Do We Really Need the LHC Luminosity Upgrade? O. Brüning Many thanks for help from: Ralph Assmann, Gianluigi Arduini, Christian Carli, Elena Chaposhnikova,

Slides:



Advertisements
Similar presentations
Bunch spacing, pile up and all that Frank Zimmermann HL-LHC/LIU brainstorming Jiva Hill, 24 June 2011.
Advertisements

Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Long-range beam-beam compensation at HL-LHC Tatiana Rijoff, Frank Zimmermann ColUSM # /03/2013.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
Name Event Date Name Event Date 1 LHC Upgrade We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
LHC Machine Upgrades L. Ponce On behalf of the LHC Operation Team 1.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
Beam-beam studies in the LHC and new projects T. Pieloni for the LHC and HL-LHC Beam-Beam Teams ICFA mini-workshop on "Beam-Beam Effects in Hadron Colliders”
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Frank Zimmermann, material for LTC coherent tune shift due to collimator impedance - its dependence on gap size, bunch length, chromaticity, beta function,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Criteria for dynamic aperture limits and impact of the multipolar errors: summary of the simulations with beam-beam for levelling scenarios at 5 and 7.5x10.
Machine Progress Towards Higher Luminosity Frank Zimmermann CMS Upgrade Meeting FNAL, Chicago, 7 November 2011 (via EVO) Thanks to Martin Aleksa, Gianluigi.
Overview of Wire Compensation for the LHC Jean-Pierre Koutchouk CARE-HHH Meeting on beam-beam effects and beam-beam compensation CERN 08/28/2008.
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LHC Luminosity Achievements & Limitations O. Brüning.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Pros and Cons of the 200 MHz System G. Iadarola, K. Li, E. Metral, G. Rumolo Thanks to: L. Medina, J. Esteban Mueller, B. Salvant, E. Shaposhnikova, R.
Turnaround time in modern hadron colliders & store-length optimization
Collision with a crossing angle Large Piwinski angle
Y.Papaphilippou Thanks to
Operating IP8 at high luminosity in the HL-LHC era
Scenarios for 2017 and 2018 Thanks to Gianni, Fanouria, Gianluigi, Dario, Stephane, Elias, Michi, Jamie, Christoph, Rogelio, Mirko, Riccardo, Hannes,
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
contribution to the round table discussion
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Task 2. 5: Beam-beam studies D. Banfi, J. Barranco, T. Pieloni, A
Space charge studies at the SPS
fundamental equations of LHC performance
Field quality update and recent tracking results
Beam-beam effects in eRHIC and MeRHIC
Longitudinal beam parameters and stability
Wire, flat beams and beam-beam MDs in 2017
Large Booster and Collider Ring
Follow-up of HL-LHC Annual meeting
Field quality to achieve the required lifetime goals (single beam)
Machine Progress Towards Higher Luminosity
Measurements, ideas, curiosities
LHC (SSC) Byung Yunn CASA.
Beam-Beam Interaction in Linac-Ring Colliders
HL-LHC operations with LHCb at high luminosity
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Frank Zimmermann & Walter Scandale
Pushing the LHC nominal luminosity with flat beams
Large emittance scenario for the Phase II Upgrade of the LHC
Presentation transcript:

Do We Really Need the LHC Luminosity Upgrade? O. Brüning Many thanks for help from: Ralph Assmann, Gianluigi Arduini, Christian Carli, Elena Chaposhnikova, Haiko Damerau, Wolfram Fischer, Stephane Fartoukh, Werner Herr, John Jowett, Riccardo de Maria, Vladimir Shiltsev, Simone Gilardoni, Massimo Giovannozzi, Elias Metral, Laurent Tavian, Maurizio Vretenar, Frank Zimmermann

Luminosity – performance:  1) maximize bunch intensity (beam-beam limit)  2) minimize beam size (constant beam power)  3) maximize number of bunches Performance optimization for the LHC 2 Operation at beam-beam limit  use R for performance optimization – leveling: LPS, SE, CC  What is the beam-beam limit in the LHC?! Chamonix, January 2011 Oliver Brüning BE-ABP

LHC Challenges: Beam-Beam Interaction 3 Tune spread due to head-on beam-beam interaction wo x-ing: Werner Herr et al, LPN 416 Crossing angle configurations: Top Left: only head-on Top right: = 200  rad (≈ 7  ) Bottom left:= 285  rad (≈ 10  ) Bottom right = 400  rad (≈ 13  ) Chamonix, January 2011 Oliver Brüning BE-ABP  Q ≈ 0.01 Long range interactions:

LHC Challenges: Beam-Beam Interaction 4 Werner Herr  Q y ≈ 0.01  Q x ≈ 0.01 Chamonix, January 2011 Oliver Brüning BE-ABP Tune Footprint: Pacman bunchesnominal beams alternating crossing planesall insertions Head-on & Long range

Expected Beam-Beam limit for the LHC 5 Experience from other machines: 1)SppS:  = with 3 IPs   Q = )Tevatron:  = 0.01 with 2 IPs   Q = )The performance in both colliders is limited by resonances and the b-b tune spread: avoid resonance of order 12 or lower!  the tune is sandwiched between a low order resonance driven by lattice non- linearity and a high order resonance driven by beam-beam 4)Higher b-b tune shifts are possible but with degraded performance (luminosity lifetime and background – not yet a problem in the LHC) Chamonix, January 2011 Oliver Brüning BE-ABP Jacques LHC‘99 V. Shiltsev & PRST, A&B 8, 2005

Expected Beam-Beam limit for the LHC 6 Tevatron Run2 experience Chamonix, January 2011 Oliver Brüning BE-ABP PRST, A&B 8, /12 th 4/7 th 8/14 th 3/5 th 6/10 th small amplitude particles large amplitude particles 1)Vertical  blow up largest if small amplitude particles close to 3/5 th or 7/12 th. 2)Horizontal  blow up largest if tune close to 7/12 th. 3)Halo particles lost faster if close to 7/12 th. 4)Tune shift depends on bunch position in train  ‘scallops’ 5)‘Scallops’ only developed for large b-b parameters (≥ 0.02)

Expected Beam-Beam limit for the LHC 7 Nominal LHC configuration and design report assumption: 1)Place the tunes between 10 th and 3 rd order resonances: Q x = 64.31; Q y = (SppS equivalent below the half integer) 2)Assuming that coupling will be bigger in the LHC than in the SppS, the LHC tunes are separated by  Q = 0.01   total space available in tune diagram:  Q = 0.01  can go to  Q = if coupling is small and  Q = )Use alternate crossing planes to minimize overall tune foot print with long-range beam-beam. 3)Use  * to control long-range beam-beam (soft landing) Chamonix, January 2011 Oliver Brüning BE-ABP Jacques LHC‘99 Jacques LHC‘99

LHC Challenges: Beam-Beam Interaction 8 DA from simulations: Werner Herr & Dobrin Kaltchev nominal tunewith b-b and  Q tot = 0.01  bb = /135/161/33/10 Chamonix, January 2011 Oliver Brüning BE-ABP

Beam-Beam: Bunch by bunch LHC status 11/21/2015 Fill 1409:  n = 1.6  m; N b = ; 256 bunches   =   Q tot = 0.023!! Fill lost during ‘adjust’! 9

LHC Challenges: Beam-Beam Interaction 10 Werner Herr & Dobrin Kaltchev nominal tune 4/13 4/14 2/7 1/33/10 Chamonix, January 2011 Oliver Brüning BE-ABP DA from simulations: Bunches with 2 HO collisions have 1  particles on 3/10 th resonance! Bunches with 3 HO collisions have 2  particles on 3/10 th resonance! with 3 b-b:  Q tot =  bb =

Expected Beam-Beam limit for the LHC 11 Modified LHC configuration: 1)Avoid small amplitude particles close to resonance clusters. Halo particles are also faster lost if close to resonance but impact on luminosity should be small 1)Divide the bunches in 3 groups: 1, 2 and 3 head on collisions 2)Adjust pre collision tune such that all tunes are below 1/3 rd resonance and low amplitude particles for each group are above a strong resonance cluster: One group above 4/13 th One group above 3/10 th One group above 2/7 th Chamonix, January 2011 Oliver Brüning BE-ABP Tevatron

LHC Challenges: Beam-Beam Interaction 12 tune wo bb 4/13 4/14 2/7 1/33/10 Chamonix, January 2011 Oliver Brüning BE-ABP DA from simulations: Werner Herr & injection Dobrin Kaltchev Assume in the following:  Q tot = 0.02 and  bb = with 3 b-b:  Q tot = 0.03  bb =

Performance estimates in terms of  * : 13Chamonix, January 2011 Oliver Brüning BE-ABP HL LHC Upgrade: -  * of 0.15m accessible for round 7 TeV -  * of 0.3m / 0.075m accessible for flat 7 TeV Minimum  * at 7 TeV for existing triplet: -  * of 0.3m to 0.4 based on measured aperture and nominal settings Long range b-b can be alleviated by  * increase (‘soft landing’):  assume 20% larger  * as quoted for normal operation   * of 0.5m accessible for round 7 TeV with nom   * of 0.2m accessible for round 7 TeV with HL J. Gareyte S. Fartoukh

