LCG EGEE is a project funded by the European Union under contract IST-2003-508833 LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.

Slides:



Advertisements
Similar presentations
INFSO-RI Enabling Grids for E-sciencE EGEE and gLite Slides by: Erwin Laure EGEE Deputy Middleware Manager.
Advertisements

GLite Status Stephen Burke RAL GridPP 13 - Durham.
Andrew McNab - Manchester HEP - 24 May 2001 WorkGroup H: Software Support Both middleware and application support Installation tools and expertise Communication.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
GLite, the next generation middleware for Grid computing Oxana Smirnova (Lund/CERN) Nordic Grid Neighborhood Meeting Linköping, October 20, 2004 Uses material.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
INFSO-RI Enabling Grids for E-sciencE gLite Data Management Services - Overview Mike Mineter National e-Science Centre, Edinburgh.
INFSO-RI Enabling Grids for E-sciencE The US Federation Miron Livny Computer Sciences Department University of Wisconsin – Madison.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
LCG LCG Workshop – March Generic Middleware Services LCG Workshop March 2004 EGEE is proposed as a project funded by the European.
Security Area in GridPP2 4 Mar 2004 Security Area in GridPP2 “Proforma-2 posts” overview Deliverables – Local Access – Local Usage.
INFSO-RI Enabling Grids for E-sciencE Status and Plans of gLite Middleware Erwin Laure 4 th ARDA Workshop 7-8 March 2005.
EGEE is a project funded by the European Union under contract INFSO-RI Summary M-E Bégin & B. Jones EGEE Technical Coordination All Activity Meeting,
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
David Adams ATLAS ADA, ARDA and PPDG David Adams BNL June 28, 2004 PPDG Collaboration Meeting Williams Bay, Wisconsin.
LCG LHC Computing Grid Project – LCG CERN – European Organisation for Nuclear Research Geneva, Switzerland LCG LHCC Comprehensive.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
JRA1 Middleware Frédéric Hemmer on behalf of Alberto Aimar, Maite Barroso, Predrag Buncic, Alberto Di Meglio, Steve Fisher, Leanne Guy, Peter Kunszt, Erwin.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST Middleware Planning for LCG/EGEE Bob Jones EGEE Technical Director e-Science.
GLite – An Outsider’s View Stephen Burke RAL. January 31 st 2005gLite overview Introduction A personal view of the current situation –Asked to be provocative!
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
EGEE is a project funded by the European Union under contract IST EGEE Middleware Frédéri c Hemmer GridPP 10 Meeting, 4 th June
EGEE is a project funded by the European Union under contract IST Tools survey status, first experiences with the prototype Diana Bosio EGEE.
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
INFSO-RI Enabling Grids for E-sciencE gLite Data Management and Interoperability Peter Kunszt (JRA1 DM Cluster) 2 nd EGEE Conference,
LCG ARDA status Massimo Lamanna 1 ARDA in a nutshell ARDA is an LCG project whose main activity is to enable LHC analysis on the grid ARDA is coherently.
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
JRA1 Middleware Frédéric Hemmer on behalf of Alberto Aimar, Maite Barroso, Predrag Buncic, Alberto Di Meglio, Steve Fisher, Leanne Guy, Peter Kunszt, Erwin.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
LCG LCG Workshop – March 23-24, Middleware Development within the EGEE Project LCG Workshop CERN March 2004 Frédéric Hemmer.
EGEE is a project funded by the European Union under contract IST Grid Access Service Predrag Buncic JRA1 Meeting, Jun
INFSO-RI Enabling Grids for E-sciencE The gLite File Transfer Service: Middleware Lessons Learned form Service Challenges Paolo.
Enabling Grids for E-sciencE gLite for ATLAS Production Simone Campana, CERN/INFN ATLAS production meeting May 2, 2005.
WP3 Information and Monitoring Rob Byrom / WP3
INFSO-RI Enabling Grids for E-sciencE gLite Middleware Status Frédéric Hemmer, JRA1 Manager, CERN On behalf of JRA1.
EGEE is a project funded by the European Union under contract INFSO-RI Middleware for the next Generation Grid Infrastructure Erwin Laure EGEE Deputy.
Data Transfer Service Challenge Infrastructure Ian Bird GDB 12 th January 2005.
David Adams ATLAS ATLAS-ARDA strategy and priorities David Adams BNL October 21, 2004 ARDA Workshop.
EGEE is a project funded by the European Union under contract IST Package Manager Predrag Buncic JRA1 ARDA 21/10/04
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Last update: 03/03/ :37 LCG Grid Technology Area Quarterly Status & Progress Report SC2 February 6, 2004.
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
EGEE is a project funded by the European Union under contract IST End-user requirements for network monitoring Paul Mealor JRA4 EGEE Kick-Off.
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
JRA1 Testing Current Status Leanne Guy Testing Coordination Meeting, 13 th September 2004 EGEE is a project funded by the European.
JRA1 Activity Feedback Frédéric Hemmer EGEE Middleware Manager and the JRA1 team EGEE is a project funded by the European Union under contract IST
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
GridPP2 Data Management work area J Jensen / RAL GridPP2 Data Management Work Area – Part 2 Mass storage & local storage mgmt J Jensen
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
EGEE is a project funded by the European Union under contract IST Issues from current Experience SA1 Feedback to JRA1 A. Pacheco PIC Barcelona.
EGEE is a project funded by the European Union under contract IST Report from the PTF Fabrizio Pacini Datamat S.p.a. Milan, IT-CZ JRA1 meeting,
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
EGEE Middleware Activities Overview
JRA1 (Middleware) Overview
Current status of gLite
LCG middleware and LHC experiments ARDA project
Presentation transcript:

LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer

LCG LCG PEB – June 7, Work done so far Design team  Middleware providers from AliEn, EDG, VDT, … Discusses components and how they need to be adapted to fit in the prototype  Meetings so far December 3-4, 2003 –Workload Management System, CE ARDA Workshop January 21-22, 2004 –Setting up ARDA project February 24-27, 2004 –File catalogs, replica management, SE March 24-April 1, 2004 –Information system, Security, Interfacing with Ganga April –EGEE kickoff conference May –Service discovery, Security in Data Management, Job submission June –Installation & configuration, Catalogs & security Early version of prototype delivered on May 18, 2004  Regular meetings on prototype status Planning available at Testbed status available at

LCG LCG PEB – June 7, Prototype Status A Prototype Middleware on a testbed consisting of  AliEn “shell”  Job submission: Alien CE->Condor-G->blaph->PBS/Condor Globus Gatekeeper  Data Management AliEn File catalog –Soapification of the FC Castor & D-Cache SE with SRM gridFTP for transfers AliEn FTD Aiod/GFal investigations RLS (EDG) –Perl RLS Soap interface for File Catalog integration –Not used yet  Security VOMS for certificate handling/SE gridmap files (NIKHEF) MyProxy for certificate delegation in GAS  GAS (Grid Access Service) Prototype with a few file cataloging functions  R-GMA With new API; not integrated yet

LCG LCG PEB – June 7, Other work related to the prototype Working Middleware document Draft Software Configuration & Management Plan Draft Software Release Plan Draft Architecture Document Defect Tracking System  Savannah: CVS repository:

LCG LCG PEB – June 7, Next Steps Exercise interface with ARDA  Introduction organized on May 18, 2004  Mailing list at project-egee-middleware-integration-support [ AT ] cern [ DOT] ch  Workshop on June 21-23, 2004  EGEE Applications/Middleware meeting on July 14-16, 2004 Integration of EDG WMS  Allowing push, pull or a mixture Integration of R-GMA  To be used for Service Discovery Data Management Security  ACL’s  Investigations of Stork As a data scheduling Service Replacement for FTD ? “Componentize” Discussions going on with ANL & ISI  GRAM with “setuid” services  ISI RLS with GUID’s Prototype to use Integration & Testing processes  Nightly builds; Savannah Portal/CVS repositories  Software Configuration Management plans; SPI tools Continue Software Process  Design Team->Prototype->ARDA (& others)->Design Team ….  Document API, Interfaces (WDSL), semantics, etc..

LCG LCG PEB – June 7, Resources (JRA1 Overall)

LCG LCG PEB – June 7, Resources (Prototype/Design) Estimates (April/May) Note: testing & Integration work on the “prototype”, but not on the actual setup and day to day running Note: As components are added, these numbers will increase

LCG LCG PEB – June 7, Open Issues Some services were not foreseen in the TA, and therefore do not fit well with the current organization  E.g. GAS; asynchronous communication  Prototype testbed system administration  People really stretched in providing promised formal deliverables as well as the prototype IT/CZ cluster does not seem to have enough effort available to provide prototype components early enough  Current draft release plan only foresee components in September and November

LCG LCG PEB – June 7, Summary Although some issues exist, a first version of the Middleware prototype is available  As a starting point and a vehicle to define the EGEE Middleware  Composed of existing software/components (as far as possible)  To be used to agree on components and priorities with Applications (HEP, Bio) and Operations  To be used to try out components provided by the different partners  Some components will come, some other will go.  With rapid release cycles (1-2 months) Now expecting to get feedback from ARDA within next weeks  Closing the loop with the Design Team