Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify.

Slides:



Advertisements
Similar presentations
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
Advertisements

15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
EU Workgroup – Mod 500 WG(4) – 16 th September 2014.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
NTS Update Gas Customer Forum 25 th September 2006.
Modification 500 slides for Workgroup
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Market Information Provision Initiative Phase 2 Nolan Robertson Market Information Team Leader.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Transfers and Trades Special Transmission Workstream
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
European Developments Transmission Workgroup 3 rd May 2012.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Proposer: Matthew Hatch Panel Date: 20/10/16
Capacity Conversion – 616s
EU Implementation Programme
CMP Transparency Requirements
Regulators’ update on Congestion Management and Balancing
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
SEP OCT NOV 6th Sep 1st Oct 1st Nov System Code is deployed
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
COR1072 Enduring Transfer and Trade Arrangements
7th July 2011 Transmission Workgroup - Elexon
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
EU/GB Charging Project – Delivery Timescales
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification 501 slides for Workgroup
EURELECTRIC transparency requirements
Review of Trade and Transfer Winter 09/10
Gas Customer Forum DN Interruption Update - Introduction
PRISMA General Information
MOD 501 Update.
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Modification 598 update 13 January 2016.
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

Pending changes to mod 500 WG(6) – CAM-CMP

Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify within day quantity rule for kWh/h:  Registered (kWh/d) = Successful bid (kWh/h) x hrs remaining in day  3.2.7) reworded - paragraph about JBP communications  Add in that CMP quantities will be published (on UK Link) before each long term auction  Suspend ad-hoc increases for Oct 2015 (IPs only)  Added the default bid rule the for first small price step round. 2

Updates Continued - Contingency  In the event of a PRISMA outage the Overruns will be suspended at IPs if the duration of the outage last for either:  6 consecutive within day auctions, at any point for a gas day  4 consecutive within day auctions, if the outage starts at 19:00 or later  (NG view that if PRISMA develops a contingency process then the enhanced overrun suspension rules for IPs will need to be reviewed). 3

Updates Continued - Transition  Auctions will commence on 31 st Oct 2015 but other capacity processes can/will be available earlier than this.  An ‘Operational Start Date’ will be added into the transition rules in the mod. On this date then the following processes will be ready and available.  PRISMA Registration  CMP Surrender  Secondary Trading  Voluntary Bundling  Date of Operational Start Date will be communicated nearer the time (but before 1 st Nov 2015).  Dependencies: Bacton Splitting and PRISMA kWh/d functionality 4

Legal Text WG(6) – CAM-CMP

Section S – Charge items (Entry)  1.1 NTS Entry Capacity - Interconnection Point Charges  (a) IP Charges in respect of Annual NTS Entry Capacity;  (b) IP Charges in respect of Monthly NTS Entry Capacity;  (c) IP Charges in respect of Daily NTS Entry Capacity;  (d) IP Charges in respect of Interruptible Daily NTS Entry Capacity;  (e) IP Entry CMP Surrender; and  (f) IP Entry LTUIOLI 6

Section S – Charge Items (Exit)  2.1 NTS Exit Capacity - Interconnection Point Charges  (a) IP Charges in respect of Annual NTS Exit Capacity;  (b) IP Charges in respect of Monthly NTS Exit Capacity;  (c) IP Charges in respect of Daily NTS Exit Capacity;  (d) IP Charges in respect of Interruptible Daily NTS Exit Capacity;  (e) IP Exit CMP Surrender; and  (f) IP Exit LTUIOLI 7

Section Y  See separate doc 8

Next Steps  Updated mod + legal text released at least 5 business days before next WG (5 th Nov).  Please review, and feedback any concerns to NG before next WG.  All being well - complete DMR on 5 th Nov.  This is in time for November panel 9