Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM 06-12-2012.

Slides:



Advertisements
Similar presentations
Transformer Coupling.
Advertisements

RRR Measurements in S23 during LS1 Emmanuele Ravaioli Daniel Rasmussen Scott Rowan Thanks to Z. Charifoulline, R. Denz, J. Steckert, H. Thiesen, A. Verweij.
Problem Solving Part 2 Resonance.
1 Electronic Circuits COMMON EMITTER CIRCUITS. 2 Electronic Circuits AMPLIFIERS CAN BE CLASSIFIED AS EITHER: VOLTAGE AMPS POWER AMPS AMPLIFIERS CAN BE.
New HV test specification for the LHC N. Catalan for the EI section.
Chapter 13 Small-Signal Modeling and Linear Amplification
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Part B-3 AMPLIFIERS: Small signal low frequency transistor amplifier circuits: h-parameter representation of a transistor, Analysis of single stage transistor.
General Engineering Polytechnic University Laboratory 9: Electrical Filters.
Proposal for measurements on RB.A81 on 1st September August 2010 Emmanuele Ravaioli Thanks to A. Verweij.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Report on problem in opening the 13kA EE system (issue recently found during last CSCM) Bozhidar Panev
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
CSCM Project Powering cycle and results of the PSpice simulations Emmanuele Ravaioli Thanks to H. Thiesen, A. Verweij TE-MPE-TM
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Proposal for FTF measurements on dipole magnets in the tunnel during the Christmas break Emmanuele Ravaioli TE-MPE-TM
TE- MPE PE members 1.Bernhard Auchmann; 2.Zinur Charifoulline; 3.Michael Jonker; 4.Arjan Verweij; 5.Daniel Wollmann; 6.Rüdiger Schmidt; 7.Vera Chetvertkova.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
AT-MEI Group, CERN, 1211 Geneva 23 MPP Unbalance between apertures of MB B30R7 MPP meeting 18/06/2008 Unbalance between apertures of Dipole.
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Inductance and magnetization measurements on main dipoles in SM18 Emmanuele Ravaioli Thanks to A. Verweij, S. Le Naour TE-MPE-TM
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
MP3 List of main Issues during March 2010 MP3 - Team.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
TE-MPE -EI 23/6/2011,Antonopoulou Evangelia RQS circuit Simulation results of Quench Antonopoulou Evangelia June 2011 Thanks to E. Ravaioli.
Advanced simulations of events in the RB circuit Short circuit to ground Quench of a dipole provoked by the quench heaters Emmanuele Ravaioli Thanks to.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
AC Loss Measurements on the HQ2 Magnet Emmanuele Ravaioli Thanks to H. Bajas, G. Chlachidze, V. Marinozzi, M. Tartaglia, X. Wang HQ Meeting
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
SUB.TEACHER:- MR.PRAVIN BARAD NAME:-SAGAR KUMBHANI ( ) -VIKRAMSINH JADAV( ) -PARECHA TUSHAR( ) TOPIC:-LINEAR AMPLIFIER(BJT.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
E. Todesco RETRAINING AND DETRAINING IN THE LHC E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC Machine Advisory.
Mikhail Ovsienko TE-MPE-EE
Frequency Transfer Function of a dipole What is it Why is it important How to calculate it How to model it How to measure it Emmanuele Ravaioli LHC-CM.
Measurements of Voltage Oscillations after a Fast Power Abort in Sector 67 during the Christmas stop Emmanuele Ravaioli – TE/MPE Thanks to A. Verweij,
Giorgio on behalf of ELQA team
Status of RB circuit modeling PSpice models Simulation results: nQPS & oQPS Comparison with QPS data Ongoing activities Emmanuele Ravaioli TE-MPE-TM
LHC Hardware Commissionning
12 October 2009 RRB Plenary R.-D. Heuer
Schematic diagram of part of a house wiring system
Powering the LHC Magnets
MPE main activities planned for LS2
Transistor Amplifiers
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Concepts for magnet circuit powering and protection M
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Dipole diode lead resistance measurement
Dipole circuit & diode functioning
Powering from short circuit tests up to nominal
1) Schematic diagram of part of a house wiring system
electronics fundamentals
Introduction to Lab Equipment
Other arguments to train two sectors to 7 TeV
Presentation transcript:

Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM

Unbalanced voltage drop across 2 apertures of some main dipoles Emmanuele Ravaioli MPE-TM For more info: TE-Magnet-Seminary - Circuit simulations of the main LHC dipoles and the case of the 'unbalanced' dipoles – Ravaioli TE-Magnet-Seminary - Circuit simulations of the main LHC dipoles and the case of the 'unbalanced' dipoles – Ravaioli 5JO-3_Ravaioli_ Modeling of the voltage waves in the LHC main dipole circuits Modeling of the voltage waves in the LHC main dipole circuits 28 Hz Why is the impedance of the two apertures different? 28 Hz

Distribution of ΔU pp in S67 (ramp at 2 kA, 10 A/s) Emmanuele Ravaioli MPE-TM There is no correlation between ΔU pp and Electrical position Physical position Magnet manufacturer Cable manufacturer Mechanical parameters (checked with Andrea Musso) The phenomenon is more evident when the current in the magnets is about 2 kA. (less amplitude at 6 kA, less amplitude at 1 kA; only present when magnets are ramping) Why does the phenomenon peak at 2 kA? Will it be worse at 7 TeV? 28 Hz

Cumulative distribution of ΔU pp in all sectors Emmanuele Ravaioli MPE-TM About 50% of the LHC main dipole magnets have a ΔU pp larger than expected.

Some dipoles have even stranger signals – “Outlier dipoles” 5 Emmanuele Ravaioli MPE-TM Displayed dipoles B24L7 B10L7 C27R6 C17R6 FPA at 6 10 A/s (S67 20/05/ ) Some dipoles undergo a strange transient after the opening of the switches, lasting about a second Some magnets in every sector (5-10) present this behavior with different amplitude; in a few cases (a dozen in the whole LHC) the phenomenon was so significant that the oQPS threshold had to be changed to a higher value (see Zinur’s list). The behavior scales up with the current level. Not related to the DQQDL boards used for the QPS measurements. What is the origin of the behavior of the “outlier” dipoles?

Frequency Transfer Function – AC impedance of a system 6 Emmanuele Ravaioli MPE-TM Example:L = 2*L aperture = 98 mHC = 2*C ground = 300 nFR = R parallel = 100 Ω A fast and practical way to measure the behavior of a complex system at different frequencies.

Frequency Transfer Function – Setup 7 Emmanuele Ravaioli MPE-TM Equipment (borrowed from ElQA?) Gain Phase Analyzer Amplifier PC Remarks Time needed for a measurement (magnet+ 2 apertures + 4 poles) ≈ 10 min Max current in the magnets < 1 A If performed after the ‘removal’ of QPS no patches needed (connection to V-taps)

Frequency Transfer Function of dipole apertures in the tunnel 8 Emmanuele Ravaioli MPE-TM Magnet ΔU PP [mV] ΔZ A % % % % Procedure: EDMS Results: EDMS Nice correlation! 28 Hz >15% difference at 28 Hz!

Frequency Transfer Function – Tunnel vs SM18 Emmanuele Ravaioli MPE-TM Reddish → Tunnel Bluish → SM18 AC impedance measured in the tunnel above ~50 Hz about half of the impedance measured in SM18 Why are the FTF measured in the tunnel different from the ones in SM18?

Frequency Transfer Function – Tunnel vs SM18 vs Simulation Emmanuele Ravaioli MPE-TM Two apertures with different cross-contact resistance, i.e. with different inter-strand coupling losses, have a dramatically different AC impedance. In this example: Rc1=100 µΩ, Rc2=25 µΩ The model can simulate impedance differences between the two apertures in the correct frequency range, but it cannot simulate the high frequency behavior! Is there a correlation between AC losses and the measured FTF? Are inter-strand coupling losses the responsible for the unbalance?

