ATLAS upgrades Xmass meeting 2008. Current ATLAS Operations ATLAS has been working very well  First beams in Sept recorded successfully by all sub- detectors.

Slides:



Advertisements
Similar presentations
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
Advertisements

L1 Track Trigger for ATLAS at HL-LHC
Development of a track trigger based on parallel architectures Felice Pantaleo PH-CMG-CO (University of Hamburg) Felice Pantaleo PH-CMG-CO (University.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Valeria Perez Reale University of Bern SM Higgs Discovery Channels ATLAS High Level Trigger Trigger & Physics Selection Higgs Channels: Physics Performance.
A Fast Level 2 Tracking Algorithm for the ATLAS Detector Mark Sutton University College London 7 th October 2005.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
Tracking at the ATLAS LVL2 Trigger Athens – HEP2003 Nikos Konstantinidis University College London.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
The Region of Interest Strategy for the ATLAS Second Level Trigger
HEP 2005 WorkShop, Thessaloniki April, 21 st – 24 th 2005 Efstathios (Stathis) Stefanidis Studies on the High.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Tracking at Level 2 for the ATLAS High Level Trigger Mark Sutton University College London 26 th September 2006.
AFP Introduction September 10th 2014 M. Bruschi, INFN Bologna (Italy) 1.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
ATLAS Trigger Development
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Anatoli Romaniouk, 3 March 2009 ACES Track trigger in ATLAS? Track trigger in ATLAS? Anatoli Romaniouk Moscow Physics and Engineering Institute.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
Mike AlbrowFP420 – May Timing and Pile-up Considerations 1 Pile-up in trigger and pile-up off-line (HLT) very different issues. Here I consider.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
Backup slides Z 0 Z 0 production Once  s > 2M Z ~ GeV ÞPair production of Z 0 Z 0 via t-channel electron exchange. e+e+ e-e- e Z0Z0 Z0Z0 Other.
QCD Prospects for ATLAS Rainer Stamen Universität Mainz On behalf of the ATLAS collaboration QCD 06 Montpellier, July 3rd 2006.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
Analysis Meeting, November 9-11, 2003 Manuel Calderón de la Barca Sánchez Heavy Flavor Working Group Heavy Flavor in ‘04: Prospects for J/ . Heavy.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
More technical description:
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
L1Calo upgrade discussion
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Kevin Burkett Harvard University June 12, 2001
Central Exclusive Production of BSM Higgs bosons decaying to jets
The First-Level Trigger of ATLAS
Commissioning of the ALICE-PHOS trigger
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Installation, Commissioning and Startup of ATLAS & CMS Experiments
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

ATLAS upgrades Xmass meeting 2008

Current ATLAS Operations ATLAS has been working very well  First beams in Sept recorded successfully by all sub- detectors  Long cosmic runs with the full detector in Oct-Nov Very useful for calibration and alignment Very useful sub-detector synchronization and full system tests UCL very visible in ATLAS operations through  Atlantis running online at the ATLAS Control Room (NikosK, SebastianB, ZdenekM, AdamD)  L2 track trigger used for selecting good cosmics (NikosK, ErkcanO, CatrinB, MarkS)  SCT operations (MattW, MartinP) ATLAS Upgrades2

3 Timelines & SLHC parameters Two phase upgrade in LHC luminosity  Phase I: ~2013: → 3x10 34  Phase II: ~2017:→10 35 Machine parameters at and some relevant numbers  Two possible scenarios ParameterScenario AScenario B Bunch crossing 25ns50ns rms bunch length 7.55cm(gauss)11.8cm(flat) pp events per x-ing Distance between pp events in z ~1mm ATLAS Upgrades

Upgrade plans & UCL involvement Independent of SLHC schedule  Forward physics detectors for ~2012 (UCL) (MarioC, PeterS, GordonC, MattW, ChrisT, JamesR)  New innermost Pixel Layer for ~2013 For 2017  A brand new Tracker (UCL) (JonB, MatthewW, MattW, MartinP, JanetF)  Upgrades on electronics of all sub-detectors  Trigger-DAQ upgrade (UCL) (NikosK, MarkL, DaveW, IlijaB, GordonC, MattW) 4ATLAS Upgrades

FP220 FP420 Forward detectors: Atlas Forward Physics Cold region of LHC Too far for L1 trigger FP220  *=0.5 x L =P’/P beam =  −  FP420 5ATLAS Upgrades

Forward detectors: 3d silicon for position Quartz Two technologies for timing detector Aim: ~20 ps resolution for first period, 10 ps (3 mm) for the high- lumi running (not there yet) Much reduced voltage, better rad hardness than planar silicon. Developed by Manchester Detector technologies for AFP 6ATLAS Upgrades Gastof

UCL involvement Software and DAQ convener, member of management board (MarioC) Integration with Athena, interface with beam transport code (PeterS) DAQ, link with CTP (GordonC, MattW) Beam Position Monitors (AlexeyL) Participation in test-beams (ChrisT, JamesR) 7ATLAS Upgrades

8 Physics motivation & Trigger needs for SLHC Increased sensitivity in the (multi-)TeV region  Quark substructure, new forces, heavy SUSY Low rates, easy to trigger with high E T threshold triggers Improved understanding of LHC discoveries, observation of rare processes, EW constraints  Higgs couplings/self-couplings, SUSY properties  H→ , FCNC top decays, multiple gauge boson production, triple/quartic gauge boson couplings These would lead to objects of similar range of p T as at the LHC, hence similar trigger thresholds ATLAS Upgrades

9 ATLAS trigger challenge at SLHC Essential to retain and enhance our flexibility to tune the trigger to select new physics Greatest challenge will be L1  Much higher occupancy, so even 100KHz L1A rate will require much higher readout bandwidth, esp. for the tracker. Alternatives:  Rely more on multi-object triggers Not without consequences: e.g. L1 single muon geom. acceptance ~80%, double muon  =(80%) 2 Increased probability for trigger objects to come from different pp collisions  Raise p T thresholds (wrt ) Studies a few years back, suggested we may have to go up to 60GeV at L1 for single e/  triggers  The L1 e/  rates fall much smoother above ~30GeV Not long before physics suffers; risky if only handle is p T thresholds  Most L1A events are still “garbage” – can we enhance the physics composition of the L1A events, without going to extreme thresholds? ATLAS Upgrades

10 L1Track trigger ideas Cannot readout the whole tracker at 40MHz Alternatives:  Processing in parallel with L1Calo and L1Muon Would require dedicated tracker layers for triggering or clever ideas to reduce the amount of data on the detector (or both) Info from L1Calo/Muon/Track combined at CTP  “RoI” based processing, using L1Calo/Muon info Would require deeper pipelines for all ATLAS sub-systems (256bx?) Tracker regional readout has to be initiated, and completed in ~2  s  “L1.5 track trigger” A hardware-based track trigger making decision in O(10-100)  secs after L1A Would allow perhaps a higher L1A rate (~200KHz?), but can detectors sustain such readout rate? None is easier than the others

ATLAS Upgrades11 RoI based idea: Level Zero Accept L1Muon/Calo reduces the rate from 40MHz to ~500KHz. At 500KHz, it identifies Region of Interest (RoI) and propagates info to Tracker  Cone/tower small near the Calos, opening up near the beamline RoI mapped to affected modules/supermodules/RODs Level Zero Trigger (L0A) targeted at individual modules Would need complete redesign of readout electronics Latency still an issue 2.0μsLevel-0 (current Level-1...) identifies features. Maps to modules. Issues L0A 1.0μsCable to detector (and back again) 1.0μsLevel-0 event readout from tracker 2.0μsLevel-1 decision. Issue L1A 0.5μsCable to detector 6.5μsTotal E M Data Token MCC SMC MCC SMC MattW

ATLAS Upgrades12 A fast pile-up simulation tool UCL had a standalone software tool to develop the L2 tracking package, IDScan, outside athena  Take space points within an RoI from athena, then use standalone code to tune pattern recognition Extended this “mini-framework” to do “fast pile-up”  Fully simulate signal events (e.g. single muons) and min. bias events  Extract space points (into a root fileA) from signal and (into a root fileB) from min-bias events  Could go one (two) step(s) back to clusters(digits)  Mix one signal event from fileA with N events from fileB to produce pile-up  Can mix space points just within an RoI IlijaB, GordonC