modules to compensate platform height Towers for near-by services Services On IP Two Experiments, two positions

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 ILD 1 Beam Pipe position ILD Service position Services False floor modules can be rearranged to modulate working space disposition in garage position Two Experiments, two positions

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Tentative horizontal separations

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Increased lateral space to work on muon system by shifting one false floor module muon Valve box Dewar and local services

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Design N.S. ETH-Z, January Possible Cavern radius (~14m) Crane 18m An effort has been made to reduce the radius of the Underground Hall

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 We have played on three parameters to try to reduce hall diameter Height of supports Crane clearance Pillar for Q0

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Q0 Pillar shifted connection by flexible lines 4m Simple opening in garage position using last Matthieu’s drawing Design N.S. ETH-Z, January 2009.

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Q0 recessed in endcaps 4m Design N.S. ETH-Z, January 2009.

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February m Design N.S. ETH-Z, January Q0 recessed and Central Barrel shifted 6m

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February m Design N.S. ETH-Z, January m Small alcove allowing to decouple Q0 from endcap Top view

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Advantages of platform for push-pull operation The use of a platform is well adapted to ILD sectioning and construction. With the use of airpads and indexing system, this should allow a millimetric repositioning. The presence of the platform can be taken advantage of to isolate the experiment from seismic events and from surrounding vibrations.

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 The CMS plug is good example of a platform rails 22 m 2m thick 2000 tons PLUG

4366-ILD-T-Platform-and-environment.ppt A. Hervé Seoul workshop 17 February 2009 Example of anti-sismic supports that could be installed below the platform