2006 Cumulative Effects Assessment. 2006 CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.

Slides:



Advertisements
Similar presentations
Environmental Impact Assessment for Waste Treatment Options
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Environmental Assessment in Nova Scotia
Baffinland Mary River Project Environmental Assessment Methods Marine Environment VECs Workshop Session 02 November 2011.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Tonnie Cummings National Park Service, Pacific West Region National Tribal Forum on Air Quality May 14, 2014.
Environmental Impact Assessment: A Land Use Planning Tool Diane Sherman, Ben Purdy, and Sara Felker Department of Resource Development Introduction Environmental.
The Ocean’s Role in Climate Change. Responding to the Kyoto Protocol Climate Change Action Fund (CCAF) Initiatives Reduce greenhouse gas emissions. Reduce.
Environmental Design and Land Use Chapter 21 Research Methodologies.
Future Research NeedsWorld Heritage and Climate Change World Heritage and Climate Change - Future Research Needs Bastian Bomhard World Heritage Officer.
Environmental Assessment of Marine Renewable Energy Presentation to Pre-BIC meeting 24 th June 2010 Andrew Casebow Chris Green.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
Nunavut Impact Review Board Public Information Meetings
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
WP2 Quality of Life Indicators Charles University of Prague Ludek Sykora.
Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.
Inuit Qaujimajatuqangit. Traditional knowledge –Selection based on: same as archaeology boundary Kugluktuk traditional area travel routes Nunavut - NWT.
1 The Lower Athabasca Regional Plan: A Case Study Biol. 595 Sept. 16, 2009.
February 23–24, 2011 in San Diego, California. Focused on the following four border transportation themes:  Sustainability and Livability,  Green financing.
Meadowbank Government of Nunavut Presentation to Nunavut Impact Review Board March 2006Baker Lake, Chesterfield Inlet, Rankin Inlet.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
Proposed Action Purpose and Need A proposal to authorize, recommend, or implement an action in response to the need identified in the Purpose and Need.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Sustainability Issues
Basic Concepts for Assessing Environmental Impacts.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Watershed Assessment and Planning. Review Watershed Hydrology Watershed Hydrology Watershed Characteristics and Processes Watershed Characteristics and.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Tahera Environmental Monitoring Commitments Summary Use TK in monitoring; cooperate with communities Collect reliable information that will: Allow detection.
AN INTRODUCTION TO CUMULATIVE EFFECTS ASSESSMENT.
2006 Marine Transport  Likely to use existing supply vessels up to Helicopter Island  Lightering at Helicopter Island  Barges from there to Baker Lake.
Izok Corridor Project: Kitikmeot Community Visit
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Kirk LaGory North Aleutian Basin Information Status and Research.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Identifying Information Needs and Research Priorities for the North Aleutian Basin of Alaska Fish and Fisheries Working Group John Hayse North Aleutian.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Wildlife and Wildlife Habitat Kim Poole Wildlife Discipline Lead Aurora Wildlife Research Jess Dunford Wildlife Biologist Gartner Lee Limited.
Freshwater and Society Module 1, part C. Developed by: Updated: U?-m1c-s2 Water quality degradation
Sample Codes of Ethics in Adventure Tourism
CALIFORNIA'S STATE WILDLIFE ACTION PLAN 2015 UPDATE A Conservation Legacy for Californians Armand Gonzales, Project Lead.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
Results from the Downscaling Needs Assessment Survey April 2011 Sarah Trainor Courtesy of Tony Weyiouanna Sr. & Dave Atkinson.
Gulana Hajiyeva WB Safeguards Training Workshop Almaty, December 2012.
Andrew Burwood, Sean Cullen, Gillian Davidson, Pierre Pelletier Rescan Environmental Services IAIA Conference, Seoul, 6 June 2007 IFC Performance Standards.
Interactions Within Ecosystems Chapter 3
Brandi M. Carrier Archaeologist Office of Renewable Energy Programs Port Modifications and their Consequences “In an industry where.
Biological effects of anthropogenic activities Eugeniusz Andrulewicz Department of Fisheries Oceanography and Marine Ecology Sea Fisheries Institute, Gdynia,
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
Inclusion of Health and Wellbeing Impacts within Environmental Assessments for Major Land-Use Planning Projects in New South Wales, Australia Patrick Harris,
Table 1. Environmental impacts associated with upstream and downstream petroleum operations Aniefiok E. Ite et al. Petroleum Exploration and Production:
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Phase 2 Hope Bay Belt Project
Phase 2 Hope Bay Belt Project
Desertification in Europe
Environmental Assessment and Licensing (EAL) in Manitoba
Unit 4: Northern & NW Europe
Mary River Project Phase 2 Proposal Cumulative Effects
Mary River Project Phase 2 Proposal Freshwater Environment
Regional Environmental Health Specialist
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

2006 Cumulative Effects Assessment

2006 CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination with residual effects of other projects and activities to affect valued components of the biophysical environment and the human environment

2006 CEA Scope Cumulative effects were only assessed if: 1.Residual project-specific effect on a Valued Environmental Component (VEC) or Valued Socioeconomic Component (VESC) will have a measurable effect or may occur 2.Residual project-specific effect on that component does, or is likely to, act in a cumulative fashion with the effects of other past, present or reasonably-foreseeable future projects and activities

2006 VECs and VSECs Assessed  Air Quality  Water Quality  Aquatic Ecosystems  Wildlife  caribou  grizzly bear  wolverine  beluga whale  Socio-economic Aspects

2006 VECs Not Assessed  Noise  Hydrogeology  Hydrology  Terrain and soils  Vegetation  Small mammals and avifauna Rationale:  considered to have negligible project effects  no overlap in zones of influence Reproduced with the permission of the Minister of Public Works and Government Services Canada, 2002 and Courtesy of Natural Resources Canada, Geological Survey of Canada, photo # C.

2006 Study Area Boundaries Regional Study Area  Specific for each VEC & VSC Actions List  73 different projects and land use activities were identified  Included active and inactive mines, mine exploration, municipal areas, tourism venues, recreational activities and traditional use  Most point sources

2006 Cumulative Effects on Biophysical Components Could occur as a result of: Overlaps between the zones of influence for residual project-specific effects for the Meadowbank Project and the zones of influence for other projects or activities in the region; and/or Linking of non-overlapping zones of influence as the result of the movement of valued ecosystem components through the region (e.g., water, fish, caribou, grizzly bear, wolverine, marine mammals).

2006 Air Quality Issues  Emissions from the mine facility  Fugitive dust emissions  Greenhouse gases Conclusions  Given zone of influence of issues, cumulative effects on air quality and greenhouse gases are not significant

2006 Water Quality Issues  Re-flooding of the Goose Island Pit and effects on water quality in Third Portage Lake  Effects of vehicular traffic on the all-weather road on water quality  9 actions could overlap with project effects Conclusions  Heavy metals from mine operations – no overlap  Road runoff effects localized  No significant cumulative effects

2006 Aquatic Ecosystems Issues  Changes in habitat availability  Activities associated with construction and the use of the all- weather road  9 actions overlap with project effects Conclusions  No significant cumulative effects on Fish or Fish Habitat due to limited movements of fish within the drainage sub-basin  A monitoring program with emphasis on water quality will be undertaken

2006 Barren-ground Caribou Issues  Temporary loss of habitat  Alteration to movement patterns and energetics  Mortality risk  72 actions overlap with project effects (31 industrial, 25 tourism) Conclusions  Alternations to movement patterns and associated changes in energetics was of greatest concern  Given mitigation, cumulative effect and contribution by Project considered to be not significant  Regional monitoring recommended

2006 Grizzly Bear & Wolverine Issues  Changes in habitat availability  Habitat alienation and alterations to movements  Mortality risk  10 actions overlap with project effects (4 industry, 3 recreation) Conclusions  Mortality risks to grizzly bear and wolverine were considered significant as mortality of one or several animals could affect regional population  Cumberland will implement monitoring programs, with a focus on mortality risks  Regional monitoring program on mortality and potential population effects

2006 Marine Mammals Issues  Collisions with barges  Alteration of movement patterns and distributions due to disturbances by barges and ships  Increased potential for exposure to contaminants as a result of spills  Changes in abundances Conclusions  Given mitigation and monitoring, cumulative effects will be not significant

2006 Socio-economic Effects  Degree of effects depends on interactions among:  Meadowbank Project and other existing or foreseeable projects and activities in the region  Suite of mitigation measures that will be implemented by Cumberland Resources, as well as measures that have been or will be implemented by other projects and the territorial and Federal governments  Decisions made by individuals and communities with regard to the Meadowbank Project, as well as events and situations that are unrelated to the project.

2006 Socio-economic Effects  Net positive effects  employment &training  business opportunities  infrastructure  social services  Effects on traditional use and wellness will depends on:  how individuals communities respond to various projects and activities  types of choices that are made  If negative cumulative effects – predict low magnitude  Heritage sites -- unavoidable loss of some sites and artifacts

2006 Overall Conclusions  Most potential cumulative effects are not significant; can be managed at project level  Possible concern of cumulative effects on grizzly bear and wolverine mortality, depending on success of mitigation program