ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
1 1 TPTF Review of Nodal Program Schedule Readiness to Send Schedule to TAC January 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal Timeline Options, TPTF Jul 11, Timeline Options Trip Doggett TPTF
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
COMS Nodal Commercial Systems Project Update COPs Meeting May 2007 By Bill Barnes and Justin Rasberry.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
July 7, 2008 TPTF Texas Nodal Market Implementation: - Program Update - Market Readiness Update Jerry Sullivan.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
February 12, 2009 ROS ERCOT and TSP activities for Planning Model Go-Live.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
October 8, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan Program Director, Market Redesign.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
August 11, 2008 Texas Nodal - Integrated Schedule Update Integrated Schedule Update for TPTF Janet Ply.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
April 1, 2008 TPTF Texas Nodal Market Implementation Program Update Jerry Sullivan.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
June 9 th, 2008 TPTF Texas Nodal Program: Market Readiness Metrics Update Mike Beck.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
COMS Nodal Commercial Systems Project TPTF Meeting September 2007 Raj Chudgar.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Presentation transcript:

ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08

ROS Meeting – 05/15/082Texas Nodal Program - TPTF Update Last month at TPTF / April 2008 During April 2008, TPTF met on:  March 31 – April 2 March 31 – April 2  April 21 – 22 April 21 – 22

ROS Meeting – 05/15/083Texas Nodal Program - TPTF Update Last month at TPTF / April 2008 Major Accomplishments / March 31 – April 2, 2008March 31 – April 2, 2008  Endorsement of NPRRs:  On April 1, TPTF endorsed the following NPRRs to synchronize Zonal Protocols:  NPRR105, Section 23, Texas Test Plan Team – Retail Market Testing NPRR105  NPRR106, Section 24, Retail Point-to-Point Communications NPRR106  NPRR109, Section 18, Load Profiling NPRR109  NPRR110, Section 20, Alternative Dispute Resolution Procedure NPRR110  Note: PRS recommended these NPRRs for approval on April 18

ROS Meeting – 05/15/084Texas Nodal Program - TPTF Update Last month at TPTF / April 2008 Major Accomplishments / April 21 – 22, 2008:April 21 – 22, 2008 Early Delivery Systems (EDS) Project:  On April 21, TPTF endorsed NPRR119, Resource Limit CalculatorNPRR119  NPRR119 revises the Low-Dispatch Limit (LDL) equation in Nodal Protocols Section (8) to ensure that the LDL and High- Dispatch Limit (HDL) passed to Security Constrained Economic Dispatch (SCED) do not exceed the High-Sustained Limit (HSL) under any circumstance  On April 21, TPTF approved the EDS 3 Load Frequency Control (LFC) Testing Market Participant Handbook v1.02  v1.02 of the handbook revises the completion criteria for the Area Control Error (ACE) verification to account for differences in scan rates between the zonal and nodal software. The handbook criteria is synchronized with metric EMO5, Verify ACE Performance.  On April 21, TPTF endorsed the results of the seven-day ACE comparison (see Key Documents for the meeting) per metric EMO5

ROS Meeting – 05/15/085Texas Nodal Program - TPTF Update Last month at TPTF / April 2008 Major Accomplishments / April 21 – 22, 2008 (cont’d):April 21 – 22, 2008 Program Management Office (PMO):  On April 21, TPTF endorsed:  revisions to metric E8, ERCOT Staffed for Texas Nodal Operations  revisions to metric EMO5, Verify ACE Performance  the new metric MP20, Market Participant Ability to Submit Outage - Connectivity Test (MP20 measures the ability of Market Participants to submit Outages to the Nodal Outage Scheduler during EDS 4 Release 9.2 testing) Note: Metrics E8, EMO5, and MP20 were approved by TAC on May 8 Visit Nodal Metrics on the Nodal Transition Readiness CenterNodal Metrics