Assumptions on Injector Performance I: 14Chamonix, January 2011 Oliver Brüning BE-ABP Existing injector performance with LINAC4: -50ns: ppb;  n = 3.5  m (if not limited by e-cloud; scaled from 2008 MD and relying on lower  -t SPS lattice) -25ns: ppb;  n =3.5  m – 10  m (single batch [MV 2010& EC]) PAC’07; CERN-AB Existing injector performance: -50ns: ppb;  n = 2.5  m to 3  m (SB injection into PS) -50ns: ppb;  n = 1.5  m (DB 2008 MD [EM]) -50ns: ppb;  n = 3  m to 4  m (SB injection into PS)  limited by SPS single bunch  ppb;  n = 1.8  m to 2.5  m with DB?!? -25ns: ppb;  n = 3  m to 4  m (GA) -25ns: ppb;  n = 4  m to 10  m (limited by SPS instabilities [EC])

LHC Performance Estimates 15Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns N1.15E+111.2E+111.7E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h]80 -> IBS longitudinal [h]61 -> Piwinski parameter geom. reduction beam-beam / IP3.10E-033.1E-034.4E-036.6E-03 Peak Luminosity nominal emittancesmall emittance Performance reach for existing 7 TeV: Radiation damping: hor: 26h ver: 13h

LHC Performance Estimates 16 Performance reach for existing machines + LINAC4: Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns N1.15E+111.4E+112.5E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m] 3.75  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h]80 -> IBS longitudinal [h]61 -> Piwinski parameter geom. reduction beam-beam / IP3.10E E-036.5E-03 Peak Luminosity nominal emittance

Assumptions on Injector Performance II: 17Chamonix, January 2011 Oliver Brüning BE-ABP Injector performance with LINAC4 and upgrades (PSB): -50ns: ppb;  n = 1.1  m  n = 1.5  m (SG, MG and HD assuming a Laslett space charge limit of  Q = -0.3) -25ns: ppb;  n = 1.5  m  n = 1.8  m (SG, MG and HD assuming a Laslett space charge limit of  Q = -0.3) Injector performance with LINAC4 and upgrades: SPS SC limit -50ns: ppb;  n = 3.75  m (SPS space charge EC:  Q = -0.13) -25ns: ppb;  n = 2.5  m (SPS space charge EC:  Q = -0.13)

LHC Performance Estimates 18Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns 25ns 50ns N1.15E+112.0E+113.3E+112.0E E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h]80 -> IBS longitudinal [h]61 -> 6021 Piwinski parameter geom. reduction beam-beam / IP3.10E-034.5E-034.9E-037.7E-38.6E-3 Peak Luminosity small  *‘large’  * Performance reach for LINAC4 + LIU + HL triplet:

LHC Performance Estimates 19Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns 25ns 50ns N1.15E+112.0E+113.3E+112.0E E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E IBS horizontal [h]80 -> 106>4056>4056 IBS longitudinal [h]61 -> 60>4056>4056 Piwinski parameter geom. reduction beam-beam / IP3.10E-033.6E-034.9E-036.8E-37.6E-3 Peak Luminosity small  *‘large’  * Performance reach for LINAC4 + LIU + HL triplet: long bunch

Summary Performance Reach: 20Chamonix, January 2011 Oliver Brüning BE-ABP Do we really need the LHC luminosity upgrade? Yes -Existing LHC & injectors can reach nominal performance with 25ns and 50ns beams:L = cm -2 sec -1 -Small emittance option with 50ns operation can reach: L = cm -2 sec half nominal total beam current for 50ns beam option -Nominal machine with LINAC4 and 50ns operation can reach: L = cm -2 sec -1 with approximately nominal total beam current -Full upgrade can reach: L ≥ cm -2 sec -1 with geometric reduction factor!  CC & LRBB wires are ideal tool for leveling!

