A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.

Slides:



Advertisements
Similar presentations
TSD A STRATEGY FOR DESIGN, ENGINEERING & ADVANCED MANUFACTURING.
Advertisements

TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
Sarah Kendrew Leiden Instrumentation Group.  One of eight potential instruments for the European ELT, the largest planned optical/IR telescope for the.
E-ELT VLT HARMONI – the first light integral field spectrograph for the E-ELT Niranjan Thatte On behalf of the HARMONI consortium Florence - 29 June 2013.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
The ELT-MOS (MOSAIC) White Paper Mathieu Puech. ELT-MOS Requirements Workshop in Amsterdam Assembled a science team New science simulations ELT-MOS White.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Association for the Education of Adults EAEA European AE Research – Look towards the future ERDI General Assembly, 2004.
PSWG March Adaptive Optics Systems Engineering on GMT Peter McGregor.
NGNS Program Managers Richard Carlson Thomas Ndousse ASCAC meeting 11/21/2014 Next Generation Networking for Science Program Update.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Plan to develop system requirements through science cases Claire Max Sept 14, 2006 NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
The New EU Framework Programme for Research and Innovation EXCELLENT SCIENCE HORIZON 2020 Peter Fisch DG RTD A.5.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
AO proposal for FP7 June 2006, N. Hubin Proposal for a European Adaptive Optics Program to be funded in the frame of FP7 N. Hubin European Southern Observatory.
T-REX OU4 HIRES The high resolution spectrograph for E-ELT E. Oliva, T-REX meeting, Sexten Pustertal (I)1.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
Living with Climate Change Systemic investigation of climate change impacts on our society and efficient adaptation / mitigation scenarios to sustain our.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation How can networking in Science and Technology help SMEs.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Edimburg June 2006 Fast detectors 1 Fast detectors (for E-ELT AO) Philippe Feautrier INSU/CNRS-LAOG.
Ch. 5: Project Planning Good Quote: Plans are only good intentions unless they immediately degenerate into hard work Lame excuses for not planning: Takes.
European Extremely Large Telescope - Status April ESO.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
1 A. Boccaletti Pasadena, Sept th Imaging EGPs with JWST/MIRI and VLT/SPHERE valuable experiences for TPF-C A. Boccaletti, P. Baudoz D. Rouan + coronagraphic.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Building the Europe of Knowledge Proposals for the 7 th Research Framework Programme
2 nd convergence workshop: introduction R. T. Schilizzi Penticton 22 July 2004.
Status and achievements of Opticon FP6 (+FP5) Gerry Gilmore coordinator.
K. G. Strassmeier, Polarimetry with ELTs, Utrecht, Nov./Dec Smart Focal Plane Spectropolarimetry with the E-ELT Klaus G. Strassmeier, Leibniz-Institute.
Proposed Joint Research Activity: Technologies for Advanced Instrumentation Colin Cunningham.
Information Society and Media Directorate-General Unit Grid Technologies NCP Info Day Call5 - Brussels, 02 June – Advanced Grid Technologies,
EU Projects – FP7 Workshop 6: EU Funding –What’s Next? Carolina Fernandes Innovation & Funding Manager GLE Group.
OWL Concept Design Review Report to ESO Council 8 th Dec 2005.
Introduction of RAVEN Internal meeting on future instrument projects at Subaru Shin Oya ( Subaru Telescope/NAOJ) ‏ Hilo.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
MANISH GUPTA. Presentation Outline Introduction Motivation Content Expected Impact Funding Schemes & Budget.
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Pre-focal wave front correction and field stabilization for the E-ELT
The Self-Coherent Camera: a focal plane wavefront sensor for EPICS
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Information Society and Media Directorate-General – European Commission Unit Grid Technologies IST-Call 5 Grid Information Day - Brussels, 30 May 2005.
GOES-R Series User Readiness Planning and Development May 12, 2004.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
The ESA call for the 9 th Earth Explorer mission (EE9)
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
An IFU slicer spectrometer for SNAP
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Presentation transcript:

A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG

FP7 “The construction of an Extremely Large Telescope on a competitive time scale will be addressed by radical strategic planning…” (Council resolution)  Calls for a schedule compatible with other projects, TMT, GMT, ALMA, JWST, etc. –Assume 2016  Calls for forefront instrumentation –Key to science, e.g. the VLT success Reverse schedule: FP7 ( ) in parallel with the instrument study No time left for generic studies for the first generation instruments  First / Main instruments need to be started NOW (2-4 years of demonstration) ELT Instruments: timeline

A key word: demonstration Some concepts for workhorse ELT instruments remain to be demonstrated –E.g. MOAO, XAO instruments Demonstration requires focused and integrated studies at system level –Science Top Level Requirements, Simulations, Simulators, Data Reduction, etc. –Adaptive Optics TLRs, Simulations feeding science, AO system analysis, tests on existing systems, etc. –Instrumentation TLRs, concepts, interfaces with AO, at least 2 prototyping cycles, etc. –System Putting it all together, budgets, etc. –Demonstrators, either in lab (e.g. AO benches) or on-sky (e.g. VLT) Synergy with transverse AO developments –Requirements –Interfaces Synergy with telescope developments –Interfaces: focal plane, f ratio, back focal distance, platforms, ADCs, field of view (scientific & technical), LGS, etc.

A key word: demonstration Demonstration by: –Study (simulations, concepts, etc.) –Prototypes –Demonstrators (benches, on-sky, etc.) Demonstrations on existing infrastructures (e.g. VLT) for the next infrastructures –Develop new demonstrators in lab or on sky –Use existing or planned instruments as demonstrators (e.g. SPHERE) Structuring activity –Teams with various competence, etc –Access to lab, possibly sky, demonstrators –Networks highly desirable, e.g. for the science activities FP7: ideal for the demonstration phase – until instrument FDR (~ 2012) –JRAs, networks, access (to demonstrators)

Examples WFSPEC, MOMFIS etc. –‘High-z’ and mass assembly of galaxies Complex To be demonstrated (MOAO) Major interface aspects with telescope and AO, etc.

Examples MOMFIS WFSPEC WBS for the Instrument study Demonstrators

Example: MOMFIS / WFSPEC demonstration Potential Participants: F, UK, I, tbd. Timescale: for the bulk of the activities Cost: ~ 8 M€ all inclusive (included in N. Hubin’s presentation) Deliverables: reports, conceptual studies, several prototypes (hw & sw), Demonstrators (1 bench, 1 VLT) Industrial dimension: interest in short term applied R&D EU dimension: use of existing infrastructures, demonstration for future infrastructures, structuring activity, synergy with ELT Design Study

EPICS A Planet Finder instrument for the European ELT (slides from J.-L. Beuzit)

EPICS Design philosophy General approach -> Integrated concept  Science-driven: detection of exoplanets  Very detailed system analysis  Lessons learned from SPHERE on VLT (as demonstrator)  Globally optimized instrument (AO, corono, focal WFS control, observing modes)  Open concept, explore several options (corono, IFS...)  Settle on well-established competences distributed in the XAO community  Extensive simulations -> end-to-end model  Prototyping, validations, test benches, demosntrator

EPICS Design Strategy Spatially Filtered SH Advanced PYR Experiments Simulations FP6 Point design Simulations experiments EPICS System Dimensioning Prototypes Conceptual & Preliminary Design Reviews HOT extension Aggressive Calibration & Post-processing Active suppression of Systematic speckles Theory SPHERE feedback

Conclusions FP7 to support the design phase of E-ELT instruments in period (JRAs, network & access) Global approach to instrument developments highly desirable –Better focus, better synergy –Allows smaller (integrated) teams –Higher efficiency, faster Structuring activity Not exclusive of transverse / generic activities –Activities in essence transverse, e.g. detectors, etc. –Upfront activities with longer development timescales Synergy with ELT DS –Instrumentation currently severely under funded Which call ? Preparatory phase or I3 ?