Midterm Presentation Capstone Team#1, Spring 2011 Irshad Ahmad KhanBalaji Srinivasan Ramakrishna AtluruVideesh Gogineni Instructor: Dr. Kwok-Bun Yue Mentor:

Slides:



Advertisements
Similar presentations
1 Rhode Island Transportation Information System. (RITIS) Spring, 2000.
Advertisements

Project Status E911 Provisioning System Royal Flush Software Kevin Francis, Jason Plaisted, Jessica St. Croix, Mike O’Connor, Derrick Hudson.
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Himendra.
Resume Extraction with Business Process Management (BPM) tools
Remotely monitor and control a DCS (Distributed Control system) system of a miniature Oil platform through a 2D representation model Presented by - Kirthy.
Resume Extraction with Business Process Management (BPM) tool Team #3 Fall Team Website :
Distributed Collaboration with Audio/Video Conferencing V C onnect Team: Priyanka Warade Kalpana Chatnani.
NMS1.0(c) Copyright Final Year Project Demonstration Dublin City University 29 th May 2003 Team Members : David ReadeTimothy Kelly
Grade Management System -Leo Barnabas Mariadoss Anthoniraj.
Team Awesome. The Five Ws of SUMS  What is SUMS? SUMS is a system designed to monitor sensors and display their information neatly.  Who is SUMS appealing.
Copyright © Team #4 CSCI 6838 Spring Ad Hoc Graphical Reports CSCI Research Project and Seminar Team #4 March 1, 2007.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
CS 160: Software Engineering October 8 Class Meeting
Prerequisite Checker Neeharika Bollepalli Masters Report, Final Defense Guidance by Dr. Dan Andresen.
Open Source Donation Management Software Laura Cassella, Matt Edmonds, Chris Reekie, Matt Wakim We would like to thank BBBS and the YWCA for the opportunity.
.NET And Java Based System Performance Monitor for the Web Capstone Group #2 CSCI6838:Research Project And Seminar Fall 2005.
By Mircea Jivoin. Objectives Achieving the warehouse management over the internet using the SOAP Web Services Achieving the warehouse management over.
1 SYS366 Lecture Visual Modeling and Business Use Case Diagrams.
Lecture 3: Visual Modeling & UML 1. 2 Copyright © 1997 by Rational Software Corporation Computer System Business Process Order Item Ship via “ Modeling.
1 RoboComm: Rule-Baseo d Scheduling for Communication Systems CSCI Research Project and Seminar Team #7 Instructor: Dr. Kwok-Bun Yue Mentor: Mr.
Solar Thermal Plant Design & Operation Suite of Tools By Team #4 Sasya Kodali, Lakshmi Yogitha Javvadi, Deepa Borra, Sukumar Bollineni Date: 10/02/2007.
LloydBank ATM Project Engineering Project Design Team: Saud Malik Brittany Johnson Joseph Garrison.
Information System Development Courses Figure: ISD Course Structure.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
RIA to visualize the health of a project Team #4 Final presentation April 17,2008.
MINICHECK ID Pro+™ V1.2 CAPSTONE TEAM # 6 SPRING
1 RoboComm: Rule-Based Scheduling for Communication Systems CSCI Research Project and Seminar Team #7 Instructor: Dr. Kwok-Bun Yue Mentor: Mr. Dilhar.
Presented by Capstone Team #1. Guidance  Instructor Name: Dr. Alfredo Perez-Davila  Mentor Name:Abbasi Dhilawala.
Ad Hoc Graphical Reports Ad Hoc Graphical Reports Copyright © Team #4 CSCI 6838 Spring CSCI Research Project and Seminar Team# 4 (
Team S07. Agenda Scope of project Global use case diagram Analysis use cases High Level design (Software Architecture) Prototype challenges faced and.
E-portfolio assessment system architecture Milen Petrov Adelina Aleksieva-Petrova 5th TENCompetence Open Workshop, Sofia October 30-31, 2008.
Meeting Scheduler Carl Fernandes Mahbubur Rahman Haque Muaz Jamshed Rahul Kotian Ramakrishnan Jayavelu Sujith John Zachariah Interim Presentation -2 on.
CampBooks UPRM’s virtual bulleting board Team#01 Abdiel Rosado Carlos Rosario Daniel Soto.
CAPSTONE PROJECT OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
EFinanceFactory Andriy Kurhanevych, development group manager.
Object Orientation in Action: A System for Designing Speech Articulation Deficiency Treatment Tonya Lynn, James Baughn, Anne Hays, Erica Langlitz, Holly.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Use Case Packets.
Deploying a service. Talk titledate2 Talk titledate3 Section SOAP Deployment.
Activity Monitoring Tool MIS 2008/2009 Software Project - Group 1 1/4 Architecture Technical Manager.
Bugflow Enhancements 12/26/2015 7:40:43 AM Team#2 Bugflow Enhancements 1 Team # 2 12/02/200 8.
Conference Calendar Software Architecture. Overall Architecture Server : Apache Tomcat WebServer Database: MySQL Server(5.0) Language: Java, HTML,CSS.
RIA to visualize the health of a project Team #4 Midterm presentation February 28,2008.
INTERPLAN RE-PLATFORM 06/14/2013. Business Problem Support and Maintenance Challenges Obsolete Technology (Codigo) Heavy Database driven business logic.
Lecture 1: Introduction – Graduation Projects Topics to Discuss in Lectures 1. Project Deliverables 2. Course grading 3. Project Concept Writing.
Meeting Scheduling System Capstone Project - Team#5 Fall2007.
CS 360: Software Engineering Course Instructor: Dr. Hamid Abdul Basit Teaching Assistant: Shamsa Abid Course Project: Campus Nav Course Project: Campus.
Bugflow Enhancements 2/9/ :53:58 PM Team#2 Bugflow Enhancements 1 Team # 2 10/07/200 8.
T Iteration Demo Tikkaajat [PP] Iteration
CSCI 6838 Capstone Project Team #2 Spring /18/20161 MiniCheck ID
ALUMNI SYSTEM DIATM ALUMNI ASSOCIATION PROJECT TEAM: RAVI KAUSHAL CS/06/70 NIKESH ANAND CS/06/67 AMIT KR. TIWARI CS/06/52 PROJECT GUIDE - NABANITA BHATTACHARYA.
T Project Review Muuntaja I1 Iteration
Tieflow Workflow Toolkit -:By:- CSCI 6831 Capstone project Instructor: Dr. Kwok-Bun Yue Mentor: Mr. Scott Hetherington Midterm Presentation 04/15/2008.
Statistics Monitor of SPMSII -High level and detailed design Warrior Team Pu Su Heng Tan Kening Zhang.
Word Guess Team (Team #4) October 8, Word Guess Team  Team Members  Chakib Kouhel:  Steve Mattingley:
1 SYS366 Week 2 - Lecture 2 Visual Modeling & UML.
Web Programming 3(3-0-6) Introduction to interactive, event-driven and dynamic web development; web programming with freeware and commercial tools;
By Jonathan Smith. Road Map Introduction Company Information Project Overview Java Web Design and Development Summary Relation to IUP Acknowledgments.
Travel Experience Website Capstone Project Hanoi, Apr 24th, 2014.
TECHNICAL ASSISTANCE FOR THE CONVERSION OF RBPAPs INTO RBMPs DATA MANAGEMENT INCEPTION WORKSHOP ESTAMBUL February Eusebio CRUZ GARCÍA.
Welcome to Adv. Java Programming
Multilevel Marketing Tree Viewer
CSE784 – Software Studio Jim Fawcett Fall 2006.
Disaster Recovery Model and Resource Tracking
Web-deployment of a Data Visualization Framework Using AJAX Technology
Sophisticated Mobile Application using Augmented reality Technology
Proposal Presentation
Project Redband StatMonitor Application
Upside Software Development Process
TEAM BARCODERS 4/29/ :10 AM4/29/ :10 AM Capstone Team # 7.
Presentation transcript:

Midterm Presentation Capstone Team#1, Spring 2011 Irshad Ahmad KhanBalaji Srinivasan Ramakrishna AtluruVideesh Gogineni Instructor: Dr. Kwok-Bun Yue Mentor: Abbasi Dhilawala

 Software Metrics  Description of the Project  Use Case Diagram  Sequence Diagram  User Interface  Architecture Flow  Requirements  Work to be done

What are Software Metrics? What are the uses of these Metrics? How do we analyze two different Metrics

Use case diagram for project user

Use case diagram for Project admin

Use case diagram for System admin

Sequence diagram for create user

Sequence diagram for displaying

Implemented GUI prototype/mock-up Helps to have an idea of look and feel Immediate feedback can be achieved The prototype can be re-used when developed with JSP

user project role

Development Environment: Eclipse Java Software: JEE 5 / JDK 6 DBMS: MYSQL Application Server: Tomcat

Completion of Database design Construction phase: Implementing the design Final phase: Testing the system, verification and validation