Summary Performance Reach: 21Chamonix, January 2011 Oliver Brüning BE-ABP Beam-beam limit: -Assuming a beam-beam limit of 0.02 and alternating crossing for round beams (geometric reduction of  b-b ) LHC reaches b-b limit only with all upgrade options, 50ns beams and  * = 0.5m. -The beam-beam limit can also be reached with other upgrade configurations if: -LRBB compensation is implemented (  can operate with smaller crossing angle  larger ‘R’) -With the Crab cavity operation (  larger ‘R’)  LRBB wire compensation and Crab cavities are ideal tools for luminosity leveling and maximizing integrated luminosity

Summary Performance Reach: 22Chamonix, January 2011 Oliver Brüning BE-ABP Beam-beam limit: -Actual beam-beam limit in the LHC is vital input for LHC upgrade strategy (HL and LIU [e.g  vs intensity optimization])  Should give measurement of maximum attainable beam-beam parameter a high priority in 2011 operation (as function of number of long-range collisions and separation!)  b-b = in 3.5 TeV with 50ns, ,  = 2.5  m)  Should also address the importance of lifetime degradation of tail particles above 3 .  Should test operational procedures for tune adjustments during luminosity fill to compensate for tune changes as beam intensity drops over a fill!

Summary Performance Reach: 23Chamonix, January 2011 Oliver Brüning BE-ABP General limit: -Total beam current of ca. 0.8 A at limit of LHC cryo system [Laurent Tavian] + limits from other major LHC components (R. Assmann in Chamonix 2010)  Assuming the performance of the injector complex is limited by brightness [e.g. space charge] it would be interesting to reduce the beam emittance at constant brightness  50ns bunch operation attractive option to minimize total current and e-cloud (but: larger pile up in experiments!)

Summary Performance Reach for small  : 24Chamonix, January 2011 Oliver Brüning BE-ABP Injector performance when optimized for small  : -What is the smallest emittance we can generate for nominal and ultimate intensities at 25ns and 50ns?  MD studies Injector performance when optimized for  m or 3.75  m: -What is the maximum bunch intensity we can generate for a given normalized emittance at 25ns and 50ns?  MD studies (space charge limit in the SPS – measurements with low  -t lattice)

Other Potential Performance Limitations 25 electron cloud effects  vacuum & beam instabilities  cryogenic load (in the LHC)  bunch spacing (50ns)  beam scrubbing collective effects:  TMCI threshold of ppb (Q’ = 0)  coupled bunch limit might be smaller & for modified cleaning insertions UFOs  fill abort and overall efficiency  beam scrubbing? faults and overall efficiency:  average turnaround time (R2E)  statistics (Evian: ca. 25%) Chamonix, January 2011 Oliver Brüning BE-ABP

Spare Transparencies

LHC Challenges: Beam-Beam Interaction 27 LHC working point: n+m < 12 Q x = 64.31; Q y = total tune spread must be smaller than (SppS experience) keep  Q = for operation tolerances and coupling! bunch intensity limited by beam-beam force: QyQy QxQx 3 head-on/bunch   beam-beam <  N < head-on/bunch   beam-beam <  N < /10 1/31/7 Chamonix, January 2011 Oliver Brüning BE-ABP

What is SPS space charge limit at 26 GeV/c? 28/01/2011SPS lessons28 Single bunch data with nominal ( γ t =22.8) and “low γ t ” optics ( γ t =18) low γ t “Low γ t ” d ata scaled by 30% in intensity (for low V and losses) linear fit: ε= 1.4 (N/10 11 ) → space charge limit ∆Q sch ~ 0.13 (nominal LHC beam ∆Q =0.05) ▪ 450 GeV/c → preliminary results, accurate measurements in 2011

Assumptions on Injector Performance III: 29Chamonix, January 2011 Oliver Brüning BE-ABP Special filling scheme using 64 bunches per PS (SB!): [Christian Carli] -25ns: ppb;  n = 2.5  m (at exit PS)  nom. emittance in LHC? with 2688 bunches in the LHC -50ns: ppb;  n = 2.5  m (at exit PS) with 1344 bunches in the LHC

LHC following P1 & P5 (2021) (New cryoplants for ITs cooling) S5-6 S4-5 S6-7 S3-4 S2-3 S7-8 S1-2 S8-1 S6-7 S2-3 S7-8 S5-6 S4-5 S1-2 S8-1 S3-4

Summary of LHC Intensity Limits (7 TeV) 11/21/2015 LMC: R. Assmann Note: Some assumptions and conditions apply… Ideal scenario: no imperfections included! R. Assmann R. Chamonix 2010

L. Tavian, 2005 H. Maury Cuna, 2009 “ultimate” nominal spare cooling capacity for 0.55 m  * going above N b =1.7x10 11 & ultimate luminosity requires dedicated IR cryo plants; limit then becomes N b ~2.3x10 11 spare cooling capacity at zero luminosity (=total-SR -impedance) e-cloud heat load for SEY=1.3 cooling & e- heat for 25 ns spacing