Emmanuele Ravaioli MPE-TM Why is the impedance of the two apertures different? Why does the phenomenon peak at 2 kA? Why are the FTF measured in the tunnel different from the ones in SM18? What is the origin of the behavior of the “outlier” dipoles? Will it be worse at 7 TeV? What about quadrupoles? And what about other magnets? Is there a correlation between AC losses and the measured FTF? Are inter-strand coupling losses the responsible for the unbalance? Effects of currents to ground? Phenomenon realated to superconductivity effect or not? We need to know more about the AC impedance of the LHC magnets at different frequencies

Test Proposal – Frequency Transfer Function 12 Emmanuele Ravaioli MPE-TM #WhatWhereWhenTimeMotivationI need help! 1 FTF of 15 to-be-replaced dipoles (2372, 2373, 2377, 2395, 2387, 2413, 2336, 2353, 2357, 2438, 2252, 2138, 1007, 2007) S12, S45, S78, etc Start of LS13 h Compare FTF from tunnel and SM18 (1007↔2431, 2007↔3128, 2373↔2868) 2FTF of 30 more dipoles (60?)S67?Start of LS16 h - More statistics - Look for outliers 3 FTF of 10 “outlier” dipoles (22 non- conformities) Mostly S78 Start of LS12 hBetter understanding 4 FTF of 4 dipoles moving the grounding point of the chain S67?Start of LS12 h Asses influence of paths to ground ElQA 5FTF of 10 main quadrupolesAny SStart of LS12 hV-taps? 6FTF of 1 MQXA, MQXBAny SStart of LS11 hV-taps? 7FTF of 1 MQM, MQMC, MQMLAny SStart of LS11 hV-taps? Start of LS12 days? 8FTF of 4 dipoles at 20 KS23 During CSCM time-frame 1 h Assess impact of superconductivity effects 9 FTF of 15 (5?) to-be-replaced dipoles at warm After cooling down 2 h Assess impact of superconductivity effects 10 FTF of 2 to-be-replaced dipoles (+AC loss measurements) SM18 1 month? - Compare FTF from tunnel and SM18 - Relate FTF and AC loss SM18 team 11FTF of 15 replaced dipoles S12, S45, S78, etc End of LS13 h - Compare FTF from tunnel and SM18 New QPS?

Annex 13 Emmanuele Ravaioli MPE-TM

Distribution of ΔU pp in S12 (ramp at 2 kA and at 6 kA, 10 A/s) -1 Emmanuele Ravaioli MPE-TM Why does the phenomenon peak at 2 kA? Will it be worse at 7 TeV?

Distribution of ΔU pp in S12 (ramp at 2 kA and at 6 kA, 10 A/s) -2 Emmanuele Ravaioli MPE-TM Why does the phenomenon peak at 2 kA? Will it be worse at 7 TeV?

RB.A78: 30/06/ A 5000A 3000A 2000A Top 10 magnets: A16L8 – 3504 B17L8 – 2006 B30R7 – 1007 * B8R7 – 1031 C28R7 – 2011 B29L8 – 1009 A15R7 – 3020 B29R7 – 1013 A21R7 – 3014 A22R7 – 1023 Threshold changed to 264mV! Emmanuele Ravaioli Special TE-MPE-TM Outlier dipoles – Past observations -1 From MPP meeting (16/07/2008) Zinour Charifoulline Note: Data acquired when the value of the extraction resistor was halved

Emmanuele Ravaioli Special TE-MPE-TM Outlier dipoles – Past observations -2 From Zinour Charifoulline

Dipoles high ΔU pp for several seconds 18 Emmanuele Ravaioli MPE-TM Displayed dipoles B28L7 A27L7 A28L7 B32R6 FPA at 6 10 A/s (S67 20/05/ ) Some dipoles present a voltage difference larger than normal after the opening of the switches; such a behavior lasts for many seconds (during the whole discharge?). After the first switch opening, the voltage difference of these dipoles is about half of that measured after the second switch opening A few magnets in every sector (5-10) present this behavior This phenomenon was found to be related to electronics (Board A and B give different results!)

Frequency Transfer Function – Four poles of an unbalanced dipole Emmanuele Ravaioli MPE-TM

Frequency Transfer Function – Modeled AC impedance Emmanuele Ravaioli MPE-TM