ROS Meeting – 05/15/086Texas Nodal Program - TPTF Update Last month at TPTF / April 2008 Major Accomplishments / April 21 – 22, 2008 (cont’d):April 21 – 22, 2008 Other—Endorsement/Approval of:  On April 22, TPTF approved the final set of changes recommended by the Day-Ahead Market (DAM) Subgroup to incorporate the Market Management System (MMS) functionality for co-optimizing self- committed units in DAM. The changes affect the MMS DAM and Supplemental Ancillary Service Market (SASM) Requirements (B2) v2.0. TPTF assigned the functionality a preliminary status of “needed for go-live” and requested that ERCOT would conduct a cost/schedule impact analysis for incorporating the changes. The TPTF requested that the MMS team would report its results back to TPTF no later than May 15, The details of the report are scheduled for discussion during the upcoming May TPTF meeting.May  On April 22, TPTF approved revisions to Section 2 of the Commercial Systems (COMS) White Paper - Details on the Settlement of Combined Cycle Plants.

ROS Meeting – 05/15/087Texas Nodal Program - TPTF Update This month at TPTF / May 2008 During May 2008:  TPTF held a WebEx to discuss the Single-Entry Model Milestone on May 1May 1  TPTF met on May 5 – 7May 5 – 7  TPTF will meet again on May 22 – 23May 22 – 23

ROS Meeting – 05/15/088Texas Nodal Program - TPTF Update This month at TPTF / May 2008 WebEx - Single-Entry Model Milestone/ May 1, 2008:May 1, 2008 On May 1, ERCOT and Market Participants held a WebEx meeting to discuss the Single-Entry Model (SEM) Milestone, including:  The go-live date for the Single-Entry Model (SEM), which was recently moved from June 2 to July 14 owing to defects for Network Model Management System (NMMS) and delays for the Energy Management System (EMS) Common Information Model (CIM) Importer  The criteria for achieving the SEM Milestone  Market Participant Concerns

ROS Meeting – 05/15/089Texas Nodal Program - TPTF Update This month at TPTF / May 2008 WebEx – SEM Milestone/ May 1, 2008 (cont’d):May 1, 2008 On May 1, ERCOT and Market Participants discussed the following criteria for achieving the SEM Milestone:  Establish a complete and consistent Nodal Model by:  Confirming the ability to import NMMS ERCOT CIM  Successfully executing EMS applications  Confirming comparison of the Nodal Network Operations Model (NOM) to the Zonal NOM  Deploy the NMMS tool to production  Complete the NMMS Market Trials/ confirm ability of Transmission Service Providers (TSPs) to submit NOM Change Requests (NOMCRs)  Resolve any Severity Level 1 and 2 defects affecting NMMS Note: During the WebEx, it was noted that the SEM Milestone criteria do not include error-free CIM exchanges or requests for the Planning Model because these aspects are to be developed iteratively following go-live for the SEM.

ROS Meeting – 05/15/0810Texas Nodal Program - TPTF Update This month at TPTF / May 2008 WebEx – SEM Milestone/ May 1, 2008 (cont’d):May 1, 2008 On May 1, ERCOT and Market Participants discussed the following concerns:  Market Participants will be non-compliant with applicable Nodal Protocols when Section 3 becomes effective in July 2008 per the Nodal Protocol Transition PlanNodal Protocol Transition Plan  TSPs expect to need more time to verify/synchronize the NOM with their systems than what will be provided between SEM go-live and the 168-Hour Test  Market Participants are concerned that the delayed SEM Milestone could affect the Texas Nodal Market Implementation Date Note: On May 8, TAC requested that a meeting be scheduled to address the above concerns and to establish a common understanding between ERCOT and Market Participants regarding what entails NOM validation.May 8 These issues will be discussed at the NDSWG on May 20.May 20

