Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
Hall A Status Hall A Collaboration Meeting June 9, 2011 Robert Michaels Acting Hall A Leader Recent Activity Publications (please write archival papers.
Future Sino-US Collaboration in QCD Phyics Ten-Year Anniversary of STAR-China Collaboration Haiyan Gao 高海燕 Duke University 1.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting.
1 Auteuil, Paris March 2011 Jefferson Lab The 12 GeV Era Hugh Montgomery.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
1 Jim Thomas The 2002 Long Range Plan The DOE/NSF Nuclear Science Advisory Committee of the Department of Energy and the National Science Foundation is.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
The PAC36 Presentation Curtis A. Meyer Carnegie Mellon University 12-May-2010.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Curtis A. Meyer Nuclear Science in the United States The Core of Matter The Fuel of Stars.
Status and General Considerations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Curtis A. Meyer 11 December, 2003 A Brief History of GlueX Curtis A. Meyer, Deputy Spokesperson Carnegie Mellon University Physics.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Nuclear Physics at Jefferson Lab Part III R. D. McKeown Jefferson Lab College of William and Mary Taiwan Summer School June 30, 2011.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
R.G. Milner2nd EIC Workshop Summary and Outlook science case machine design EIC realization.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Charge and Overview: What are we trying to accomplish during this review L. Cardman.
Lab Update Rolf Ent January 21, January 2016 Page 2 Outline Near term schedule (note: will not include Hall C/12 GeV status as you will hear more.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
Timelike Compton Scattering at JLab
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
GlueX Collaboration Meeting
Jefferson Lab Overview
Welcome Stuart Henderson May 22, 2017.
Future Trends in Nuclear Physics Computing Workshop
PAC45 Results NUMBER TITLE CONTACT PERSON HALL DAYS REQUESTED
Report to UGBOD Bob McKeown January 14, 2016.
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Jefferson Lab Status Bob McKeown May 6, 2016.
Samples of Hall B Results with Strong Italian Impact
Introduction to Jefferson Lab
Jefferson Lab Status Bob McKeown October 21, 2015.
View from Lab Management HPS Collaboration Meeting
Introduction and Workshop Charge
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Workshops Overview/Goals
Upgrade of the GlueX Spectrometer for Physics with Strange Final States Nuclear Physics Yi Qiang Nov. 13, 2011.
SOLID Collaboration Meeting
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014

2 Outline PAC and science program NSAC Long Range Plan Outlook

3 12 GeV Approved Experiments by Physics Topics TopicHall AHall B Hall CHall D Other Total The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) The transverse structure of the hadrons (Elastic and transition Form Factors) The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries TOTAL

4 12 GeV Approved Experiments by PAC Days More than 7 years of approved experiments TopicHall A Hall BHall CHall D Other Total The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) The transverse structure of the hadrons (Elastic and transition Form Factors) The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries TOTAL

5 PAC41 PAC41 was held during the week of May 19, This was a special meeting to discuss the priority of already approved proposals for scheduling during the first 3-5 years of production running (beyond commissioning) in the 12 GeV era of CEBAF. The goal of this meeting is to provide input to the Lab scheduling process from the PAC in order to realize the highest impact program early in the 12 GeV running period.

6 PAC41 The PAC will consider all such approved and conditionally approved Stage II proposals in each of the six physics categories, and discuss the relative priority of the proposals in each category. Stage II proposals are those expected to be ready, based on equipment and beam availability, for scheduling of production running (beyond commissioning) during the first 3-5 years in the 12 GeV era of CEBAF. The PAC should identify a subset of these proposals that it considers to be "High Impact" for scheduling priority during this time frame. Please note that the present status (grades and approved running time) of all previously approved proposals will not be changed by this procedure. It is not anticipated that the PAC will need additional input from the proposal collaborations for this meeting. Hall Leaders and JLab management may be consulted by the PAC during their deliberations if necessary.

7 PAC41 Results

8 PAC41 Results (cont’d)

9

10 PAC41 Results PAC41 identified 643 PAC-days of “High Impact” experiments These will receive priority for scheduling in the first 5 years of 12 GeV running These represent less than half of the anticipated running time Lab management agrees with the PAC that this represents input to the scheduling process

11 PAC41 Results Please read the report carefully, and keep in mind that this is guidance for scheduling. Nothing really new here, only additional PAC input. It is extremely important for the Lab to realize a very high impact program early in the 12 GeV program. The PAC has done an admirable job of helping us to identify such potential components of this program. This will help us to optimize our resources for realizing scientific excellence at Jefferson Lab in both the shorter and longer terms.

12 PAC42 12 Scheduled for July 28-August 1 Proposals were due June 2 Charge: Review new proposals, previously conditionally approved proposals, and letters of intent for experiments that will utilize the 12 GeV upgrade of CEBAF and provide advice on their scientific merit, technical feasibility and resource requirements. Identify proposals with high-quality physics that, represent high quality physics within the range of scientific importance represented by the previously approved 12 GeV proposals and recommend for approval. Also provide a recommendation on scientific rating and beamtime allocation for proposals newly recommended for approval. Identify other proposals with physics that have the potential for falling into this category pending clarification of scientific and/or technical issues and recommend for conditional approval. Provide comments on technical and scientific issues that should be addressed by the proponents prior to review at a future PAC.

13 Other Recent Developments HPS funded by DOE HEP in FY15 - Install in FY14 - Hope for Scheduling in Hall B in FY15 PRad MRI funded. - Request for install in FY14/15 - Hope for Scheduling in Hall B in FY15 CLEO solenoid committed for SoLID project, final negotiations Decision by DOE-HEP re Babar DIRC for GlueX Hall B RICH detector reviewed September 5-6, DOE participation -very positive

14

15

16

LRP Plans Town meetings – joint RHI/Hadronic meeting as for 2007 DNP Executive Committee has appointed conveners (QCD: H. Gao and C. Roberts) Schedule and venue – TBA, likely early fall, east coast Town meeting white papers due in Dec Resolution meeting Jan-Feb 2015 Preliminary report to NSAC - March 2015

18 JLab LRP issues 12 GeV white paper from 2011 served us well, not seriously outdated – let’s not rewrite it! Perhaps a short update for PAC totals. EIC white paper being updated by writing group (mostly input from LHC program) Town meeting output can include both white papers, others from the rest of the community, and perhaps a short cover document. JLab community should support/contribute to - Nuclear Structure/Astrophysics - Fundamental Symmetries and Neutrinos LRP should recommend complete construction and begin full operations for new facilities – JLab12 and FRIB LRP should support MIE projects – MOLLER and SoLID LRP should recommendation construction of EIC

19 Summary & Outlook PAC -2 meetings in Special prioritization meeting NSAC LRP imminent – unified JLab community is essential for success.