Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.

Slides:



Advertisements
Similar presentations
Cochise, Maricopa, Mohave, Navajo, Pima, Pinal, Yavapai and Yuma Counties.
Advertisements

LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
BAT Work Group. BAT Work Group Goals Develop a procedure for identifying technologies eligible for funding Propose policies and regulation necessary to.
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Community Land-Based Wastewater Disposal in Pennsylvania Prepared by: Mr. Brian Oram, PG Wilkes University
Land Use Program Septic System Overview Scott Weldon
THE Contractual Health Agency for: Bernards Township Bernardsville Borough Chester Borough Long Hill Township Mendham Borough Mendham Township Peapack.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 1: Introduction and Wastewater Recap.
Waste Ban Compliance Training Program Administrative Compliance Requirements April and May 2006 Administrative Compliance Requirements April and May 2006.
Waste treatment. WASTEWATER (Chapter 22) Sewer – Sanitary waste Generated from buildings –Liquid discharged from plumbing fixtures Carried by sanitary.
SEPTIC SYSTEM DESIGN. SEPTIC SYSTEM DESIGN Ken Stratton.
The New Mexico Environment Department The Department’s Mission is to provide the highest quality of life throughout the state by promoting a safe, clean,
Connecticut Department of Energy and Environmental Protection.
Laboratory Fume Hoods In accordance with Title 8 CCR Section , Ventilation Requirements for Laboratory-Type Hood Operations. California State University.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
1 Septic Tank Drainfield Site Suitability and Evaluation Workshop Montana State University Extension Service, Department of Land Resources an Environmental.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Maine Department of Health & Human Services February 26, 2009 Wells, Maine Division of Environmental Health Subsurface Wastewater Program VOLUNTARY INSPECTOR.
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
Assessing Your School An Environmental Investigation You have been hired by Eagle Environmental, Inc. to perform an Environmental Assessment of South Hunterdon.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Connecticut Department of Energy and Environmental Protection.
Soils Investigation Soil Investigation
Lancaster County Property Transfer Code John Chess REHS, MPA, Water Quality Supervisor Lincoln Lancaster County Health Department Doug Smith REHS, Environmental.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 5: Design and Plan Review— Non-Conventional Systems.
Presented by Dwain Butler District Director of Environmental Health Southeast Health District Waycross, Georgia.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 7: Existing Septic Systems: Inspections and Corrective.
After the Sanitary Survey
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 2: Permits and Licenses.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 3: Site Evaluation and Selection 1 MA PHIT- Wastewater.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Lynne Welsh Massachusetts Department of Environmental Protection.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Testing Liaison Basic Training. Who can be a Testing Liaison? ONE RULE: INSTRUCTORS AND INSTRUCTIONAL AIDES CANNOT BE TESTING LIAISONS OR PROCTORS Typically,
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Revised 2/1/2011. Parts 1-4 are self-explanatory. The PIN number is obtainable through City Planning or on-line GIS maps. PLEASE TYPE OR PRINT 1. Project.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
CROSS CONNECTION CONTROL PROGRAM
Septic System Overview
Transitioning from the Percolation Test to Soils Evaluation
OWTS Design Considerations Under Reg. 43
Chuck Cousino, REHS Onsite Wastewater Program Coordinator
Agenda 2015 Installers Meeting
Homeowner Responsibility
What is an on-lot sewage system?
Tuscarawas County Health Department Operation Permit
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Private Septic Systems
Private Septic Systems
What to Expect When You’re Inspected
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Homeowner Responsibility
BAT Work Group.
Fiber Reinforced Polymer Systems
Presentation transcript:

Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part 2: Soil Absorption Systems 1 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Learning Objectives After completing this session, you will be able to:  List functions and features of onsite wastewater components  Describe a conventional onsite wastewater system layout  Explain design plan requirements  Analyze elements of design plans  Determine appropriate steps to take after completing a plan review 2 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

3

Soil Absorption System (SAS) 4 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Soil Absorption System (SAS) Functions:  Stabilization of organic waste  Removal of pathogens (i.e., bacteria and viruses), nutrients, and particulates  Recharge of groundwater  Nuisance prevention Features:  Most important part of onsite wastewater system to design and build correctly  Very site specific 5 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

SAS Types  Leaching Trenches  Leaching Fields  Leaching Pits  Leaching Chambers 6 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Soil Information Within 60 days after soil testing,  Soil Evaluator (SE) of record must certify soil results to Board of Health (BOH)  SE of record must submit soil results to BOH Design plans should include:  All deep hole locations and logs (incl. elev.)  Perc test locations and logs (incl. elev.)  SE of record  Other important information MA PHIT- Wastewater Certificate Program, Session 4, Part 2 7

SAS Look for:  System Size  Type  Test Results and Calculations MA PHIT- Wastewater Certificate Program, Session 4, Part 2 8

Plan Review — SAS System Size  Size is a Function of Flow, Soil Classification, and Percolation Rate  Long-Term Acceptance Rate (LTAR) Obtained From Chart in Title 5  Chart Includes Two Rates; One for Gravity Flow and One for Pressure Distribution 9 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

