IntelliDriveSM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation.

Slides:



Advertisements
Similar presentations
IntelliDrive Safety Workshop July 20, 2010 Ray Resendes US Department of Transportation National Highway Traffic Safety Administration IntelliDrive Vehicle-toVehicle.
Advertisements

Overview What is the National ITS Architecture? User Services
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Certification Pilot May 5, 2010 Walton Fehr US Department of Transportation ITS Joint Program Office IntelliDrive Connectivity and the Future of Surface.
Response, Emergency Staging, Communications, Uniform Management, and Evacuation (R.E.S.C.U.M.E.) NWTC Session 2C: Incident Management Kevin Dopart, Noblis.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
1 IntelliDrive SM IntelliDrive SM for Transit 101 ITS America Annual Meeting May 4, 2010 Jeffrey L. Spencer FTA.
Connected Vehicles AASHTO Annual Meeting | October 17, 2013 | Denver, CO Mike Cammisa Director, Safety Association of Global Automakers.
ITS Joint Program Office 62 nd Illinois Traffic Engineering and Safety Conference October 24, 2013 Walton Fehr.
Original vision for Vehicle Infrastructure Integration (VII):
IntelliDrive Safety Workshop July 20, 2010 Alrik L. Svenson US Department of Transportation National Highway Traffic Safety Administration IntelliDrive.
Connected Vehicles: The Future of Transportation Safety and Efficiency.
Five Year ITS Strategic Plan (2010 – 2014)
Urban landbuilding facilitiestransportation networkssystems technology National and Regional ITS Architectures Bart Cima, IBI Group February 26, 2007.
Human Factors Research Issues for Cooperative Intersection Collision Avoidance Systems (CICAS) Vicki Neale, Ph.D. Director, Center for Vehicle-Infrastructure.
Cooperative Intersection Collision Avoidance Systems Initiative May 2005, ITS America Annual Meeting Mike Schagrin ITS Joint Program Office U.S. Department.
Advancing Safety Through Innovation University Transportation Centers Safety Summit March 19-20, 2015 Jeffrey Onizuk Intelligent Transportation System.
Mike Schagrin Program Manager, Connected Vehicle Safety & Automation ITS Joint Program Office Research and Innovative Technology Administration September.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
IntelliDrive Policy and Institutional Issues Research Valerie Briggs Team Lead, Knowledge Transfer and Policy, ITS Joint Program Office, RITA May 4, 2010.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
FHWA Office of Operations Research and Development and American Association of State Highway and Transportation Officials (AASHTO) AASHTO National Connected.
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
Meeting of State Pooled Fund Partners April 20, 2005 "Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision.
Roadway Safety Panel How can ITS assist in bridging vehicle technology with roadway design and function?
IntelliDrive SM Strategic Plan 2009 Ted Trepanier SSOM – SCOTE Manchester The IntelliDrive SM logo is a service mark of the U.S. Department of Transportation.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
Commercial Motor Vehicle Connectivity V2I Communications & Safety Pilot Participation Cem Hatipoglu, PhD Transportation Specialist, FMCSA, Technology Division.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
IntelliDrive Research Signal Phase & Timing (SPaT) and Related Messages Edward Fok Office of Technical Service San Francisco.
Mike Schagrin US Department of Transportation ITS Joint Program Office IntelliDrive Safety Program Overview.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
IntelliDrive SM Vehicle Safety Communications Working Toward V2V Deployment John Harding July 20, 2010.
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology September 25, 2013 Deborah.
1 IntelliDrive SM Connectivity − the Future of Surface Transportation June 7, 2010 AASHTO Subcommittee on Highway Transport Kate Hartman Research and Innovative.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
IntelliDriveSM Update
May, 2005ITS America 2005Slide 1 Integrated Vehicle Based Safety Systems Jack Ference, IVBSS Technical Manager ITS America Annual Meeting May, 2005.
IHRA-ITS UN-ECE WP.29 ITS Informal Group Geneva, March, 2011 Design Principles for Advanced Driver Assistance Systems: Keeping Drivers In-the-Loop Transmitted.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
Research Elements of Integrated Vehicle Based Safety Systems Jack Ference, IVBSS Technical Manager ITS America Annual Meeting May, 2005.
IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation.
Five Year ITS Strategic Plan (2010 – 2014). 2 U.S. Department of Transportation Research and Innovative Technology Administration Overall ITS Community.
IntelliDrive Safety Workshop July 20, 2010 Stephanie C. Binder National Highway Traffic Safety Administration US Department of Transportation Human Factors.
Implementation: Results from the Using Your Regional ITS Architecture Peer Exchange Network Workshop Mac Lister FHWA Resource Center ITS America Annual.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
USDOT’s IntelliDrive Program Smart Roadside Initiative – How it Fits.
Driver-Vehicle Interface Design Principles Chris Monk September 24, 2013.
1 Integrated Vehicle-Based Safety Systems Initiative Jack Ference United States Department of Transportation 2006 ITS World Congress 8-12 October 2006.
Cooperative Intersection Collision Avoidance Initiative ITS JPO Lead: Mike Schagrin Technical Lead: Morris Oliver, Office of Safety.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
Valerie Briggs Team Lead, Knowledge Transfer and Policy ITS Joint Program Office, USDOT April 10, 2013 Inputs to USDOT’s ITS Strategic Research Plan,
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
DSRC and SPaT, SSM, SRM & MAP
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
U.S. DOT Automated Vehicle Policy Activities ITS PCB T3 Webinar The National Transportation Systems Center U.S. Department of Transportation Office of.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
Smart Columbus Overview
Vehicle to Infrastructure Deployment Coalition (V2I DC) & SPaT Challenge Overview January 8, 2017.
FHWA Bicycle and Pedestrian Program
Mike Schagrin ITS Joint Program Office
IntelliDriveSM Connectivity and the Future of Surface Transportation
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology Deborah Curtis
Connected Vehicle Reference Implementation Architecture (CVRIA)
Presentation transcript:

IntelliDriveSM Vehicle to Infrastructure Connectivity for Safety Applications Monique Evans Director, FHWA Office of Safety RD&T U.S. Department of Transportation IntelliDrive Safety Workshop Chicago, IL July , 2010 IntelliDrive is a service mark of the U.S. Department of Transportation

2 Presentation Overview Focus of V2I Safety Detailed presentation of the roadmap activities o Highlight Key Objectives and Major Outcomes Prepare for later Breakout discussion

3 Acknowledgements Mike Schagrin, RITA Gregory Davis, FHWA Deborah Curtis, FHWA Edward Fok, FHWA James Arnold, FHWA Carl K. Andersen, FHWA Bernadine Victor-Taylor, Noblis

Click to edit the outline text format Second Outline Level  Third Outline Level Fourth Outline Level  Fifth Outline Level  Sixth Outline Level  Seventh Outline Level  Eighth Outline Level Ninth Outline LevelClick to edit Master text styles Safer Driving in the V2I Environment Signal Phase and Timing Instrumented Roadside Equipped Vehicles Aftermarket or Retrofit Devices Greater situational awareness Your vehicle can “see” nearby vehicles and knows roadway conditions you can’t see Reduce or even eliminate crashes thru: Driver Advisories Driver Warnings Focus is DSRC 5.9 GHz and crash prevention Communication can be to or from vehicle, infrastructure, and/or nomadic/aftermarket devices All vehicle types and pedestrians will be considered

5 V2I Safety Focus Areas Intersections Speed Management Run-off road and lane departure Enforcement and Operational Safety for Commercial Vehicles and Transit

6 V2I Safety Research Plan Track 1 – Applications Analysis Selection of Safety Applications (January 2011). Track 2 – Prototype Development Develop concept of operations, application requirements, and design, build and test applications. Track 3 – Infrastructure Communications/Interoperability Test and evaluate SPaT, issue SPaT Policy Guidance (2Q 2013)*. Test and evaluate Mapping and Positioning solutions. Test and Evaluate Communication Requirements. Track 4 – Benefits Assessment Perform FOTs based on selected safety applications. Analyze data for measuring safety benefits. Track 5 – Deployment Planning (ongoing) Development of Public Agency Guidelines and a Toolbox for practitioners.

Mode Specific Deployment Recommendations V2I Safety Applications Roadmap – Draft July 12, 2010 CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Track 5 Deployment Planning Track 1 Applications Analysis Track 2 Prototype Development Track 3 Infrastructure Communications & Interoperability Track 4 Benefits Assessment Smart Roadside ConOps & Apps Prototype Crash Factors Migration SPaT Prototype RG&I Trade Study Benefit & Risk Analysis Define Public Agency Reqs Positioning Prototype FOT Buildup/ Simulation Plans Multi-modal FOT(s)/Simulations Test and Evaluation Phase 1 SLTA FOT Selections FOT(s) & Simulation Analysis Prototype Applications Final SPAT Interface Definition & Policy Guidance Smart Roadside Analysis Analysis & Selection of Initial Applications SPaT I/F Definition Public Agency Guidelines and Specifications (“toolbox”) Mapping Prototype Infrastructure Study/Footprint Analysis CICAS-SLTA Go/No Go Decision Transit Analysis V2I Security Reqs Transit ConOps Safety ConOps Analyses for Future Applications CY Q2Q4Q 3Q Phase 2 SLTA IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Application Cert Reqs Toolbox Review V2I Roadmap Review ConOps Review Requirements Review Major Milestones Stakeholder Engagement Opportunities SPaT I/F Review Initial Applications SelectionFinal Applications Selection Integrated V2I Infrastructure System Comms Reqs Comms TS

