Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Costas N. Georghiades Alireza Shapoury PS ERC PSerc Review Meeting Texas A&M University.

Slides:



Advertisements
Similar presentations
An approach to the problem of optimizing channel parameters March 2001 Vlad Oleynik, Umbrella Technology Slide 1 doc.: IEEE /152 Submission.
Advertisements

Tri-Band RF Transceivers for Dynamic Spectrum Access By Nishant Kumar and Yu-Dong Yao.
F ACULTY OF C OMPUTER S CIENCE & E NGINEERING Chapter 03. Spread Spectrum Technologies.
Powerline Communications: Channel Characterization and Modem Design Yangpo Gao Helsinki University of Technology
Sattam Al-Sahli – Emad Al-Hemyari –
Optimization of pilot Locations in Adaptive M-PSK Modulation in a Rayleigh Fading Channel Khaled Almustafa Information System Prince Sultan University.
Quality Management System
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
King Fahd University of Petroleum and Minerals EE- 400 Communication Networks Wireless Industrial Networks (Wireless HART) Prepared For Dr. Samir Ghadhban.
Cross Strait Quad-Regional Radio Science and Wireless Technology Conference, Vol. 2, p.p. 980 – 984, July 2011 Cross Strait Quad-Regional Radio Science.
Multi-beam Patch Antenna Design Mustafa Konca Supervisor: Prof. Dr. Sener Uysal.
WCBI Team Information Team number: Client: Faculty Advisors: Technical Advisors: Team Members: May02-11 Square D Company (Greg Wiese) Glenn Hillesland.
C OLUMBIA U NIVERSITY Lightwave Research Laboratory Embedding Real-Time Substrate Measurements for Cross-Layer Communications Caroline Lai, Franz Fidler,
Radio Interference Calculations
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
10th International PhD Workshop on Systems and Control
COGNITIVE RADIO FOR NEXT-GENERATION WIRELESS NETWORKS: AN APPROACH TO OPPORTUNISTIC CHANNEL SELECTION IN IEEE BASED WIRELESS MESH Dusit Niyato,
College of Engineering Resource Management in Wireless Networks Anurag Arepally Major Adviser : Dr. Robert Akl Department of Computer Science and Engineering.
Chapter 11: Wireless LANs Business Data Communications, 6e.
A Comparative Analysis of Spectrum Alternatives for WiMAX Networks with Deployment Scenarios Based on the U.S. 700 MHz Band June 2008 By MWG/AWG.
1 Secure Cooperative MIMO Communications Under Active Compromised Nodes Liang Hong, McKenzie McNeal III, Wei Chen College of Engineering, Technology, and.
Control Over WirelessHART Network S. Han, X. Zhu, Al Mok University of Texas at Austin M. Nixon, T. Blevins, D. Chen Emerson Process Management.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Software System Engineering: A tutorial
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
CWNA Guide to Wireless LANs, Second Edition Chapter Four IEEE Physical Layer Standards.
1 The Leader in Industrial Data Communication Solutions Training: Wireless Introduction.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
CWNA Guide to Wireless LANs, Second Edition Chapter Four IEEE Physical Layer Standards.
D1.HGE.CL7.01 D1.HGA.CL6.08 Slide 1. Introduction Design, prepare and present reports  Classroom schedule  Trainer contact details  Assessments  Resources:
 Leaf test codes are secure sine they would not be jammed by jammers.  When few normal users are present, many leaf code tests are wasted since absent.
A Survey of Spectrum Sensing Algorithm for Cognitive Radio Applications YaGun Wu netlab.
Spectrum Management 2002 Marc Goldburg CTO, Internet Products Group ArrayComm, Inc. Adaptive Antennas (or “doing more with less”)
PS ERC 1 T&D Technology Research Stem Highlights of T&D Stem Activity ( ) Mladen Kezunovic Former Stem Leader IAB Meeting Madison, June 1, 2006.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
ECE 4710: Lecture #27 1 QPSK & MPSK  QPSK and MPSK  if baseband m(t) is rectangular pulse then envelope of RF signal is  constant (excluding bit transitions)
1 WP2: Communication Links and Networking Mihael Mohorčič Torino, December 2003.
PS ERC New Pserc Projects Mladen Kezunovic. PS ERC Newly approved projects "...Enhanced Reliability..." Kezunovic "...Automated Integration..." McCalley.
CWNA Guide to Wireless LANs, Second Edition Chapter Four IEEE Physical Layer Standards Modified.
Information Technology Needs and Trends in the Electric Power Business Mladen Kezunovic Texas A&M University PS ERC Industrial Advisory Board Meeting December.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Bluetooth Techniques Chapter 15. Overview of Bluetooth Initially developed by Swedish mobile phone maker in 1994 to let laptop computers make calls over.
PS ERC Transmission and Distribution Technology Research Stem Meeting #10 Committee Meeting Mount Hood, August 15-18, 2002.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
BLUETOOTH TECHNOLOGY Coexistence Of Bluetooth And Wi-Fi
Syed Hassan Ahmed Syed Hassan Ahmed, Safdar H. Bouk, Nadeem Javaid, and Iwao Sasase RIU Islamabad. IMNIC’12, RIU Islamabad.
Safety Motion Detector Final Presentation Senior Design I December 1, 2011.
January 2013 Action Plan Skills Building: Module 4 Implementing and Evaluating the Action Plan.
Internship Report Adrian urcanu Third Consortium Meeting.
Doc.: IEEE /1229r1 Submission November 2009 Alexander Maltsev, IntelSlide 1 Application of 60 GHz Channel Models for Comparison of TGad Proposals.
Mobile Broadband Strategy Update RadComms 2014 Chris Hose Executive Manager, Spectrum Planning and Engineering.
Combined Human, Antenna Orientation in Elevation Direction and Ground Effect on RSSI in Wireless Sensor Networks Syed Hassan Ahmed, Safdar H. Bouk, Nadeem.
Substation Data Integration & Information Exchange Advisor: Dr. Mladen Kezunovic Student: Sasa Jakovljevic Texas A&M University, Department of Electrical.
Doc.: IEEE /00144r0 Submission 3/01 Nada Golmie, NISTSlide 1 IEEE P Working Group for Wireless Personal Area Networks Dialog with FCC Nada.
Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Alireza Shapoury PS ERC PSerc Meeting Texas A&M University College Station November,
The Softest Handoff Design Using Iterative Decoding (Turbo Coding) Byung K. Yi LGIC 3GPP2 TSG-C WG 3 Physical Layer Jan. 11, 2000.
Power System Monitoring Using Wireless Substation and System- Wide Communications Mobile Agent Part Mladen Kezunovic (P.I.) Xiangjun Xu Texas A&M University.
1 Spectrum Co-existence of IEEE b and a Networks using the CSCC Etiquette Protocol Xiangpeng Jing and Dipankar Raychaudhuri, WINLAB Rutgers.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
PS ERC EC Meeting Systems Stem New Research Initiatives.
Power Quality at Solar Distributed Generation Facilities
Sandis Spolitis, Inna Kurbatska, Vjaceslavs Bobrovs
PSerc TAMU Site Meeting
PSerc TAMU Site Meeting
March 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Harmonization of The 15.4g Mandatory Data.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
I-Kang Fu, Paul Cheng, MediaTek
Enhanced State Estimation by Advanced Substation Monitoring
Presentation transcript:

Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Costas N. Georghiades Alireza Shapoury PS ERC PSerc Review Meeting Texas A&M University College Station College Station, March 22, 2002

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station2 OUTLINE  Part I Summary Report  Part IITechnical Report  Conclusions

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station3 OUTLINE OF PART I  Introduction  Project Background and Brief History  Recent Activities  Statement of Work  Activity Schedule  Project Status

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station4 Introduction Defining the Most Appropriate Wireless Strategy for Substation Environment A Continuation of the Previous Reports Presented Earlier to the PSERC Industry Advisors Covering Activities in the period December March 2002

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station5 ISM (Industrial,Scientific and Medical) band Wide Usage License-free Higher RF Power If Spread Spectrum Substation Monitoring Applications Cost-effective Communication Point of Concern:Specific Environment of Substation Project Background and Brief History

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station6 Theoretical analysis and technical observations Core Spread Spectrum Techniques FHSS DSSS Field measurement FreeWave Modems Diagnostic Software (Setup Plan) Identifying system characteristics Recent Activities

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station7 TASK 1. Feasibility study and planning TASK 2. Theoretical analysis and technical observations TASK 3. Field measurement TASK 4. Identifying characteristics of a reliable system TASK 5. Special concerns TASK 6. Finalizing the results, Documentation Statement Of Work

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station8 Activity Schedule

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station9 Identification of the Necessary Devices for Measurement (Accomplished) Measurement Setup Plan (Accomplished) Theoretical Development (In Progress) Field Measurement (In Progress) The Project Follows the Specified Task Schedule Project Status

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station10 OUTLINE OF PART II  Introduction  Theoretical Analysis and Technical Observations  Field Measurement  Identifying Characteristics of a Reliable System  Conclusion

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station11 Use real-time and off-line data for better circuit breaker maintenance management Utilize new technologies of wireless communications and mobile agents As an example, improve efficiency of circuit breaker maintenance assessment Demonstrate the benefits of new communication and software technologies using utility maintenance management scenarios Introduction

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station12 Impulsive noises and EMI Impact On Wireless Channel Noise Sources In Substations Review of The Noise Impact On Spread Spectrum Schemes Crude Comparison Of DSSS And FHSS Worst-case Analysis Worst-case happens under different noise profiles for DSSS and FHSS Theoretical Analysis and Technical Observations

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station13 DSSS indicates approximately 5dB superior to that of FHSS under worst-case noise profile of their own Assessment of the likelihood of the Worst-case situations necessitates measurement

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station14  Devices, Configuration and Operation Modes  Measuring Statistics Average Noise Power Average Signal Power Average Packet Error Temperature  Investigating Practical Issues (E.g. Antenna Type and Location, Proper Output Power) Field Measurement

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station15 Measurement Setup

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station16 Revised Measurement Setup

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station17  Achievable Baud Rate For Wireless Channel  Maximum BER For Data Devices  Necessary Response Time For The Wireless Device  Antenna  Power Supply And Isolation  Adequate Data Security Identifying Characteristics of a Reliable System

PS ERC PSerc Review MeetingMarch 22, 2002Texas A&M University at College Station18  Identification of noise sources in substation  Worst-case analysis for two core SS modulation formats  Extraction of the necessary parameters (to be measured)  Measurement setup (modifications, verifications and programming )  Measurement runs (In process)  General requirements for the wireless system candidates (Ongoing) Conclusion