(longer flat bunches) L. Tavian, 2005 H. Maury Cuna, 2009 spare cooling capacity for 0.25 m  * spare cooling capacity at zero luminosity (=total-SR -impedance) e-cloud heat load for SEY=1.5! going above N b =2.3x10 11 & ultimate luminosity requires dedicated IR cryo plants; limit then becomes N b ~5.0x10 11 cooling & e- heat for 50 ns spacing “LPA”

Options for maximizing luminosity at the beam-beam limit: 1) keep  * and N/  constant increase current at constant brightness  n >  m requires controlled  blow up at top energy 2) keep  n constant and increase N with 1/R (LPA)  1) and 2) imply larger than ultimate beam currents; 2) requires larger than ultimate brightness! 3) keep N constant and vary  as R (referred to as small emittance scheme)  requires smaller than nominal emittance  leveling via aperture or Crab Cavities 4) compensate R at IP and minimize  *  is compatible with ultimate beam parameters; requires Crab Cavities Operation at the Beam-Beam Limit 34 (for alternating crossing) Chamonix, January 2011 Oliver Brüning BE-ABP

LHC Challenges: Single Particle Stability 35 tune: Q = number of oscillations per revolution SppS experience:  working point must stay clear of resonances of order 10 or lower! resonances: n Q x + m Q y + r Q s = p; “order” = n+m+r QyQy QyQy QxQx QxQx Chamonix, January 2011 Oliver Brüning BE-ABP 1/10 1/31/71/11

Performance estimates in terms of  * : 36Chamonix, January 2011 Oliver Brüning BE-ABP HL LHC Upgrade: -  * of 0.15m accessible for round 7 TeV -  * of 0.3m / 0.075m accessible for flat 7 TeV Minimum  * at 3.5 TeV: -  * of 0.8m based on measured aperture and nominal settings -  * of < 2m accessible for measured aperture and emittance -  * = 1.1m based on nominal machine scaled by energy   * = 1.1m used as reference in the following Long range b-b can be alleviated by  * increase (‘soft landing’):  assume 10% larger  * as quoted for normal operation J. Gareyte S. Fartoukh

Summary Assumptions for Performance Estimates: 37Chamonix, January 2011 Oliver Brüning BE-ABP  * (optimistic estimates with 10% margin for beam-b): -  * of 1.5m for round beams with nom. 3.5 TeV -  * of 0.6m for round beams with nom. 7 TeV -  * of 0.2m for round beams with HL upgrade LHC limitations at 7 TeV operation: -Cooling power: ca. 1.4 A / beam -Cleaning inefficiency and impedance: lifetime? efficiency Beam-beam parameter of 0.02 to 0.03 accessible bunch intensity and brightness: -50ns:  n = 1.5  m to 2  m -50ns: to nominal emittance  n = 3.75  m -25ns: to < nominal emittance  n = 3.75  m

LHC Performance Estimates 38Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns N1.15E+111.2E+111.7E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h] IBS longitudinal [h] Piwinski parameter geom. reduction beam-beam / IP3.10E-033.1E-034.4E-036.6E-03 Peak Luminosity nominal emittancesmall emittance Performance reach for existing 7 TeV:

LHC Performance Estimates 39 Performance reach for existing machines + LINAC4: Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns N1.15E+111.4E+112.5E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m] 3.75  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h] IBS longitudinal [h] Piwinski parameter geom. reduction beam-beam / IP3.10E E-036.5E-03 Peak Luminosity nominal emittance

LHC Performance Estimates 40Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns 25ns 50ns N1.15E+112.0E+113.3E+112.0E E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E-02 IBS horizontal [h] IBS longitudinal [h] Piwinski parameter geom. reduction beam-beam / IP3.10E-034.5E-034.9E-037.7E-38.6E-3 Peak Luminosity small  *‘large’  * Performance reach for LINAC4 + LIU + HL triplet:

LHC Performance Estimates 41Chamonix, January 2011 Oliver Brüning BE-ABP Parameternominal 25ns50ns 25ns 50ns N1.15E+112.0E+113.3E+112.0E E+11 nbnb beam current [A] x-ing angle [  rad] beam separation [  ] 10  * [m]  n [  m]  L [eVs] energy spread1.00E-04 bunch length [m]7.50E IBS horizontal [h] IBS longitudinal [h]6121 Piwinski parameter geom. reduction beam-beam / IP3.10E-033.6E-034.9E-036.8E-37.6E-3 Peak Luminosity small  *‘large’  * Performance reach for LINAC4 + LIU + HL triplet: long bunch