Investment Project Construction of corn transloading terminal in the port Yuzhny.

Slides:



Advertisements
Similar presentations
Logo Add Your Company Slogan Tianjin Airport International Logistics Park Tianjin Airport Industrial Park Enterprise First Service First Efficiency First.
Advertisements

About New Oceanic New Oceanic LLC is one of the leading shipping and freight forwarding companies in UAE and the Middle East, we provide.
W W W. L S H. L V. The Background of our Logistics business starts in when Baltic states got independent. There was no private business practice,
SEE Port Development A Variation on the Story of the Rabbit and the Turtle Erich Cossutta, President Confindustria Serbia.
Limited Liability Company 2011 june. 1 Description of the location 2 Main characteristics 3 Capacity and technological process 4 Services 5 Prospects.
Returning to Our National Waterways Dabney Hegg U.S. Senate Committee on Commerce, Science and Transportation.
Ryszard Warzocha President of the Board PORT SZCZECIN-ŚWINOUJŚCIE Gate for Czech Republic adapted to the transport trends Szczecin and Świnoujscie SeaportsAuthority.
Restrictions LOA244 m Draught11 m Air Draught18 m.
Intermodal shortsea transport The motorway of the 21 st century Sander van ‘t Verlaat.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
Chuvash Republic – invitation to cooperation! 11.
Emerging Opportunities in Port Sector By A. K. Mohapatra Secretary, Department of Shipping, Ministry of Shipping, Road Transport &Highways.
Trailblazing! Welcome to InterRail TSES!
A free economic zone is manufacturing area designated for business development with tax benefits established by law.
Strategic development of inland waterway infrastructure
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA SPACES AND IN BLACK SEA REGION AS A WHOLE SPEAKER capt. Zhivko Petrov - Director of Directorate.
The Introduction of DUSHAN PORT. Competitive Rate DUSHAN Port Service AMASS DUSHAN AMASS trying to be the best freight company in DUSHAN Port based on.
JSC “MSCO” marine transportation of bulk and general cargoes and carriage of passengers and carriage of passengers marine transportation of hydrocarbons.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
Development Projects Construction of residential real estate in Kiev, Ukraine.
Investment Proposal Reclamation and development of Selyukhovskiy oilfield in Ukraine.
ASIA-EUROPE MEETING (ASEM) ASEM Symposium on Eurasia Transport and Logistics Network M. SOKOLOV MINISTER OF TRANSPORT OF THE RUSSIAN FEDERATION.
The Mississippi State Port Authority at Gulfport PORT OF GULFPORT 1 PORT OF GULFPORT EXPORT UNIVERSITY Presented by: Enrique Hurtado Juarez.
Investment proposal Block quarry of charnockite with existing permission for development.
Chair of Municipal hygiene and occupational health. Lecture on municipal hygiene for 5 courses Role and value of a street network in city planning.
TRACECA PROJECT «Development of the multi-modal complex in SE “SCPI” using the 3 rd basin of the Sukhoy estuary»
Investment Project Black Sea Ship-building Yard. 2 Key Information Public JSC “Black Sea Ship-building Yard” is one of the largest ship-building.
By Igor D. Kopylov Scientific Supervisor - Doctor of Economics, Professor Yury Y. Petrunya Dnipropetrovsk 2014.
Partnership proposal Joint participation in the project on extraction and processing of alkaline kaolin.
Presentation of investment projects of Kherson Sea Port.
Challenges for Dry Bulk Terminals in Developing Regions.
The presentation of the investment project proposition: The international airport «Priluki» Yalta June, 2009 м. Київ, вул. Мельникова, 81 тел/факс +38.
Администрация свободной экономической зоны «Гродноинвест» Тел Факс The TLC.
SOUTHERN REGION OF THE RUSSIAN FEDERATION ROSTOV-ON-DON.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Intermodal transport between Europe and Asia: opportunities and challenges of Latvia.
Deepwater district “North” Of Arkhangelsk sea-port The project has been approved by the Federal Agency of Sea and river transport of the Ministry of transport.
Deepwater district “North” Of Arkhangelsk sea-port The project has been approved by the Federal Agency of Sea and river transport of the Ministry of transport.
INDUSTRIAL AND COMMERCIAL ZONE KUKLEN BULGARIA. The purpose of the Zone is to create conditions for investors so they can organize their production, storage.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
DEVELOPMENT OF THE INTERMODAL TRANSPORT IN BSEC REGION CONNECTING THE BLACK, BALTIC AND CASPIAN SEAS.
Europe – Adriatic SEA - WAY Pilot Projects presentation Region of Istria Trieste, 3rd December 2015.
Djibouti Ports – DP World Jérôme Martins Oliveira
1 CONFIDENTIAL Madi Kanafin Senior specialist at Sectorial department on transport and logistics infrastructure, KAZNEX INVEST, JSC Mob:
Main Macroeconomic Data of Georgia GDP In 2014 GDP growth rate was 4.6% (Nominal GDP USD 16.5 bln.). GDP Structure: 17.5% - Trade, 16.9% - Industry, 10.4%
PUBLIC JOINT-STOCK COMPANY «STATE FOOD AND GRAIN CORPORATION OF UKRAINE»
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
International conference "Greening Motorway of the Sea" April 2005 in Stockholm “Environmental aspects of Klaipeda seaport development strategy”
NATIONAL COMPANY INDUSTRIAL ZONES Partner for Investors in Bulgaria.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Infrastructure and Shipping in Taiwan
CONTAINERS INDIA 2014 Challenges in transporting containers to Hinterland Sanjay Swarup GGM, CONCOR 20 th August 2014, Hotel Lalit, Mumbai.
Economic potential of the Volzhsky district city, Volgograd region
Port of Klaipėda.
FEZ GRODNOINVEST ADMINISTRATION
NATIONAL COMPANY INDUSTRIAL ZONES
PORT BULGARIA WEST.
Your Professional Partner
KHLIBODAR LLC - grain processor and producer of high quality grits
TOWARD EFFECTIVE OIL SPILL RESPONSE IN THE BULGARIAN SEA
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
LOGISTIC SECTOR: THE PANAMA CASE
Truck Transportation Trucksi
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Nord Quality Services Α.Ε
12thJune, 2016 Science City, Kolkata.
Terminal «Factor» Port of Ust-Luga
Presentation transcript:

Investment Project Construction of corn transloading terminal in the port Yuzhny

2 Location Area Location – Ukraine, Odessa region, port Yuzhny. Platform of the supposed construction of marine corn terminal is located on the west coast of Small Adzhalycksky Basin in 25 km to north-east of Odessa on seaside of the Black sea.

3 Project Description Marine corn terminal will be intended for receiving of corn cargos from automobile, railway transport, also intended for corn cleaning, drying, short- term storage and marine vessels shipping. Export of corn cargos will be carried out in countries of Mediterranean basin and Middle East, countries of the Indian Ocean and Southeast Asia. Shipment of corn cargos for export is provided by marine specialized vessels – bulk cargo ships.

4 Advantages of the considered plot for construction Possible connection to operating transportation lines and utility networks; Possibility to use existent water areas, water approaches, outer roads and means of navigation situation with necessity of dredging works only for creation of operational water and water approach; Possibility to use existent objects to provide all-inclusive services for fleet and vessels for duty assistant purpose; Availability of skilled manpower.

5 Key indicators of the project Construction cost, including equipment – 56 mln. $, Equipment cost – 8 mln. $ Construction period – 3,5 years Receiving of vessels – Bulk cargo ship СН – 100 Number of workers/ max. shift – 34/10 Project cargo turn-over – 4,4 mln.t per year Capacity – 5,6 mln.t per year Corn warehouse – thousand t. Projected vessel traffic – 93 vessels per year Berthing cargo front, berth (length/width) – 300/17 m Number of workers (including water and on-shores) – 187 people

6 Project visual representation

7 Project visual representation

8 Project visual representation

9 Project visual representation

10 Project visual representation

11 Project visual representation

12 Project visual representation

13 INVESTMENT- REAL ESTATE DEVELOPMENT COMPANY “TITUL” CONTACTS: President of the company: Telman Abbasov Tel.: , Site: