24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.

Slides:



Advertisements
Similar presentations
ILCSC Report KILC12 / Daegu Jonathan Bagger Chair, ILCSC Johns Hopkins University 4/23/12.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Industry and the ILC B Barish 16-Aug May-05ILC Consultations - Washington DC2 Why e + e - Collisions? elementary particles well-defined –energy,
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
HiGrade WP2 & WP4 Coordination & Governance Brian Foster (Hamburg/DESY/Oxford & GDE) HiGrade Meeting LAL/Orsay 12/10/11.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
Long Range Planning Pier Oddone September 24, 2007.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
14-Nov-11 PAC - Prague Global Design Effort 1 Barry Barish PAC - Prague 14-Nov-11 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa ILCSC Chair LCWS06 at IISc Bangalore March 9, 2006.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
FALC Was “Funding agencies for linear collider” Now “funding agencies for large colliders” WHY ??
WWSWWS The WWS Roadmap for ILC Detectors by F. Richard LAL/Orsay.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Barry Barish KILC12 Daegu, Korea 23-April-12 Global Design Effort Director’s Report Grooved Insert for CesrTA Wiggler Global Design Effort 1 23-April-12.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
SiD – Beyond Snowmass Andy White University of Texas at Arlington for the SiD Concept 1/18/2013SiD Beyond Snowmass A. White.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
ILC communication InterAction Collaboration 14 July 2011 Leah Hesla ILC communication at InterAction Collaboration meeting.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
CLIC work program and milestones
Introduction to ASTeC Programmes
Report on plan to produce an Engineering Design Report
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
Yasuhiro Okada, Executive Director, KEK
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program

24-Aug-11 ILCSC -Mumbai Global Design Effort 2 Post-2012 ILC Interim Goals & Organization GDE will have successfully completed its mandate after TDR & PIP delivered + reviewed (mid-2013 at latest) What should follow GDE (mandate and organization) for an interim 3-5 year period? See GDE position paper submitted to ILCSC Aug The paper addresses: –Technical Goals proposed for program? Continued system demonstrations; Increasing energy reach – Organizational Issues for post GDE? What are primary GDE assets that should be preserved? What are the primary GDE weaknesses that should be improved?

Post-2012 ILC Next big milestone following TDR will be for global particle physics community to propose an ILC construction project, informed by LHC results. –Likely 3-5 year interim period The global ILC GDE core accelerator and technology team needs to remain intact and continue development of the project in collaboration with the physics community which will propose the linear collider. We propose this interim period be for a nominal three years, by which time much should be clarified regarding whether and in what form the ILC should go forward. 24-Aug-11 ILCSC -Mumbai Global Design Effort 3

24-Aug-11 ILCSC -Mumbai Global Design Effort 4 CY Technical Design Report complete Baseline established ILC 2015 Technical design & R&D program ILC possible timeline SRF system tests TDR reviews Site EOI’s Cost Estimating Decision to proceed Site/host established Project Implementation Plan completeXFEL operation LHC Physics Run 1Physics Run 2Interconnect repair Existence of low- lying SUSY known Higgs energy scale known timegap

24-Aug-11 ILCSC -Mumbai Global Design Effort 5 CY Technical Design Report complete Baseline established ILC 2015 Technical design & R&D program ILC possible timeline SRF system tests TDR reviews Site EOI’s Cost Estimating Decision to proceed Site/host established Project Implementation Plan completeXFEL operation LHC Physics Run 1Physics Run 2Interconnect repair Existence of low- lying SUSY known Higgs energy scale known timegap

Interim Period (3-5 yrs) Project oriented accelerator and technology R&D –Strengthen and further integrate joint work with CLIC –Pursue technical and design overlaps w/ XFEL, Super-B, Project X, JLab & SNS upgrades, etc. Two primary missions? –Accelerator Design and Integration (with physics and detector groups) Incorporate new R & D results; develop options for running at other energies; analyze site specific designs –Coordination of R&D on improving the performance and reducing the cost of the SCRF systems. Deploy SRF linac test facilities for value engineering aimed at reducing the remaining cost risk and pursuing higher gradient for ~1 TeV extension of ILC. 24-Aug-11 ILCSC -Mumbai Global Design Effort 6

Features of post-2012 organization Features of GDE global organization to preserve –Maintaining ‘core competencies’ –ILC director to provide overall intellectual and project leadership, and to represent the global interests of the ILC –The equivalent of the GDE Regional Directors role to reconcile resources, differently in each region –The equivalent of the Project Managers function to coordinate technical program, following global priorities and maintaining coherence in the distributed efforts –Make technical decisions and set priorities accepted worldwide and to lead the unified global effort and design. –Organize the ILC efforts with sufficient autonomy from the laboratory and agency programs and priorities –The small GDE common fund enables flexibility to support some global efforts like costing, electronic data bases, publications, outreach, etc. 24-Aug-11 ILCSC -Mumbai Global Design Effort 7

Features of post-2012 organization (2) Features of GDE global organization to improve –The “virtual” nature of the GDE, while essential to be able to make use of the expertise distributed around the world, results in inefficiencies. How to improve? –The independent experimental and accelerator organizations for ILC design and R&D should be better integrated. –The independence of ILC and CLIC programs (although improving) has causes problems and duplication of effort. –The lack of access to CERN resources for the global ILC/GDE efforts has been a difficulty, especially where specialized expertise and experience are needed. This has hampered the European contributions toward the ILC. –The GDE has relied on informal agreements with HEP Laboratories, even on major R&D programs, rather than a more formal work package system, making it difficult to maintain priorities and meeting critical schedules 24-Aug-11 ILCSC -Mumbai Global Design Effort 8

Final Remarks Timing issues for new post-2012 ‘GDE’ replacement –The GDE remain in place into 2013 for two main reasons: To represent the TDR design for independent (and possibly agency) reviews of the technical design, as well as for cost reviews and to facilitate translations to local costing systems. Following these reviews, the GDE will need to finalize the TDR An overlap period with the new interim ILC organization will be required, while the new organization becomes established and can assume control of the program. We believe a period of months following TDR submission will be required before the transition is completed. –The GDE replacement needs to be in place by beginning of 2013 and fully operational in 6-12 months 24-Aug-11 ILCSC -Mumbai Global Design Effort 9

Final Remarks Resource issues for new post-2012 ‘GDE’ replacement –The planned resources are less than GDE program resources: A viable follow-on ILC program can be achieved with reduced resources and a new organization having the above functionality; however it will continue to be very difficult to substantially update and improve the design without increasing the resources, especially engineering resources. In other words, it will require more, not less, resources to move the project closer to being construction ready. –The mandate for the GDE replacement must realistically consider the likely available resources during the immediate period following completion of the TDR. 24-Aug-11 ILCSC -Mumbai Global Design Effort 10