ROS Meeting – 05/15/0811Texas Nodal Program - TPTF Update This month at TPTF / May 2008 Major Accomplishments / May 5 – 7, 2008:May 5 – 7, 2008  Endorsement of NPRRs:  On May 5, TPTF endorsed:  NPRR 117, Resource Registration Clarification NPRR 117  NPRR123, Inadvertent Energy Account Revision NPRR123  On May 5, TPTF endorsed:  NPRR107, Nodal Emergency Interruptible Load Service (EILS) NPRR107  NPRR111, Timelines for Response by ERCOT to Transmission Service Provider (TSP) Requests NPRR111  NPRR118, Synchronization of Zonal Protocols for Section 14 NPRR118  On May 7, TPTF endorsed:  NPRR120, Corrections and Clarifications for Real-Time Settlements NPRR120  NPRR122, Simplify Ancillary Services Settlement Formulas NPRR122  Draft NPRR, CRR Settlements Revenue Equalization (this draft NPRR has been posted as NPRR130)NPRR130

ROS Meeting – 05/15/0812Texas Nodal Program - TPTF Update This month at TPTF / May 2008 Upcoming Agenda Items / May 22 – 23, 2008:May 22 – 23, 2008 Nodal Program Updates:  Nodal Program Update/ Nodal Timeline Update  PMO Readiness Update  Quality Center Update Nodal Project Updates:  Infrastructure (INF) Update  Discuss Critical Cyber Assets (CCAs) and Critical Infrastructure Protection (CIP) training  Review disposition of comments for the INF Market Participant Identity Management (MPIM) Requirements v3.2

ROS Meeting – 05/15/0813Texas Nodal Program - TPTF Update This month at TPTF / May 2008 Upcoming Agenda Items / May 22 – 23, 2008 (cont’d):May 22 – 23, 2008 Nodal Project Updates (cont’d):  EDS Update:  Review disposition of comments for the Texas Nodal Market Go- Live Procedure v0.06  Review disposition of comments for the EDS Emergency Operations Test Plan v0.01  MMS Update  Discuss vendor impact studies to incorporate changes for:  co-optimization of self-committed Resources in DAM  NPRR102, Implementation of PUC Subst. R (f), Publication of Resource and Load Information NPRR102

ROS Meeting – 05/15/0814Texas Nodal Program - TPTF Update This month at TPTF / May 2008 Upcoming Agenda Items / May 22 – 23, 2008 (cont’d):May 22 – 23, 2008 Other Agenda Items:  Market Rules Update  Review comments for recently "nodalized" protocol sections:  NPRR114, Section 11, Data Acquisition and Aggregation NPRR114  NPRR126, Section 19, Texas Standard Electronic Transaction NPRR126  NPRR129, Section 15, Customer Registration NPRR129  Review disposition of comments for NOGRRs  NOGRR018- Synchronization of OGRR204, Hotline Technology Update * NOGRR018  NOGRR019- Synchronization of OGRR206, Black Start Satellite Phones * NOGRR019 * Note: During the May 5-7 meeting, TPTF requested the opportunity to comment on “nodalizations” of the Operating Guides.

ROS Meeting – 05/15/0815Texas Nodal Program - TPTF Update This month at TPTF / May 2008 Upcoming Agenda Items / May 22 – 23, 2008 (cont’d):May 22 – 23, 2008 Other Agenda Items:  Review Draft NPRR Language for Outage file formats for the  Network Operations Model, Section (a)  Annual Planning Model, Section (3)  CRR Network Model, Section (5)  Review NPRR124, Resource Node Updated Definitions, and discuss whether the existing Nodal Protocol definition for Resource Node should be revised to incorporate descriptions of specific Resource Node typesNPRR124  NPRR128, Combined-Cycle Power Blocks with Multiple Voltage Interconnections NPRR128  Review draft NPRR to clean up Section 7 for Flowgate Settlements  This draft NPRR adds clarifications to the flowgate definition and related settlement formulae.

ROS Meeting – 05/15/0816Texas Nodal Program - TPTF Update Future TPTF Meetings / June 2008 Future TPTF Meetings / June 2008:  June 9 – 10, 2008  June 23 – 25, 2008

ROS Meeting – 05/15/0817Texas Nodal Program - TPTF Update Questions? Please direct questions or comments to: Stacy Bridges