QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ERCOT Market Design & Operations
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Vendor Definition of DAM Commitment
Presentation transcript:

QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines on a Resource Committed by RUC

Issue: At the February meeting, the QSE Manager’s Working Group (QMWG) requested that ERCOT clarify how the RUC Buy Back process works in relation to ERCOT operator awareness, Ancillary Services responsibility, and settlement outcomes. Buy Back Process: Beginning on January 7 th, 2014, ERCOT implemented NPRR416, Creation of the RUC Resource Buyback Provision, and NPRR575, Clarification of the RUC Resource Buy-Back Provision for Ancillary Services, which instigated a process whereby the QSE has the option to Buy Back a RUC commitment any time before the end of the Adjustment period for the first hour of the block of RUC hours by changing the COP status of the Resource from ONRUC to ONOPTOUT. This action (changing COP) will communicate to ERCOT Operator, and to ERCOT settlement, that the QSE has self- committed the Resource and agrees to stay online for the duration of the RUC commitment.

Buy Back Process cont.: ONOPTOUT status in the COP will signal ERCOT settlements to remove the Resource for consideration in both the RUC Make Whole payment and the RUC Clawback charge calculations. The Resource with an ONOPTOUT status may carry Regulation Service as well as Responsive and Non-Spinning Reserve Services. When the ONOPTOUT status is evoked the QSE will not be required to price the energy of the Resource from LSL to HSL at the System Wide Offer Cap (SWOC).

The market requested that ERCOT be clear how the combined cycle resource would be treated if the RUC Buy Back provision is not evoked. ERCOT responses are as follows: 1. Can the QSE run the combined cycle train in a 2x1 if RUC committed the 1x1? The ERCOT Operator must see the amount of capacity available from the Combined Cycle Train that was specified in the RUC instruction. In other words, operating out of a 2x1 configuration if the RUC commitment was to a 1x1 configuration would be acceptable; however, the reverse would not be allowed because the 1x1 would not have the full amount of capacity that was specified in the RUC instruction.

ERCOT responses cont.: 2. How will the settlement be handled if the QSE decides to run in the 2x1 configuration when the 1x1 received RUC instruction? ERCOT Settlements will apply all revenues received by the Combined Cycle Train to the Guarantee based on the Startup, Minimum energy, and Energy Offer Curve (EOC) of the Combined Cycle configuration that received the RUC instruction per 5.7 Settlement for RUC Process.

ERCOT responses cont.: 3. If the QSE decides to run in the 2x1 configuration when the 1x1 received the RUC instruction, can the QSE set the capacity between LSL and the MW point corresponding to the capacity difference between 2x1 and 1x1 at a price lower than the SWOC? NPRR 585 says that the QSE can do it. Issues are: Very high potential for Clawback. Could cause issue when ERCOT Compliance verifies the QSE complied with the RUC instruction. That functionality would need to be automated and would require a system change. Because the RUC committed units are eligible for a make whole, should their offer be something less than SWCAP? - Make Whole eligibility is based on train not configuration for CC units

ERCOT responses cont.: 4. If the QSE decides to run in the 2x1 configuration when the 1x1 received RUC instruction can the QSE also carry AS responsibility on the 2x1? ERCOT interprets the language in Protocol 3.9 Current Operating Plan (COP) paragraph (4) to stipulate that a combined cycle Resource may not carry AS on any configuration in the combined cycle train unless the reason for the RUC commitment was specifically to provide that service, as follows: (4) A QSE must notify ERCOT that it plans to have a Resource On-Line by means of the COP using the Resource Status codes listed in Section 3.9.1, Current Operating Plan (COP) Criteria, paragraph (5)(b)(i). The QSE must show the Resource as On-Line with a Status of “ONRUC,” indicating a RUC process committed the Resource for all RUC-Committed Intervals. A QSE may only use a RUC-committed Resource during that Resource’s RUC-Committed Interval to meet the QSE’s Ancillary Service Supply Responsibility if the Resource has been committed by the RUC process to provide Ancillary Service. (italics added)