POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March.

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

T RAVEL AND T RANSFER P OLICY Entitlements: Employees in managerial cadre while traveling on Companys business will be entitled to the benefits, as defined.
NHB RESIDEX- Status, Challenges and Way Forward Presentation on NEW DELHI MAY 31, 2013.
Network Solution for NER States. POWERGRID CORPORATION OF INDIA LIMITED incorporated in October, 1989 with a mandate to Interconnect Regional Power Grids.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
The Fiber Optic Association is the professional society of fiber optics. It was founded in 1995 by a dozen fiber optic professionals who felt fiber optics.
MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs.
Air Quality: Status And Classification Of Cities Based On Indicators 8 h December, 2004 at BAQ-2004, Agra T S Panwar & Sumit Sharma TERI, New Delhi.
Nature of Air Pollution in India Dr. Sarath Guttikunda.
Indian Software & Services : Key Ingredients for Success.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
CURRENT STATUS OF INSTITUTIONAL REPOSITORIES IN HIGHER EDUCATION IN INDIA WITH SPECIAL REFERENCE TO IITs, IIMs AND NITs Presented in 16 th National Convention.
Chapter Annual Sessions Patna Public Session on “Community Response to Disaster & Medical Emergency” 18 Jan 2014.
Consultancy by : Power Grid Corporation of India Ltd.
Www. lanestaff.com “Big Business Solutions…Small Business Flexibility”
Sales Incentives/ Commissions to match key drivers of sales
Discussion on “Udaan” A Special Industry Initiative (SII) for Jammu & Kashmir 2013.
Welcome to Roche. 2 The Roche Group: short overview Roche Diagnostics India Trainee Roche Diagnostics India Our people’s development and careers.
Market Intelligence for India The Second Largest Population in the World!
PRIVATE LABEL “STOP” Abhilasha paul Sunaina Jhakkar Puneet Khurana.
NORTHERN REGIONAL LOAD DISPATCH CENTER 12 th June 2004 Director DOE MD BPC Advisor DOE Royal Govt of Bhutan WELCOMES POWER GRID CORPORATION OF INDIA LTD.
W E L C O M E Power Grid Corporation of India Limited.
Power Grid Corporation of India Ltd.
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri N K Singh Member, Planning Commission At NORTHERN REGIONAL LOAD DISPATCH CENTER.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1 st June 2004 Shri P. M. Sayeed Hon’ble Minister of Power Govt. of India WELCOMES POWER GRID CORPORATION OF INDIA.
SRLDC 1 POWER SYSTEM OPERATION A FRESH PERSPECTIVE Power Grid Corporation of India Limited New Delhi, India.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri Brajesh Mishra Principal Secretary To Prime Minister At NORTHERN REGIONAL LOAD DISPATCH CENTER.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
India & Worldwide. About us TracXpress is a 3 rd party Domestic & International Parcel /Cargo and Freight services Company, which has been established.
Smart India-2020 :Are you ready?. Make in India.
Corporate Profile Ver: Jul 2008 globali.in. Global Group Enterprise $ 1.7 bn balance sheet size $ 601 mn Revenue $ 2 bn Market Cap* 21 Years of service.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
BSNL Broadband Customer Care Number Created By :
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
Foreign Trip Scheme on AMC & Service Charges Double Click on below Link.
To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
AskMe – Who are we? Launched on 1 st July 2014, AskMe is India’s pioneering “ONE STOP SME” Marketplace offering a unique combination of key digital businesses.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
MyCityFreelancer This is an initiative by MyCityNetwork (MCN India Inc.). The objective is to expand our network in major Indian cities by giving you that.
Hermes Global Presence. Hermes – A GI Retail Group Company About GI Retail Group – business interest in 3 verticals  Travel and Services Retail  Tech.
NATIONAL ELIGIBILITY ENTRANCE TEST 2016 PES Blog PES Facebook NEET PHASE 2
Adding Momentum to Movement.  Jalan Transolutions (India) Ltd., formerly known as Jalan Carriers Pvt. Ltd.,  We had started its progressive journey.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Send rakhi to Mumbai Rakhi gifts delivery in Mumbai
Send rakhi to Mumbai Rakhi gifts delivery in Mumbai
Welcome To Ieccodeonline.com
MyCityFreelancer This is an initiative by MyCityNetwork (MCN India Inc.). The objective is to expand our network in major Indian cities by giving you that.
Assessing the Finances of ULBs: A Cross-Sectional Study
100 SMART CITIES BY 2024.
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Welcome To Confidencial Detective Agency
Hi, Friends, say good evening to our Solar System
WELCOME TO DIRECTORATE OF FINANCE & ACCOUNTS
Q4 FY18 Investor Update.
Videocon -Stand VJW22/VJW24 VJW32HH-2FA VJU32HH-2FA
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Regional Connectivity Scheme Ministry of Civil Aviation
Presentation transcript:

POWER GRID CORPORATION OF INDIA LTD. W E L C O M E S Shri P. Shankar Chief Vigilance Commissioner At NORTHERN REGIONAL LOAD DISPATCH CENTER 25 th March 2004

Regional Grids Of India

Inter Regional Links  Present IR Capacity: 8,500 MW  To Go up to 30,000 MW By MW 500 MW1000 MW 500 MW 1200 MW

Functions Of RLDC  Apex Body For Integrated Grid Operation  Responsible for Optimum Scheduling and Dispatch of Electricity  Keep Accounts Of Electricity Transmitted Through Grid  Supervise and Control The Inter – State Transmission System  Ensure Security and Economy In Operation as per the Grid Standards and the Grid Code

RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 32 Nos. 51 Nos Nos. Unified Scheme – National Setup Plant/Sub Station Level Group of Distt. Level State HQ Level Region Level National Level 5 Nos.