LTAR 10 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Review — SAS System Size (cont’d)  Minimum Area = Design Flow / LTAR.  Area Increased by 50% With Garbage Grinder  Reduced footprint system (such as Gravel-less Chamber Systems) Must Show a Full-Size Conventional System as Being Possible on the Site for New Construction 11 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Review — SAS System Type MA PHIT- Wastewater Certificate Program, Session 4, Part 2 12  Trenches are the Preferred Type of SAS  Reserve Area Needed for New Construction  Specific Details at (Trenches), (Fields) and (Pits)

Plan Review — Calculations and Test Results  Are Soil Test Results Shown on the Plan?  Are There an Adequate Number of Tests and is the SAS Located in Area of Testing?  Do the Results on the Design Plan Match Your Field Notes?  Do you have 4' Naturally Occurring Soil? MA PHIT- Wastewater Certificate Program, Session 4, Part 2 13

Pervious Soil and DTGW 14 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Inadequate soil data MA PHIT- Wastewater Certificate Program, Session 4, Part 2 15

Plan Review — Depth to Groundwater (DTGW)  DTGW ̶ Estimate Distance from Bottom of SAS ̶ 4' Separation if Perc Rate > 2min/inch ̶ 5' Separation if ≤ 2min/inch 16 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Review — DTGW 17 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Review — Grading When Raised  Breakout Must Meet 15’ Then 3:1 Slope  Barrier and/or Retaining Wall Acceptable  5 Foot Overdig Required 18 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Review — Other SAS Details  No Driveway or Impervious Area Over SAS if Possible  Venting, if necessary  Fill Specifications Should be Provided  Aggregate Double-Washed Stone and Double- Washed Peastone  Clarity of the Design on Paper for Use by Reviewer and for Use by Installer 19 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Clarity?? 20 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Plan Clarity 21 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Other SAS Details, (cont’d) Vents and Inspection Ports Look for:  Vents, if SAS is under impervious surface ̶ Requirements ̶ Location  Inspection Port ̶ Required for all SASs ̶ Location MA PHIT- Wastewater Certificate Program, Session 4, Part 2 22

The Plan Review Process— Closure  At Completion, Should Have a Letter Generated to the Property Owner (With Copy to the Designer) Indicating the DSCP and Accompanying Design Plan is either: ̶ Approved ̶ Approved with Conditions ̶ Disapproved and Reasons Why ̶ Should Provide Explanation of Other Steps Required (i.e. Cons Comm, DEP) 23 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Approvals Permits  Disposal System Construction Permit (DSCP) Letters  Only required for MassDEP variances but are recommended as a best practice  Should include: ̶ date of approval ̶ plan name, date, revision date(s) and designer ̶ date of meeting or hearing, if any MA PHIT- Wastewater Certificate Program, Session 4, Part 2 24

Sample Letters MA PHIT- Wastewater Certificate Program, Session 4, Part 2 25

MA PHIT- Wastewater Certificate Program, Session 4, Part 2 Now Let’s Look at Some Plans… 26

Title 5 Plan Review Cut Sheet 1 ’Before’ 27 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Cut Sheet 1 ‘After’ 28 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

TP1 0” 3” 29” 90” A - SL B - SL C1 Loamy Sand 2.5Y6/3 mottling at 45” Refusal Percolation Test Test #Rate A6 mpi B5 mpi Date of soil testing : 10/28/2011 Witness: Board of Health Inspector I certify that I have passed the examination approved by DEP and that the soil analysis has been performed by me consistent with the required training, expertise, and experience described in 310 CMR (1). John Smith Cut Sheet 2 ‘Before’ 29 MA PHIT- Wastewater Certificate Program, Session 4, Part 2

Percolation Test Test #DepthElev.Rate A 24 in mpi B 36 in mpi 30 MA PHIT- Wastewater Certificate Program, Session 4, Part 2 Cut Sheet 2 ‘After’ 0” 3” 29” 90” A – SL 5YR 2.5/1 B – SL 10 YR 4/3 C1 Loamy Sand 2.5Y6/3 Refusal TP1 Mottles at 45” v Date of soil testing : 10/19/2011 Soil Evaluator: Claire Golden Witness: John Meredith, BOH Agent I certify that I am currently approved by the Department of Environmental Protection pursuant to 310 CMR to conduct soil evaluations and that the above analysis has been performed by me consistent with the required training, expertise, and experience described in 310 CMR I further certify that the results of my soil evaluation, as indicated on the attached soil evaluation form, are accurate and in accordance with 310 CMR through ___________________________________ Claire Golden, SE #900

MA PHIT- Wastewater Certificate Program, Session 4, Part 2 31 Cut Sheet 3

32 MA PHIT- Wastewater Certificate Program, Session 4, Part 2 Cut Sheet 4a

33 MA PHIT- Wastewater Certificate Program, Session 4, Part 2 Cut Sheet 4b

More clarification on pump chamber UPHILL Cut Sheet 5 34 MA PHIT- Wastewater Certificate Program, Session 4, Part 2 Cut Sheet 5

MA PHIT- Wastewater Certificate Program, Session 4, Part 2 35 Breakout Calculations Conventional System  Breakout elevations  Distance

MA PHIT- Wastewater Certificate Program, Session 4, Part 2 36

Session Recap  List functions and features of onsite wastewater components  Describe a conventional onsite wastewater system layout  Explain design plan requirements  Analyze elements of design plans 37 MA PHIT- Wastewater Certificate Program, Session 4, Part 2