Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.

Slides:



Advertisements
Similar presentations
Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Madrid, 1 st April 2008 Offering of capacities under the OSP.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
29th November 2016 Teleconference
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Enagás, GRTgaz, Reganosa, REN and TIGF
26th IG meeting 23th January 2014
Results of the First Phase of the OS 11th IG meeting
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
26th February 2015 Teleconference
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
24th January 2017 Teleconference
29th November 2016 Teleconference
26th February 2015 Teleconference
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain

2 Background  ENAGÁS and TIGF have committed to put in operation by 2009 new capacities in both directions at the cross border point of Larrau, and have agreed ERGEG’s South GRI proposal of evaluating shipper’s interest in existing (non-allocated) capacities and in new capacities at this point, and to allocate the referred capacities through an Open Subscription Period (OSP), which will take from  The competent regulatory authorities in both countries have committed to adapt the regulatory framework in force in order to allow the proposed OSPs to take place under the general principles agreed between the TSO and regulators.  The object of this document is to announce to the market the intention to hold a OSP in 2008 to allocate capacities from 1st November 2009 to 31st March 2013, and the basic rules under which the OSPs will be conducted.

3 Main updates of the previous documents 1.Review of “sample capacities to be offered”. 2.Setting of same ending date for capacity in both directions (31/03/2013). 3.Review of allocation rules. 4.Tentative calendar of OSPs. 5.Other comments.

4 1. Technical capacities  The table of capacities to be offered under the OSP have been modified taking into account:  The update of the analysis on technical capacities made by TIGF and Enagás in January 2008 and presented in the 6 th Implementation Group of the SGRI on 11 th February  Last available date on booked capacities. Due to new requests for long- term capacity, the capacity available for the OSP from France to Spain has been reduced, and there will be no capacity available until November This might have an impact on the timing of the OSP. Capacities might be subject to revision, depending on availability and the progress of the works of the new facilities. The capacities offered under each OSP will be published in each OSP procedure, and it will be detailed whether they are subject to any restriction.

5 1. Committed infrastructure and capacity added 6th Implementation Group of the SGRI on 11th February 2008

6 ENAGAS -> TIGF (*) In April GWh/day are booked, whereas the capacity booked from May 2009 to October 2009 amounts to 11.98GWh/day. (**) Short term capacities from 1st November 2009 will be sold yearly, in later OSPs, performed a year before their starting day. E.g. STC from 1st November 2009 to 31st October 2010 will be offered during the OSP to be hold in Sample capacities to be offered (I)

7 TIGF -> ENAGAS (**) Short term capacities from 1st November 2009 will be sold yearly, in later OSPs, performed a year before their starting day. E.g. STC from 1st November 2009 to 31st October 2010 will be offered during the OSP to be hold in (***) “Booked capacity” does not include capacity requested but not yet subscribed. 1. Sample capacities to be offered (I)

8 2. OSP ending dates (I)  TIGF and ENAGÁS strongly support the modification included by the CRE and the CNE to establish the same ending date for the capacity services allocated under the OSP in both directions (31/03/2013).  ENAGÁS, TIGF and GRTgaz have already started contacts to settle the basis of the OS(s) to build and allocate new interconnection capacity between their systems. An issue raised during these preliminary contacts has been that a number of OSPs and OSs are planned during the next few years between and within the systems of these TSOs and, in order to facilitate a better coordination between them where possible, it would be desirable to fix the same ending date for capacity services in both directions (France > Spain and Spain > France ) in this OSP.

9 2. OSP ending dates (II)  A preliminary analysis, taking into account the estimated dates for entering into operation of certain infrastructures, suggests that the ending date for the OSP between ENAGÁS and TIGF systems should be around late 2012 or early This might prevent holding two different OSs in the future to build and allocate new capacity, simplifying the coordination between TSOs, and might also facilitate the coordination with other OSPs and OSs.  Therefore, in the context of the proposed OSP, ENAGÁS and TIGF agree with the CRE and the CNE to establish a common ending date for the capacity services to be allocated under the proposed OSP in both directions, which could be 31/03/2013. This would allow allocating capacity services under the potential OS under study from 01/04/2013, in coordination with the subsequent OSP between ENAGÁS and TIGF, and possibly in coordination with other OSPs/OSs in within France.

10 3. Allocation rules

11 4. Tentative calendar of OSPs (I)  TIGF and ENAGÁS propose to:  shorten the period between the allocation of short-term capacity and the starting date of the service, in order to allow shippers to better estimate their needs and therefore to encourage requests from shippers.  allow shippers to make their requests for STC once the LTC has been allocated. STC is frequently a way to meet flexibility needs for shippers with capacity already contracted on a long- term basis.  Given that there will no be capacity available until November 2009, TIGF and ENAGÁS recommend not to allocate STC in the OSP to be hold in It would be advisable to wait until the OSP to be hold in 2009 for the allocation of STC (it is proposed to hold OSPs in spring each year from 2009 on).

12 4. Tentative calendar of OSPs (II)

13 4. Tentative calendar of OSPs (III) Tentative calendar of OSPs to allocate STC in the future

14 4. Calendar of future OSPs

15 5. Other comments  The current proposal, as the former ones, includes the allocation of LTC from Spain to France. However, this capacity will only be available from April Given that the capacity will be offered two years and a half in advance, and for a period of two years, TIGF and ENAGÁS doubt that shippers will be interested in making any commitment to book this capacity in  Whether this capacity will or not be offered in a future OSP must be clarified before the OSP takes place. Otherwise, it will be only possible to offer the referred capacity on a first-come, first-served basis after the first OSP.).

Thank you for your attention