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Crash Factors Migration Phase 1 SLTA Smart Roadside Analysis Analysis & Selection of Initial Applications CICAS-SLTA Go/No Go Decision Transit Analysis Analyses for Future Applications CY Q2Q4Q 3Q Phase 2 SLTA Initial Applications Selection TRACK 1 – Applications Analyses Key objective: Determine high value safety applications for initial V2I safety deployment. Major outputs: A set of applications that will be further developed in Track 2. Items to be covered: Status of CICAS-SLTA Multimodal Applications Analyses Selection of Safety V2I Applications Final Applications Selection Track 1 Applications Analysis V2I Safety Applications Roadmap – Draft July 12, 2010

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Crash Factors Migration Phase 1 SLTA Smart Roadside Analysis Analysis & Selection of Initial Applications CICAS-SLTA Go/No Go Decision Transit Analysis Analyses for Future Applications CY Q2Q4Q 3Q Phase 2 SLTA Cooperative Intersection Collision Avoidance System – Signalized Left Turn Assist (CICAS-SLTA): Investigate how to warn drivers when it is unsafe to make a left turn on a permissive green at signalized intersections. o Phase 1 – Warning algorithm o Go/No Go Decision – Is algorithm effective & reliable? o Phase 2 - Develop prototype & determine feasibility for implementation. Initial Applications SelectionFinal Applications Selection Track 1 Applications Analysis V2I Safety Applications Roadmap – Draft July 12, 2010

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Crash Factors Migration Phase 1 SLTA Smart Roadside Analysis Analysis & Selection of Initial Applications CICAS-SLTA Go/No Go Decision Transit Analysis CY Q2Q4Q 3Q Phase 2 SLTA Multimodal Applications Analyses: Crash Factors Study – What crash types can V2I reduce or mitigate? Migration Study – What do we have that can be moved to V2I? Transit Analysis – What about transit issues? Smart Roadside Analysis – What is the status of the Smart Roadside Infrastructure for Commercial Vehicle Operations? Initial Applications SelectionFinal Applications Selection Track 1 Applications Analysis V2I Safety Applications Roadmap – Draft July 12, 2010 Analyses for Future Applications

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Crash Factors Migration Phase 1 SLTA Smart Roadside Analysis Analysis & Selection of Initial Applications CICAS-SLTA Go/No Go Decision Transit Analysis CY Q2Q4Q 3Q Phase 2 SLTA Multimodal Applications Analyses: Crash Factors Study – What crash types can V2I reduce or mitigate? Migration Study – What do we have that can be moved to V2I? Transit Analysis – What about transit issues? Smart Roadside Analysis – What is the status of the Smart Roadside Infrastructure for Commercial Vehicle Operations? Initial Applications SelectionFinal Applications Selection Track 1 Applications Analysis V2I Safety Applications Roadmap – Draft July 12, 2010 Analyses for Future Applications

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Crash Factors Migration Phase 1 SLTA Smart Roadside Analysis Analysis & Selection of Initial Applications CICAS-SLTA Go/No Go Decision Transit Analysis CY Q2Q4Q 3Q Phase 2 SLTA Final Applications Selection Analysis and Selection of Applications: An iterative process among the US DOT and Stakeholders. o Formula to be developed by FHWA Stakeholder Engagement Opportunity – Develop an initial list of potential applications for early implementation. Stakeholder Engagement Opportunity – Selection of V2I safety applications that show the most promise of having a positive cost/benefit ratio for deployment. Initial Applications Selection Track 1 Applications Analysis V2I Safety Applications Roadmap – Draft July 12, 2010 Analyses for Future Applications

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Smart Roadside ConOps & Apps Prototype FOT Selections Prototype Applications Transit ConOps Safety ConOps CY Q2Q4Q 3Q ConOps ReviewRequirements Review TRACK 2 – Prototype Development Key objective: Develop and validate prototypes of high value cooperative safety applications that will be field tested in Track 4. Major outputs: Prototype applications ready for integration with infrastructure components and the vehicle components. Items to be covered: Multimodal Concepts of Operations Development of Prototype Applications Track 2 Prototype Development V2I Safety Applications Roadmap – Draft July 12, 2010

