Alice overview New detector and chamber ALICE TC.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Status of the ATLAS MM project
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The SVT in STAR The final device…. … and all its connections … and all its connections.
1 Installation of Delphi Frame  ITS Installation.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Tracking Integration Challenges Y. meeting 2013/9/25.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Installation Review March ‘03 L.Simonetti – INFN Torino 1 ITS - FWD - beam pipe installation  Elements considered ITS (=SPD+SDD+SSD), FWD (=V0 R, T0 R,
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
BPM support and beam pipe length FD support status A.Jeremie.
Muon-raying the ATLAS Detector
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
ATLAS micromegas activities (MAMMA)
LEPP meeting Dan Peterson ILC highlights : Development of a TPC for the ILD detector at the ILC There are some significant differences between.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Marian Ivanov TPC ExB and V drift calibration and alignment.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
ALICE Arturo Tauro Werner Riegler.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Mechanical layout, services and integration R. Santoro On behalf of the ITS upgrade WG4.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
October 2014Silicon Pixel Tracker – Chris Damerell 1 Tracking sensor, one of 12,000, 8x8 cm 2, 2.56 Mpixels each Matching endcaps (only one layer shown)
Alignment of the CMS Tracker
Tracking detectors/2 F.Riggi.
Bunching system for SPES project
Laser calibration systems
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Preliminary Y-chamber specifications – First draft
LHC Experimental Vacuum Systems Status October ‘07
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
LHCC Upgrade Session, 12 March 2013
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Changes to SiD since the DBD
Need for Alignment Position of off-momentum proton w.r.t. beam
Upgrade Strategy for the Experimental Vacuum Systems
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Update on GEp GEM Background Rates
New ATLAS VI Mechanical Tolerances and Aperture Approvals
(with R. Arcidiacono, A. Solano)
Challenges for FCC-ee MDI mechanical design
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
Presentation transcript:

Alice overview New detector and chamber ALICE TC

The ALICE smaller diameter beampipe ALICE wants to install a new beampipe in LS2. The reason is to build a new silicon tracker with greatly improved features in terms of determination of the distance of closest approach to the primary vertex, tracking efficiency at low transverse momenta, and read-out rate capabilities. First request in LEB meeting Several options evaluated since then: outer diameter 3.4cm to 4cm, and wall thickness down to 500um. The TDR for new ITS has recently been submitted to LHCC, and presented at the LHCC week the 2 nd of December. Another detector, the MFT, has in the meantime been approved. New beampipe ready for final LEB submission: Outer diameter: 3.6cm (6cm now) and wall thickness of 0.8mm Length: 550cm (+68cm wrt present pipe) Bellows and flanges in Al (instead of SS) Remote bakeout LEB 16/12/13Alice overview- New detector and chamber2

LEB 16/12/13Alice overview- New detector and chamber3 Present central beampipe IP Fixation Points ALICE can align the beampipe – this was already done in 2008 to compensate a sag of support structures due to detector installation.

MINI FRAME DELPHI FRAME CAGE OUT CAGE IN Beam pipe connection Beam pipe in the Cage Beam pipe external support TPC 1) 2) 3) LEB 16/12/13Alice overview- New detector and chamber4

LEB 16/12/13Alice overview- New detector and chamber5 Detector/Service Barrel Beampipe new support Cage New layout

LEB 16/12/13Alice overview- New detector and chamber6 ALICE beam pipe central section, C-side MFT FIT ITS cage

ALICE beam pipe central section LEB 16/12/13Alice overview- New detector and chamber7

LEB 16/12/13Alice overview- New detector and chamber8 ALICE beam pipe central section

820 IP Central part C-side Al section A-side Al section Central Be part IP OD 36 Layout new ALICE central beampipe (LS2) V6 A-side section η=3.9 C-side section OD 60 OD 50 OD 43 α=15° All dimensions in mm. Wall thickness 800μm everywhere (bellow thickness 300μm) OD 60 Bellow OD56 α=15° Bellow OD56 OD α=15° Support#3 Support#1 Support# LEB 16/12/13Alice overview- New detector and chamber

QuantityCentral part (A)C-side part (B) Construction and deflection 0.6mm (1 0.5mm Mechanical adjustment precision 1.5mm (2 0.5mm Survey to beamline uncertainty 1.5mm (3 Quad fiducial to beamline uncertainty 0.5mm (3 L3 movement<0.5mm (4 B field movement<0.5mm<5mm Linear sum5.1mm8.5mm Alice overview- New detector and chamber10 1)LEB )LEB )LEB )LEB LEB 16/12/13 Tolerances A B

ALICE LEB 16/12/13Alice overview- New detector and chamber11 Injection energy

ALICE LEB 16/12/13Alice overview- New detector and chamber12 Injection energy min 13.1

Conclusions ALICE wants to install a new beampipe in LS2, with central section, 3.6cm OD and 88.8cm long, in Be The tolerances are 5.1mm (central part) and 8.5mm (C-side part) With these tolerances the n1 min (at injection) is around 13.1 sigma, and is located at the C-side of the pipe  to be confirmed by Massimo LEB 16/12/13Alice overview- New detector and chamber13