Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.

Slides:



Advertisements
Similar presentations
HydroQual, Inc. Application of the SWMM Storage-Treatment Block for Analysis/Design of Extended-Detention Ponds Thomas L. Newman II, P.E. Tarig A. Omer.
Advertisements

Runoff Analysis of the Watersheds “El Arroyo El Chilito” and “La Presa Bernardez” Guadalupe, Zacatecas, Mexico Nathan Lowe, Shawn Stanley and Jeffery Crump.
Site Grading Site Grading Civil Engineering and Architecture
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Chapter 3.1 Storm Drainage Sizing. Building Drain & Sewer  Building Drain —That part of the lowest piping of a drainage system that receives the discharge.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Center Street & 2080 East Roadway Connection Springville City John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist.
Big Trout Lake Stormwater Management Design Project By Hannah Rollin.
CHARACTERISTICS OF RUNOFF
Continuity Equation Tutorial
Design of Open Channels and Culverts
Chapter 3.1 Storm Drainage Sizing. Building Drain & Sewer  Building Drain —That part of the lowest piping of a drainage system that receives the discharge.
CITY OF HOUSTON PUBLIC WORKS AND ENGINEERING July 17, 2008.
Biet Qad Village Climate Relative Humidity Evaporation.
Reading: Applied Hydrology, Sec 15-1 to 15-5
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Surface Drainage CE 453 Lecture 25.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
The Orange County Water District Riverbed Filtration Pilot Project Jason Keller 1, Michael Milczarek 1, Greg Woodside 2, Adam Hutchinson 2, Adam MP Canfield.
Stormwater Study To determine the effectiveness of the campus’ existing stormwater infrastructure, if NSCC qualifies for a stormwater credit and to propose.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
 Prepared by  Prepared for  City of Palm Coast, Florida  January 27, 2015  Drainage Study Sections 30 & 34 for Development of City Wide Stormwater.
Samantha Ambrose SOIL   What is tile and how does it work?  The old days  Today’s technology Introduction.
Underground Systems: Hydraulic Design
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
GUTTERS and INLETS Gutter : A gutter is a triangle open channel along the curb stone of streets which carry the storm water along streets to inlets. Inlets.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Urban Storm Water Runoff and Inland Lakes: A Tale of Two Cities Jarron D. Hewitt and Martin T. Auer Department of Civil and Environmental Engineering,
CE 3372 Water Systems Design Introduction to SWMM.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Curb and Gutter Under Construction Completed
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Urban Storm Drain Design: Laterals. Sizes Laterals carry water from inlets into junction boxes, where it leaves by a trunk line. The HGL of laterals can.
Basic Hydraulics: Culverts – I
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
CE 3372 Water Systems Design
Application of the Continuity Equation Dr. Eyad Abushandi.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 25 July 2012 Lesson 14.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Culler Lake Bathymetry: Potential Changes Following Dredging Spring 2013 Sampling Methods Class: J. Bruland, M. Dybala, N. Gunther, A. Hoffman, J. Jones,
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Gray Area: Edgewater Construction Elevation Build up, No Data 01 ft. Storm Surge Gray Area: Edgewater Construction Elevation Build up, No Data NOTE: No.
Queenston Manor Apartments -
Sinclair Wash Stream Restoration Feasibility Study
Water Drainage System Harris County, TX
Storm Sewer Assessment for South Newport Subdivision
Town of Brighton, Department of Public Works
Storm Water Drainage Analysis for Harris County (Crosby, TX)
Drainage Study Sections 30 & 34 for Development of City Wide Stormwater Management Master Plan Prepared for City of Palm Coast, Florida Prepared by March.
Manchester’s CSO Program: A Look Behind and a Look Ahead
CE 3372 Water Systems Design
Components of Stormwater Management Systems
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Storm Water Storage and Treatment
CE 3372 Water Systems Design
Love Field Modernization Program
بسم الله الرحمن الرحيم (وقل ربي زدني علما)
Presented by: Corky Lambert & Peter Van Tilburg
Regional Stormwater 2016 Operations, Maintenance, & Projects
Presentation transcript:

Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

N Design a stormwater drainage system for the city of Bluffdale Assess current infrastructure Assess current drainage needs for a 100 year 24 hour storm Design of new infrastructure using EPA SWMM Prepare a cost estimate

Map of Existing Inlets and Pipe Locations

3 Drains in Neighborhood 1 drain has no pipe exit 2 drains empty into trench  9 Drains on Northern Street Pipes over to Bangeter Highway system

STEPS  Create drainage basins for each inlet  Find the depth of the 100 year 24 hour storm  Calculate flow lines and accumulations  Calculate curve number using soil type and land use data  Export information into HEC- HMS Map of Drainage Basins

HEC-HMS Model HEC-HMS Output

Node Average Depth (ft) Maximum Depth (ft) Outfall0.66 Link Max Flow (CFS) Max Depth (ft) Flow Volume vs. Time in Fullest Pipe Depth of Water in Pipe vs. Time Depth of Water and Inlets Depth and Flow in Pipes

b 6b 5a 2b 2a 1a 4a 3 4b 5b 6a Final Design Existing Proposed……………. Pipe Labels…………… Inlet Label……………

Pipe IDSurface UpstreamSurface DownstreamInvert UpstreamInvert DownstreamLengthGradePipe Diameter % % % % % %1.5 Total Length Inlet IDSurface Elevation Invert ElevationDepth of Pipe 1a b a b a b a b a b Cross PipesUpstream InvertDownstream InvertGrade % % % % % Pipe elevation and length information Inlet elevation and box depths Cross Pipe depths

ITEMQUANTITYUNIT UNIT COST ITEM COST Mobilization1LS $ 8, Furnish and Install 18-inch RCP Pipe1635LF $ $ 85, Furnish and Install 15-inch RCP Pipe152LF $ $ 6, Manhole6EA $ 2, $ 15, Inlet8EA $ 2, $ 17, Roadway Patching596SY $ $ 11, Remove Surface Materials (asphalt)1787LF $ 9.00 $ 16, Construction Cost: $ 159, Construction Contengencies (20%): $ 31, Engineering Design and Construction Management (15%): $ 23, Total Cost: $ 215, Total Cost (Rounded): $ 216,000.00