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Smart Roadside ConOps & Apps Prototype FOT Selections Prototype Applications Transit ConOps Safety ConOps CY Q2Q4Q 3Q ConOps ReviewRequirements Review Concept of Operations: Develop Smart Roadside and Transit Concepts of Operations. Develop Safety Concept of Operations. Stakeholder Engagement Opportunity – Review of Initial Safety Concept of Operations. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 2 Prototype Development

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Smart Roadside ConOps & Apps Prototype FOT Selections Prototype Applications Transit ConOps Safety ConOps CY Q2Q4Q 3Q ConOps ReviewRequirements Review Concept of Operations: Develop Smart Roadside and Transit Concepts of Operations. Develop Safety Concept of Operations. Stakeholder Engagement Opportunity – Review of Initial Safety Concept of Operations. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 2 Prototype Development

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Smart Roadside ConOps & Apps Prototype FOT Selections Prototype Applications Transit ConOps Safety ConOps CY Q2Q4Q 3Q ConOps ReviewRequirements Review Development of Prototype Safety Applications: Stakeholder Engagement Opportunity – Prototype Applications Requirements Review and Input Selection of Applications for Field Operational Tests V2I Safety Applications Roadmap – Draft July 12, 2010 Track 2 Prototype Development

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Integrated V2I Infrastructure System Mapping Prototype V2I Security Reqs CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review TRACK 3 – Infrastructure Communications & Interoperability Key objective: Provide the critical technology underpinnings that allow safety applications to be deployed nationally. Major outputs: Integrated V2I Infrastructure System needed for exchange of useful data and information. Items to be covered: Definition of SPaT Interface and Policy Guidance Infrastructure Systems Interoperability and Communications Integrated V2I Infrastructure System (Reference Implementation) Applications Certification Requirements V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Comms Reqs Comms TS

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Definition of SPaT Interface and Policy Guidance: Develop SPaT Prototype o Stakeholder Engagement Opportunity – Review initial concept for SPaT Interface o Initial definition of SPaT Interface Test and Evaluation of SPaT Prototype o Final SPaT Interface Definition & Policy Guidance V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Integrated V2I Infrastructure System Comms Reqs Comms TS

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Comms Reqs Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs Comms TS CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Infrastructure Systems Interoperability and Communications: Roadway Geometry and Inventory (RG&I) Trade Study. Geometric Roadway Map (Mapping) Prototype. Positioning Prototype. Communications Trade Study. Communications Requirements. V2I Security Requirements. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Integrated V2I Infrastructure System

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Comms Reqs Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs Comms TS CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Infrastructure Systems Interoperability and Communications: Roadway Geometry and Inventory (RG&I) Trade Study. Geometric Roadway Map (Mapping) Prototype. Positioning Prototype. Communications Trade Study. Communications Requirements. V2I Security Requirements. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Integrated V2I Infrastructure System

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Comms Reqs Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs Comms TS CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Infrastructure Systems Interoperability and Communications: Roadway Geometry and Inventory (RG&I) Trade Study. Geometric Roadway Map (Mapping) Prototype. Positioning Prototype. Communications Trade Study. Communications Requirements. V2I Security Requirements. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Integrated V2I Infrastructure System

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Integrated V2I Infrastructure System (Reference Implementation): Integration of system requirements. o Consolidate outputs from SPaT, positioning, mapping, communications and security. o Produce format to enable applications. o Serve as “reference implementation.” V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Comms Reqs Comms TS Integrated V2I Infrastructure System

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q SPaT Prototype RG&I Trade Study Positioning Prototype Test and Evaluation Final SPAT Interface Definition & Policy Guidance SPaT I/F Definition Mapping Prototype V2I Security Reqs CY Q2Q4Q 3Q Application Cert Reqs SPaT I/F Review Applications Certification Requirements: Ensure applications meet requirements of IntelliDriveSM Program. A systems approach to certification of applications. This is NOT an equipment certification process. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 3 Infrastructure Communications & Interoperability Integrated V2I Infrastructure System Comms Reqs Comms TS

Mode Specific Deployment Recommendations CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Benefit & Risk Analysis FOT Buildup/ Simulation Plans Multi-modal FOT(s)/Simulations FOT(s) & Simulation Analysis CY Q2Q4Q 3Q V2I Safety Applications Roadmap – Draft July 12, 2010 TRACK 4 – Benefits Assessments Key objective: Conduct field operational tests and simulations. Major outputs: Reports covering cost-benefit analyses and the associated potential risks for deployment of V2I safety applications. Items to be covered: Prototype Application Evaluations Benefit & Risk Analyses Track 4 Benefits Assessment