Improvements by POWERGRID  Considerable Betterment of System Parameters viz., Frequency & Voltage in spite of Minimal Addition in ResourcesBetterment of System Parameters  Establishment of True Merit Order in Operation Leading to Economy At Country LevelTrue Merit Order  Introduction of modern State-of-the-art technology in grid operation by introduction of ULD & C Schemes.ULD & C Schemes  Introduction of tailor made commercial mechanism viz., ABT – Most suited to Indian peculiarities ABT  Better communication facilities  Transparency in grid operation and Paperless working at RLDCsPaperless working  Quantum leap in intra and Inter Regional Power TradingInter Regional Power Trading  Infused Grid Discipline

To utilize spare capacity of ULDC schemes and maximize return on its transmission infrastructure, POWERGRID decided to diversify into Telecom Through an incremental investment Telecom networks on Transmission Infrastructure Sturdy & secure rodent menace free vandalism proof Only utility in the country providing overhead fibre optic cable for telecom networks DWDM/SDH equipment deployed Scalable to Terabit Capacity Obtained IP-II license in Jan 2001 and ISP Category-A license in May 2003 POWERGRID ’ s DIVERSIFICATION INTO TELECOM

All India Fibre Optic Network of 20,000 kms, spread over 60 cities including all Metros & major cities Links under commercial operation Delhi-Lucknow -Mumbai Delhi-Ambala-Chandigarh-Shimla Delhi- Jaipur Mumbai-Ahmedabad Within NER Cochin-Bangalore Maintaining availability of 100% on overhead OFC network POWERGRID’s BROADBAND NETWORK POWERGRID ’ s DIVERSIFICATION INTO TELECOM

 Complete network to be in place by mid 2004  Hyderabad, Bangalore, Cochin Mar, 2004  JammuMar, 2004  Jallandhar Mar, 2004  Pune Mar, 2004  ChennaiApr, 2004  Allahabad, Kanpur, Agra May, 2004  Kolkatta, NER June 2004  Trivandrum June 2004 POWERGRID’s DIVERSIFICATION INTO TELECOM

Panipat Ambala Nasik Vadodra Udhampur NEW DELHI Lucknow KOLKATA MUMBAI HYDERABAD CHENNAI BANGALORE Dadri Moradabad Jabalpur Itarsi Indore Ahmedabad Nellore Ramagundam Chandrapur Bhilai Vindhyachal Kanpur Allahabad Chandigarh Shimla Jaipur Vijayawada Vishakapatnam Cuttack Jamshedpur Rourkela Pune Surat Raipur Mysore Madurai Trichy Salem Coimbatore Agra Ludhiana Jallandhar Jammu Varanasi Patna Nagpur Bhopal Kozikode Trichur Cochin Trivandrum Dhule Misa Agartala Shillong Imphal Kohima Tezpur Guwahat i Bhubaneswar Meerut Siliguri Link to Bhutan Alwar Khammam Bongaigaon Sasaram Durgapur Gurgaon Legend: Kishenpur Moga Gooty Jeypore Farakka Korba Hisar Bawana Hamirpur Kolar Udumalpet Kot a Links under operation Links under Implementation POWERGRID BROADBAND TELECOM NETWORK Pampore Srinagar Amritsar Gandhinagar Bhuj Itanagar Aizwal Pathankote Jodhpur Jaisalmer Ujjain Bikaner Pokharan Jamnagar Udaipur Ballabhgarh Biharsharif

OVERHEAD FIBRE OPTIC CABLE INSTALLATION OPGW ALUMINIUM TUBE ACSR STRANDS FIBRE POWERGRID ’ s DIVERSIFICATION INTO TELECOM

Customer Base NIC(GOI) ERNET(GOI) STPI(GOI) ESTEL(ISP) Fidelity (Call Centre) GLIDE(ISP) Bharti infotel (NLD) Bharti Cellular Airtel VSNL, (ILD/NLD) Data Access, (ILD) Daksh, (Call Centre) Convergy’s,(Call Centre) Spectranet (ISP) HCL Infinet (ISP) ExattNet(ISP) Hutchission Essar (Cellular)

Thank You

ULD & C PROJECT: OBJECTIVES To have To have Greater and deeper visibility of the power system under control Greater and deeper visibility of the power system under control Better communication and co-ordination between control centers Better communication and co-ordination between control centers Effective management of grid parameters viz. frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in better Effective management of grid parameters viz. frequency, voltage etc. and better grid security through various SCADA/EMS features resulting in better  Operations scheduling  Operations monitoring and control  Power system analysis A real time environment for dispatcher training A real time environment for dispatcher training

AVAILABILITY BASED TARIFF (A)CAPACITY CHARGE (B)ENERGY CHARGE (C)ADJUSTMENT FOR DEVIATIONS (U I CHARGE) Where (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % share (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)