MT KEIRA PASS STABILISATION Wollongong City Council MT KEIRA PASS WORKS About 500m of rockfall hazard reduction works 180m of lower embankment anchoring.

Slides:



Advertisements
Similar presentations
Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving.
Advertisements

Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
22 nd Conference Roads and Works Asphalt Trial – Outcomes so far Rod Ellis Board Member IPWEA SA.
Failure Case Study of Construction at a Solid Waste Site K. Madhavan, Ph.D., P.E., Dept. of Civil & Env. Engineering Christian Brothers University Memphis,
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Properties of Asphalt Important properties of asphalt include: Adhesion Consistency Specific Gravity Durability Rate of curing Ductility Aging and.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
HIGHWAY ENGINEERING AND TRAFFIC ENGINEERING CENG 95.
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Highway Engineering Code No. (CM 304) Lec. 2. What is Road Cross-Section Elements?
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Dump Point Safety Prepared by
Earth and Rockfill Dams
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Elm Street Rockslide Repairs Montpelier City Council Meeting February 22, 2006.
By the end of the lesson I should know:
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Ultra Thin Continuously Reinforced Concrete - Modelling &Testing under APT Louw Kannemeyer (SANRAL) Bryan Perrie (C&CI) Pieter Strauss (Consultant) Louw.
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Pavement Distresses Flexible Pavement
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
Pavement Analysis and Design
SESSION 8 Shoulder Considerations. Objectives Identify shoulder/edge support types Describe benefits of each type Discuss how edge support conditions.
AAPA 2011 Study Tour – Surface Treatments #1 Surface Treatments #1.
Geography revision guide By Billy Hewson. Contents page HAAC Processes HAAC Processes (Part 1) HAAC ProcessesHAAC Processes (Part 2) HAAC Processes HAAC.
Technical Services By Nathan Haaland.  Increase in Construction Costs  Asphalt  $350 to $735 per ton  Labor  3.6% increase  Inflation  13% increase.
Geo-Engineering In North Wales A Study of the A55 Between Chester and Anglesey.
LOW COST SURFACING APPROACHES IN ZIMBABWE CASE STUDY: Marondera - Musami Road Construction Project K. Mukura TRL Ltd.
Chapter C Cross Section (ANSWERS )
Mass Movement.
Mass Wasting Sculpturing Earth’s Landscape. What is Mass Wasting? The downslope movement of material under the influence of gravity May occur at rates.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Approach Road - Evaluation and Rating Technical Standards.
Engineering Presentation. Basic Soil Mechanics Soil type classification Gravel, sand, silt, clay Soil strength classification Granular soils (sand and.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Treatments and Resets. PerformanceIndex CompositeIndex Triggers Treatments PerformanceModeling ExpressionsAndFilters Costs Resets Outputs GenerateStrategiesOptimize.
GEOTEXTILES IN TRANSPORTATION APPLICATIONS
BUILDING CONSTRUCTION ( ). 1. BHOL SUFIYAN [ ] 2. CHAVDA KRUNAL [ ] YEAR: 2 ND SEM: 3 RD CIVIL ENGINEERING DEPARTMENT PRESENTED.
Mass Movements.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
General Road Construction Information
Big French Creek Slide Timeline of Events
General Road Construction Information
FOUNDATIONS.
Approach Road Inspection and Rating
Know More About These Pavement Flaws
Presenters: Sumon Roy1 and Badrul Ahsan1
HIGHWAY MAINTENANCE Failures in flexible pavement.
Pavement condition index calculation
Introduction to Pavement Design
Always Advancing Pervious
Layer Thickness and Map Width
Weathering, Erosion, and Soil
Fred Carlton Field Turf Renovation
DO NOW Pick up notes and Review #32..
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Chapter 5.3 Mass Movements.
Chapter 5.3 Mass Movements.
Pavement Structural Analysis
Pavement Structural Analysis
Erosion Gravity Wins.
Pavement Overlay Design
Road Design Standards for LGED
Geometric design of Highways
Earth and Rock fill Dams
OLD CONCRETE MAKES WAY FOR NEW ASPHALT A Laatz, N Cocks, N Burger
Presentation transcript:

MT KEIRA PASS STABILISATION Wollongong City Council MT KEIRA PASS WORKS About 500m of rockfall hazard reduction works 180m of lower embankment anchoring and no fines concrete reconstruction Around 400m of asphalt and spray seal works 2100m2 of stabilisation, using lime slag

MT KEIRA PASS STABILISATION Rockfalls and Embankment Slumping PROBLEMS Ongoing rockfalls, anytime but particularly during heavy rain and storms Continuous slow creep of the road embankment due to fill weathering and settlement Narrow carriageway with poor sight distance increasing the risk to the road user (drivers, walkers and cyclists)

MT KEIRA PASS STABILISATION Investigation 20 boreholes were drilled for the design of the embankment works. The pavement was logged and later used in the design of the pavement stabilisation. Previous slump repairs consisted of repeated layers of deeplift asphalt, up to 650mm thick. Top of guardrail was lower than road crown prior to reconstruction. Geotechnical inspection of cliff face above road for the design and markup of rockfall measures Note slope of road (Landcruiser) compared to vertical drill rig – 14 degree camber, with radial tension cracking.

MT KEIRA PASS STABILISATION Construction Upper rockfall hazard reduction works underway, showing meshing, bolting and elevated 38kJ catch fencing installation Lower embankment works occurring concurrently, showing anchoring, meshing and concrete edge reconstruction. Note additional carriageway width (from 5.5m to 7.5m)

MT KEIRA PASS STABILISATION Stabilisation Works Premilling, crossblending and grading to shape – 300mm depth minimum. Grading and compaction of stabilised material into embankment edge. Spreading 5% of 30:70 lime slag binder, water addition and remilling. Final shape was achieved by grading to produce a 2% crossfall to the inside drain and left 30mm low for later AC works. Spray sealed 7/7/2014, getting ready for soft opening. AC scheduled for October.