Mode Specific Deployment Recommendations CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Benefit & Risk Analysis FOT Buildup/ Simulation Plans Multi-modal FOT(s)/Simulations FOT(s) & Simulation Analysis CY Q2Q4Q 3Q V2I Safety Applications Roadmap – Draft July 12, 2010 Prototype Applications Evaluations: Field Operational Tests (FOT) & Simulation Analysis. Field Operational Tests (FOT) & Simulation Planning and Build-up. Conduct Multi-modal Field Operational Tests (FOT) & Simulations. Track 4 Benefits Assessment

Mode Specific Deployment Recommendations CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Benefit & Risk Analysis FOT Buildup/ Simulation Plans Multi-modal FOT(s)/Simulations FOT(s) & Simulation Analysis CY Q2Q4Q 3Q V2I Safety Applications Roadmap – Draft July 12, 2010 Prototype Applications Evaluations: Field Operational Tests (FOT) & Simulation Analysis. Field Operational Tests (FOT) & Simulation Planning and Build-up. Conduct Multi-modal Field Operational Tests (FOT) & Simulations. Track 4 Benefits Assessment

Mode Specific Deployment Recommendations CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Benefit & Risk Analysis FOT Buildup/ Simulation Plans Multi-modal FOT(s)/Simulations FOT(s) & Simulation Analysis CY Q2Q4Q 3Q V2I Safety Applications Roadmap – Draft July 12, 2010 Benefit & Risk Analyses: Benefit & Risk Analysis. o Develop an understanding of costs and risks. o Identify potential unintended consequences of an application. o Create framework for deployment recommendations. Mode Specific Deployment Recommendations. Track 4 Benefits Assessment

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Track 5 Deployment Planning Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) Infrastructure Study/Footprint Analysis CY Q2Q4Q 3Q IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Toolbox Review V2I Roadmap Review TRACK 5 – Deployment Planning Key objective: Develop tools and guidelines that will aid practitioners in making sound decisions on how to plan, deploy, operate, and maintain V2I systems. Major outputs: Public Agency Guidelines and Specifications (“Toolbox”) Items to be covered: Infrastructure Study / Footprint Analysis Definition of Public Agency Requirements Development of Public Agency Guidelines and Specifications – Toolbox V2I Safety Applications Roadmap – Draft July 12, 2010

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) Infrastructure Study/Footprint Analysis CY Q2Q4Q 3Q IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Toolbox Review V2I Roadmap Review Infrastructure Study / Footprint Analysis: Iterative study that will assess the infrastructure requirements to enable successful deployment of IntelliDriveSM safety applications. Major Milestone – Initial Infrastructure Assessment Major Milestone – Infrastructure Assessment Update V2I Safety Applications Roadmap – Draft July 12, 2010 Track 5 Deployment Planning

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) Infrastructure Study/Footprint Analysis CY Q2Q4Q 3Q IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Toolbox Review V2I Roadmap Review Define Public Agency Requirements: Determine what practitioners need to make an IntelliDriveSM deployment decision. Define the requirements that satisfy those needs. V2I Safety Applications Roadmap – Draft July 12, 2010 Track 5 Deployment Planning

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) Infrastructure Study/Footprint Analysis CY Q2Q4Q 3Q IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Toolbox Review V2I Roadmap Review Public Agency Guidelines and Specifications: Produce a “Toolbox” consisting of planning guides; operations and maintenance processes and procedures; and manuals and installation guides for implementation of V2I. Stakeholder Engagement Opportunity – Review and feedback on proposed “Toolbox.” V2I Safety Applications Roadmap – Draft July 12, 2010 Track 5 Deployment Planning

CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q CY Q2Q3Q4Q Track 5 Deployment Planning Define Public Agency Reqs Public Agency Guidelines and Specifications (“toolbox”) Infrastructure Study/Footprint Analysis CY Q2Q4Q 3Q IntelliDrive Principles Defined Initial Infrastructure AssessmentInfrastructure Assessment Update Toolbox Review V2I Roadmap Review Important Items: IntelliDriveSM Principles Defined: Completed in 4th Quarter Stakeholder Engagement Opportunity – Review of Draft V2I Roadmap. July 22, 2010 Breakout Session. —PLEASE ATTEND— V2I Safety Applications Roadmap – Draft July 12, 2010

33 Breakout Questions 1. Are the research activities adequate to achieve our objective in each track? 1. Do you foresee any technical issues that may pose a challenge in order to get the work done? 1. Do you foresee any policy issues that may pose a challenge in order to get the work done?