HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,

Slides:



Advertisements
Similar presentations
Protection study options for HQ01e-3 Tiina Salmi QXF meeting, 27 Nov 2012.
Advertisements

Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
Test Result overview: Timeline, highlights and challenges H. Bajas TE-MSC-TF.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Overview of main results from first HQ02a test For HQ meeting 7/30/13.
HQ02b Meeting 4/24/14High Miits Study – G. Sabbi 1 High MIITs Study GianLuca Sabbi Video meeting on HQ02b test results – April 24, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
HQ01e3 test summary December 2012 M. Marchevsky, LBNL.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
MQXF Design Review, 12/10/14R&D basis for MQXF – G. Sabbi 1 IR Quadrupole R&D Program as a basis for MQXF GianLuca Sabbi QXF Design Review CERN, December.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Update on Q4 DSM/IRFU/SACM The HiLumi LHC Design Study (a sub-system of HL-LHC) is partly funded by the European Commission within the Framework Programme.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Sept. 29, 2008Rodger Bossert1 Quench Positions in TQC Models Rodger Bossert Technical Division Technical Memo #TD September 29, 2008.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LQM01 Test Summary Guram Chlachidze LARP CM16 Montauk, NY May 16-18, 2011.
MQXFSM1 results Guram Chlachidze Stoyan Stoynev 10 June 2015LARP meeting.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
HQ02 TEST STATUS April 4, 2013 FERMILAB. Test status  Magnet delivery to FermilabApr. 02  SG checkoutApr. 04  LE & RE interface plate mounting Apr.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
HL-LHC Meeting, November 2013Field Quality Update – G. Sabbi 1 Field Quality Updates HQ/QXF and D2 GianLuca Sabbi Acknowledgement: Joe DiMarco, E. Todesco,
DOE Review, 7/15/2010GianLuca SabbiMagnet Systems - Progress and Plans Magnet Systems Summary Progress and Plans GianLuca Sabbi DOE Review of the LHC Accelerator.
MQXFPM1 and MQXFS1b Test Results
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
HQ Mirror Assembly R. Bossert
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Quench Protection and Meeting Goals
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
HQ01e-3 magnetic measurements
the MDP High Field Dipole Demonstrator
New Magnets for the IR How far are we from the HL-LHC Target?
Hilumi WP3 meeting, 1 October 2014
Guram Chlachidze Stoyan Stoynev
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Long term behavior of MQXFS1
Long term behavior and high MIITs test in the LARP program
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14, 2013

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 2 HQ Program Status/Plans HQ02: test second-generation HQ coils including  provisions for coil expansion during reaction  provisions for improved electrical integrity  cored cables for suppression of eddy current effects HQ03 model using uniform, final design and process  Realistic field quality & performance reference for HL-LHC Detailed discussion of HQ program status and plans took place in July The resulting summary document is available at: /HQ-plans-2.docx /HQ-plans-2.docx In the next slides, we review and update some of the key points

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 3 HQ02a-2 Test Summary: results vs. plan Achieve highest possible current at 2.2 K and 4.5K with current configuration First quench above 15kA: no performance loss after thermal cycle Slow training at 2.2K above 15kA, several coils/locations but all in high field (pole) area Clear signs of insufficient pre-load, as expected Fall backs at moderate miits, with slow retraining No performance loss at 4.5K, achieving 98% of SSL at 4.5K and enabling detailed performance studies in many areas: ramp rate, quench velocities, performance degradation limits due to stress, high miits etc. Perform additional magnetic measurements and heater studies Full characterization completed Incorporate acoustic sensor and quench antenna for additional information on quench development -- Completed Resolve inductance questions -- Problem tracked to 15kA header

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 4 Continue quench protection studies, use temperature that allows highest fraction of SSL – 4.5K Establish miits budget (ok if it detrains but we want to go back within 5% of maximum achieved fraction of SSL) Not possible due to slow training and easy detraining, but 98% SSL allowed to establish no degradation up to 16 miits Complete quench integral study and add small (2.5-5 mOhm) dump resistor Completed no dump and 5 m-Ohm, results are close, 2.5 mOhm must be in between No high miits quenches directly aimed at establishing performance degradation in this test Added: studies in preparation for CLIQ test More details on AC losses, comparison with HQ01e HQ02a2 Test Summary: results vs. plan (2)

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 5 HQ02b assembly plan Option 1: perform a complete disassembly of HQ02a Attempt to understand and fix faulty strain gauges Reassemble with higher pre-load (level to be discussed) and/or coil configuration changes (update: no coil changes needed) Option 2: Increase the pre-load Currently leaning toward option 2: there is no need to exchange coils, and strain gauge study could be performed separately However, it means no reliable coil stress measurements in HQ02b It would also prevent from removing the warm bore guide blocks  We will have a dedicated meeting in 2-3 weeks to discuss Future HQ02 assembly should include warm magnetic measurements A plan is in place, with FNAL support Include correction of high field errors with magnetic shims Discuss limitations due to presence of guide blocks in option 2

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 6 Perform 1.9K measurements up to maximum achievable current Establish performance improvements/degradation with higher pre-load Robustness studies: large number of cycles, full accelerator cycle Incorporate/characterize new instrumentation (QA, acoustics etc.) Assess performance of CLIQ system for magnet protection Establish safe miits budget as was planned for HQ02a-2 Extend quench protection studies within safe miits budget Quench integral, heater tests, CLIQ etc. Perform study of degradation vs. MIITS (to be discussed) Perform magnetic measurements (to be discussed) Timeline: with simple pre-load increase, test could start in February; one additional month for full reassembly. Discussion on planning and organization for HQ02b test is starting: test plan/priorities, definition of key roles and responsibilities (LARP/CERN) HQ02b Test at CERN

HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 7 Coil fabrication is progressing well, expect to have coils ready following the test of HQ02b at CERN However, coil strain gauges are an issue: we need to understand and fix reason for failures in HQ02 (and LQS03) This may require dedicated tests/analysis and may cause delays Option 2 assembly for HQ02b means no magnet feedback before HQ03 Also, we want to implement a QXF-style heater design in coil 26 (spare) and possibly in coil 25 (last coil of nominal set) – this is also on the critical path Planning to implement magnetic shims for correction of high current harmonics (based on warm magnetic measurements) and magnetic shims for correction of persistent currents (based on calculations and HQ02 measurements) Need to decide on test location (FNAL or CERN) Discuss status of VMTF upgrade for full current at 1.9K Implement upgrades in the magnetic measurement system (both CERN/ and FNAL) HQ03 Plan