ILC Beam Delivery System / MDI Issues for LCC-phase (~<2016) Glen White, SLAC May 14 2014 AWLC14, Fermilab.

Slides:



Advertisements
Similar presentations
4.1/9.1m L* Optics & Performance Glen White, SLAC SiD Meeting, SLAC Jan 13, 2015.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
BDS Change Request: Support of Single L* Optics Configuration Shared by both Detectors Glen White, Nick Walker Sept MDI/CFS Ichinoseki.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Risk Issues American Linear Collider Physics Meeting SLAC January 8 th, 2004.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
ML / RTML WG Summary N.Solyak, K.Kubo, A.Latina AWLC 2014 – Fermilab – May 16, 2014.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
ILC Start-End Simulations Glen White, SLAC May 13, 2014 AWLC14, Fermilab.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Alternative ILC Bunch Compressor 7 th Nov KNU (Kyungpook National Univ.) Eun-San Kim.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
May 31, 2005Mike Hildreth – ATF 2005 Energy Spectrometry and ATF Components of the nano-BPM Test Program and Plans for Future Tests Mike Hildreth University.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
Luminosity Issues for LC BDS Glen White, SLAC LCWS2013, Tokyo November 12, 2013.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
Wakefield effect in ATF2 Kiyoshi Kubo
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
CLIC Study Aim Conceptual design report in 2010
CLIC-ILC BDS & MDI work.
AD & I : BDS Lattice Design Changes
ILC Baseline BDS Collimation Depth Calculations
Beam Delivery System Schedule at ILC2010
CLIC damping rings working plan towards the CDR
Update on MEIC Nonlinear Dynamics Work
Status and plans for crab crossing studies at JLEIC
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Crab Crossing Named #1 common technical risk (p. 6 of the report)
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

ILC Beam Delivery System / MDI Issues for LCC-phase (~<2016) Glen White, SLAC May AWLC14, Fermilab

BDS Cost Drivers “Tunnel length” and major infrastructure changes likely to be small BDS tuning “Value Engineering” – Emittance -> luminosity – Understand tradeoffs between design choices and impact on time required to deliver required luminosity – FFS complex, non-linear system. Mechanism of tuning system important.

Critical Issues Lattice design / optics (Thursday BDS sessions) – All lattices -> “complete” status for TDR baseline (250, 350, 500 GeV cm) both IR’s, (“no-detector” IR?), EXT, tune-up/abort lines e+ source (lengths correct w.r.t. timing) : BDS responsibility? linac->BDS transition – FFS optics properly matched and tuned for all configurations – Optics designs for low energy running 10 Hz specific items : bypass-lines? – Optimal BETA*? Balance between horizontal and vertical for given luminosity (-> beam dynamics/ tolerance studies) Determine largest practical L* configuration

Critical Issues Beam dynamics (BDS/Linac S2E session Tuesday) – Update dynamic tuning simulations (in S2E context) Evaluate credible luminosity delivery: folding in all error sources and countermeasures – Provide well-motivated and complete list of tolerances Magnet field accuracy, Multipoles, apertures, component alignment, mover capabilities, PS requirements Jitter tolerances – Crossing angle Smaller? Larger? Try to quantify risk from beam dynamics perspective – Specify incoming beam dynamics tolerances to accept from linac – Review vacuum requirements – Evaluate impact of having 2 different L* optics – Review of diagnostics/technical systems BPM resolution requirements? Where are movers really needed?

Critical Issues Collimation systems & backgrounds : re-evaluate – LW photon detection – Muon shielding requirements Demonstration of SC FD prototype (vibration tests) CF / BDS tunnel layout, equipment distribution, central region integration, MDI issues – load distributions – service tunnel – high-power dump enclosures – Muon shielding – Detector hall layout – Crab cavity integration (cryogenics) – SC Octupole cryogenetics – push-pull logistics

Less Critical Issues & Beyond Baseline Lattice design / optics – “Traditional” vs. baseline FFS Evaluate tuning efficiency – tail-folding octupoles – Phase-control of FFS Adequate number of matching quadrupoles? – Profile measurement at FFS IP-image point Split QF7 Additional LW infrastructure / technology Beam dynamics – Wakefield sources : specify complete list collimators beam pipes, transitions, ports, chambers, flanges etc BPMs – Capability to correct momentum dispersion within BDS Tweaker quads/skew-quads in chicanes? Commissioning (see joint BDS/MDI/CFS commissioning session) – Consider ability to diagnose fault conditions – Special IR “no-detector” configuration Need QD0 installation infrastructure? AUX FD quad/split QF1? Additional IP-based BPMs/profile monitor(s)?